Vous êtes ici

Defense Industry Daily

S'abonner à flux Defense Industry Daily
Military Purchasing News for Defense Procurement Managers and Contractors
Mis à jour : il y a 1 semaine 6 jours

Boeing-Saab’s T-X Trainer Takes to the Skies | Antonov Rolls Out First Mil Transport Plane in Kiev | US State Dept Clears P-8A Sale to Norway

jeu, 22/12/2016 - 00:58
Americas

  • The Boeing-Saab T-X trainer offering has made its first successful flight. During the 55 minute flight, the team validated key aspects of the aircraft and demonstrated the performance of the low-risk design. Initial operating capability is planned for 2024 and could potentially replace the USAF’s fleet of T-38 trainers.

  • Staff at Northrop Grumman have been getting into the Holiday spirit, with employees volunteering to help the United Service Organizations (USO) assemble more than 1,000 care packages destined for American service members stationed overseas. The drive took place on a November 9 “Salute to the Troops” event at Baltimore Washington International (BWI) airport.

Middle East & North Africa

  • Raytheon has been awarded a $53 million foreign military sales contract to provide TOW missiles to Saudi Arabia and Jordan. The heavy assault weapon has been integrated on several land platforms by the US Army such as the Stryker, Bradley Fighting Vehicle, and ITAS High-Mobility Multipurpose Wheeled Vehicle. Work on the deal is expected to be completed by October 2017.

  • Raytheon will also supply APG-82(V)1 AESA radars to the Israeli Air Force, to be integrated on their F-15I fleet. The sale marks the first export deal for this variant of radar, designed specifically for the Strike Eagle. Israel has been keen to keep its F-15s in top operational order while it waits for the deliveries of its new F-35Is, and are even considering further procurements of the Strike Eagle. Such a move would be good news for Boeing, as they already have the fighter’s production line increased until at least 2020 due to a recent order from Qatar.

Europe

  • Ukrainian manufacturer Antonov has rolled out its first AN-132D military transport plane at its plant in Kiev. The aircraft is an evolution of the classic An-32, featuring Pratt & Whitney Canada PW150 engines and avionics supplied by Honeywell. Saudi Arabia has been a big backer in the project and are looking to procure six of the planes, and aim to eventually manufacture units in a new facility in Riyadh.

  • The US State Department has cleared the potential sale of P-8A surveillance aircraft to Norway. Five aircraft and associated systems and support, valued at $1.75 billion, will be provided in a deal aimed at upgrading Norway’s maritime surveillance capabilities. The P-8 will replace Oslo’s current fleet of P-3 Orions.

  • Serbia’s plans to purchase Russian air defense systems are believed to be moving ahead, according to their Prime Minister. Aleksandar Vucic announced that a favorable deal to procure Buk-M1 or Buk-M2 systems would be discussed during an official visit to Moscow next week. A plan to buy six MiG-29 fighter jets was also announced.

Asia Pacific

  • India is looking overseas to procure some 5,000 sniper rifles with plans to have them manufactured at home. A request for information (RFI) was issued to Blaser Jagdwaffen GmbH of Germany; Steyr Mannlicher of Austria; SIG Sauer of Switzerland; Israel Weapon Industries of Israel; Kalashnikov Concern (Izhevsk Machinebuilding Plant) and KBP Instrument Design Bureau of Russia; Armalite and Barrett Firearms Manufacturing of the United States; and Nexter and PGM Précision of France. However New Delhi may have problems getting such a deal, with an industry official commenting that such numbers are too small an order to receive offsets such as a technology transfer.

Today’s Video

First flight of Boeing-Saab T-X trainer:

Catégories: Defence`s Feeds

Raytheon Continues to Produce, Maintain TOW Missiles

jeu, 22/12/2016 - 00:52

TOW family
(click to view full)

Despite modernization that has led to advanced anti-armor weapons like the Javelin and Hellfire fire and forget guided missiles, the wire-guided, operator-controlled BGM-71 TOW missile family remains a mainstay thanks to modernization, specialization, improved sighting systems, and pre-existing compatibility with a wide range of ground vehicles. TOW remains the US Army and Marine Corps’ primary heavy anti-tank/ precision assault weapon deployed on more than 4,000 TOW launch platforms including HMMWV jeeps, the Army’s M1134 Stryker ATGM variant and M2/M3 Bradley IFVs; the Marines’ LAV-AT wheeled APC and SuperCobra attack helicopters; and numerous foreign vehicles. Designation Systems notes that more than 620,000 BGM-71 missiles of all versions had been built for all customers by 2001.

Raytheon Co. in Tucson, AZ was recently awarded a pair of contracts that illustrate its continued production and maintenance work on these missiles.

TOW 2B missile
(click for cutaway)

The first contract involves engineering services for the TOW (Tube-launched, Optically tracked, Wire-Guided) weapon system family of missiles and TOW fire control systems including: ITAS (Improved Target Acquisition System), IBAS (Improved Bradley Acquisition Subsystem), T2SS (TOW 2 Subsystem), and M220 Ground TOW. This is a one-year contract with five one-year options, and a total potential value of $122 million. See release.

The other contract is a $45 million modification to a firm-fixed-price contract for TOW 2A bunker-buster and TOW 2B top-attack missiles. Work will be performed in Tucson, AZ and is expected to be complete by Nov. 30, 2008. This was a sole source contract initiated on July 15, 2002 by the U.S. Army Aviation and Missile Command, Redstone Arsenal, AL (W31P4Q-04-C-0061).

Update

December 22/16: Raytheon has been awarded a $53 million foreign military sales contract to provide TOW missiles to Saudi Arabia and Jordan. The heavy assault weapon has been integrated on several land platforms by the US Army such as the Stryker, Bradley Fighting Vehicle, and ITAS High-Mobility Multipurpose Wheeled Vehicle. Work on the deal is expected to be completed by October 2017.

December 12/16: Morocco has been cleared to purchase Raytheon-made TOW 2A Radio Frequency Missiles. Valued at $108 million, the sale includes 1,200 TOW 2A RF missiles and 14 TOW 2A fly-to-buy acceptance missiles. Morocco is regarded as a key US ally in maintaining stability in North Africa, following the increase in jihadist activity across the region.

Catégories: Defence`s Feeds

BAE Unveils Amphibious Combat Vehicle Prototype | SK’s DAPA to Begin Developing Taurus-Class Missile | Beijing Gets Early Delivery of Four Su-35s

ven, 16/12/2016 - 00:58
Americas

  • BAE Systems has unveiled their first Amphibious Combat Vehicle 1.1 prototype, part of a $103.7 million contract to deliver 16 prototypes to the USMC. Developed to combine open-ocean amphibious capabilities with land mobility, the vehicles will provide armored transport for infantry personnel traveling from a ship to a shore. The Marine Corps expects to begin testing the prototypes in the first quarter of 2017.

  • The US Navy’s Strategic Systems Programs office has awarded BAE Systems $368 million to perform weapon system engineering services for US and UK Ohio- and Vanguard-class submarines. Tasks to be performed will include weapon system integration, engineering, and testing. BAE will also provide IT support, assist with training programs, and develop fleet documentation materials.

Middle East & North Africa

  • Boeing will supply military flight training equipment and services for the government of Saudi Arabia, following the awarding of a foreign military sales contract by the Pentagon. Valued at $59.9 million, the deal will see company provide one Database Generation System, one Full Mission Trainer, and an Integrated Avionics Trainer database to Riyadh.

Europe

  • UK PM Theresa May has come under increased pressure by opposition lawmakers and campaigners for her government’s continued support of the supply of munitions to Saudi Arabia. May came under pressure in the House of Commons following the decision by the US to limit the supply of certain munitions that have been used in military strikes by the Saudi Air Force in Yemen. In defense of the sales, May hailed the bilateral cooperation between both governments in their counter-terrorism initiatives saying that the information gained from Saudi Arabia over the years had saved countless lives.

Asia Pacific

  • South Korea’s Defense Acquisition Program Administration (DAPA) will commence research on an indigenous Taurus-class cruise missile. Development work on the missile will begin in 2018, with the aim being to produce around 200 missiles for deployment on the upcoming KAI KF-X fighter jet. Costing $690 million, the new missiles will give Seoul an increased cruise missile range from 280 km to 500 km.

  • Beijing received an early Christmas present this year with the advanced delivery of four Sukhoi Su-35 fighters from Russia. Initially expected for delivery in 2017, the shipment process was expedited to send the first batch before the new year. Signed last November, the $2 billion deal will see Russia provide China with 24 Su-35s alongside ground equipment and spare engines.

  • Despite recent diplomatic tensions between the US and the Philippines, the US State Department has cleared the $25 million sale of two Saab AN/SPS-77 Sea Giraffe 3D Air Search Radars to the archipelago’s navy. Manilla plans to install the radars on two Hamilton-class cutters acquired through the Excess Defense Articles (EDA) program which will aid them in monitoring their waters. The sale also aims to improve interoperability with the US Navy, allowing the two armed forces to collaborate on missions more effectively.

  • US aerospace and defense firms looking to increase their presence in the Asia-Pacific region are looking to next year’s International Aerospace & Defense Exhibition (ADEX) 2017. The biennial event is organized by the Korea Aerospace Industries Association (KAIA), Korea Defense Industry Association (KDIA) and the Korea Trade-Investment Promotion Agency (KOTRA), and will allow foreign firms to get closer to buyers and decision-makers there, particularly those involved in the modernization of South Korea’s defense forces. Kallman Worldwide will be organizing the US effort, with a 1,250 sqm US International Pavilion to act as a destination for buyers looking for an efficient way to meet a critical mass of US suppliers, an on-site business hub for US exhibitors looking to maximize their exposure and time at the event, and a forum for all to share ideas and insights.

Today’s Video

Taxi test of the Saab Gripen E:

Catégories: Defence`s Feeds

US State Dept Signs Off on $1.7B FMS to Kuwait | CAR Reports Islamic State Established Robust Supply Chain | Germany Seeks Further Penalties on Airbus Delays

jeu, 15/12/2016 - 00:58
Americas

  • January will see Boeing move the HQ of their defense unit from St Louis to Washington, DC. A company spokesperson said of the move, that “it is driven by our commitment to improve our ability to engage with customers and decision-makers in Washington,” and had been on the cards for some time. The announcement also coincides with a recent push by President-elect Donald Trump to get defense contractors, such as Boeing and Lockheed Martin, to cut costs, but this has been dismissed as a reason for the change of office.

  • Communication data links on all three variants of the F-35 Joint Strike Fighter have been tested by the USAF. The pilots focused on the Multifunction Advanced Data Link (MADL), a direct communications link that allows operators to transmit secure tactical information, and is beneficial for interoperability between the F-35 and the 4th generation planes it is meant to replace, such as F-16s and F/A-18s. MADL also allows for F-35s to share information on air and ground threats in order to more effectively target and engage them.

Middle East & North Africa

  • Accusations of war crimes and rising civilian casualties in Yemen has lead the Pentagon to limit military support to Saudi Arabian-led forces fighting in the country. Washington will also revamp future training of the kingdom’s air force to focus on improving Saudi targeting practices, a persistent source of concern for the Obama Administration. Riyadh will lose out on foreign military sales cases for air-dropped munitions and precision-guided munitions.

  • The US State Department signed off on a $1.7 billion foreign military sale with Kuwait for the recapitalization of 218 of the kingdom’s M1A2 tanks. Work included in the deal involves the supply of 240 M2A1 machine guns; 480 7.62 M240 machine guns; 240 AN/VRC-92E SINCGARS radios; 1,085 night vision goggles; technical support; and training services. A number of defense contractors will be included in the program, with General Dynamics, Raytheon, Meggitt, Northrop Grumman, Lockheed Martin and Honeywell, all involved.

  • Visits to former Islamic State facilities by the Conflict Armament Research (CAR) group, has resulted in a report on the state of the self-described caliphate’s arms production capabilities. Although using a range of non-standard materials and chemical explosive precursors, the jihadists have been able to establish a “robust supply chain” of raw materials from Turkey, and the technical precision of its work meant that it could not be described as “improvised” weapons production. The six facilities were located in eastern Mosul and were visited last month following the area’s reclamation by Iraqi special forces.

Europe

  • Germany will still seek to give further penalties to Airbus over the severe delays experienced to the delivery of A400M Atlas transport aircraft. A Defense Ministry report to parliament stated that the European multinational A400M program is years behind schedule, with Germany’s share of the costs having risen to 9.6 billion euros ($10.2 billion) from an initial estimate of 8.1 billion euros. Initial aims of the program would have seen Germany receive 11 A400Ms in 2016, for a total of 17. Instead, it will have received just seven by the end of the year.

  • Saab will provide RBS 70 simulators to the Lithuanian Armed Forces. Lithuania, having imported the portable air defense system since 2004, will see the inclusion of the simulators as a significant improvement to their training capability, allowing for soldiers to practice their deployment and engagement of targets in an exact “virtual” replication of the real world environment that they operate in. Under the contract, Saab will work with the Lithuania-based Baltic Institute of Advanced Technology to integrated customized 3D maps into the simulators. Deliveries are expected to begin in 2018.

Asia Pacific

  • Delivery of the first of five leased TC-90 aircraft from Japan to the Philippines will take place in March, 2017. In addition, it was announced that equipment previously stripped from the aircraft by the Japan Maritime Self-Defense Force will be replaced with new avionics before delivery. Manilla plans to use the TC-90s for humanitarian assistance, disaster relief, rescue operations and maritime security patrols.

Today’s Video

It’s been 10 years since the F-35’s maiden flight. Testimony from Lockheed Martin test pilot Jon Beesley:

Catégories: Defence`s Feeds

Digital Abrams: The M1A2 SEP Program

jeu, 15/12/2016 - 00:57

M1A2 SEP
(click to view full)

America’s M1 Abrams tanks come in a number of versions. In addition to the M1A1 that is now standard, the US Army is beginning to field its M1 TUSK for urban warfare. It also operates the M1A2 System Enhancement Program (SEP), currently the most advanced standard variant.

This Spotlight article covers the M1A2 Abrams SEP upgrade program, and will be updated and backfilled as new contracts are issued and key events take place.

M1A2 SEP: Additional Background

Some SEP upgrades
(click to view full)

The M1A2 SEP is builds on the digitized M1A2 platform with an improved armor package of third generation steel-encased depleted uranium armor, a new command and control system, second-generation FLIR thermal sights that include a Commander’s Independent Thermal Viewer (CITV) for “hunter-killer” operation, the Under Armor Auxiliary Power Unit (UAAPU) that lets crews run key electronics without running the engine, and a Thermal Management System (TMS – i.e. air conditioning for crew & electronics). The M1A2 SEP also features enhanced electronics like color maps and displays, improved networked communications, high-density computer memory and increased microprocessing speed, a more user friendly “Soldier Machine Interface (SMI)”, and an open operating computing system that will make future upgrades and additions easier.

The M1A2 SEP’s advanced FLIR/thermal sights are part of the US Army’s Horizontal Technology Integration (HTI) Second Generation Forward Looking Infrared (HTI SGF) sighting systems program, which creates commonality with other vehicles like the M2/M3 Bradley IFVs.

The M1A2 SEP is a formidable upgrade package, but it was missing a small but crucial item. Troops in Iraq and elsewhere are also clamoring for a phone on the outside of the tank that will let them talk to the vehicle crew. This was common as far back as World War 2, and its lack is hampering coordination on the modern battlefield – especially in urban areas. A General Dynamics representative noted that future M1A2 Abrams TUSK (Tank Urban Survivability Kit) vehicles will have this feature, but the SEP v1 tanks did not.

M1A2 SEP Version 2 configuration, which is just beginning to appear, fixes this. It adds improved displays, sights, and power systems compared to earlier SEP versions – plus the tank-infantry phone. Recent orders also added a CROWS-II top-mounted machine gun with advanced sights. The CROWS system can be controlled from inside the tank using a joystick and screen, removing the need to open the hatch and expose the crews to snipers. SEPv2 is the most technologically advanced digital Abrams tank, and is also positioned for future communications and other technology updates.

Recent budgets for M1A1 enhancements, including both M1A1-Situational Awareness and M1A2 tanks, include:

  • FY 2010: $278.8 million for 22 tanks ($93.8M RDT&E, $185.0M procurement)
  • FY 2011: $294.4 million for 21 tanks ($93.6M RDT&E, $182.0M procurement, $18.8M spares)
  • FY 2012: $583.9 million for 63 tanks ($9.3M RDT&E, $567.4M procurement, $7.2M spares)
  • FY 2013 Request: $300.8 million, ($97.3M RDT&E, $203.5M procurement) meant to “complete the final [SEP] production, fielding, and training” – 20-24 tanks by some reports.
  • FY 2014 Request: $297.4 million ($101.3M RDT&E, $178.1M procurement).

M1A2 SEP: Related Contracts

Commander’s Display Unit

The Armor Site notes that:

“A multi-year contract for 307 M1A2 Abrams Systems Enhancement Program (SEP) tanks was awarded in March 2001 with production into 2004. The current Army plan allows for a fleet of 588 M1A2 SEP, 586 M1A2 and 4,393 M1A1 tanks. The potential exits for a retrofit program of 129 M1A2 tanks to the SEP configuration between 2004 and 2005… The US Army decided to cancel future production of the M1A2 SEP from FY2004, but in June 2005 ordered the upgraded of a further 60 M1A2 tanks to SEP configuration.”

That program has now grown very substantially, and a 2007 contract added 435 more more M1A2 SEPs. Orders have continued to come in, and General Dynamics says that the current multi-year award set will complete the modernization of all M1 tanks in the active-duty army to M1A2 SEP standard. By 2014, however, their interest in keeping the facility running led supportive members of Congress to continue spending money on the program, over the Army’s objections.

Unless otherwise specified, all contracts are awarded by The U.S. Army Tank-Automotive and Armaments Command (TACOM) in Warren, MI; and the recipient is General Dynamics Land Systems in Sterling Heights, MI.

FY 2011 – 2017

December 15/16: The US State Department signed off on a $1.7 billion foreign military sale with Kuwait for the recapitalization of 218 of the kingdom’s M1A2 tanks. Work included in the deal involves the supply of 240 M2A1 machine guns; 480 7.62 M240 machine guns; 240 AN/VRC-92E SINCGARS radios; 1,085 night vision goggles; technical support; and training services. A number of defense contractors will be included in the program, with General Dynamics, Raytheon, Meggitt, Northrop Grumman, Lockheed Martin and Honeywell, all involved.

Jan 31/14: +12. A $72.7 million firm-fixed-price contract for 12 M1A2 SEPv2 tanks.

$15.7 million in FY 2013 funds are committed immediately. other procurement funds in the amount of $15,712,969 were obligated at the time of the award. Work will be performed in Lima, OH; Scranton, PA; Anniston, ALA; and Tallahassee, FL; and will run until Dec 31/15. One bid was solicited with one received. With Israel’s Namer heavy IFV order facing significant cuts, any production at Lima surely be welcomed (W56HZV-14-C-0054).

April 29/13: Keep spending. Congress is looking to spend funds over and above the Pentagon’s request, in order to keep General Dynamics Land Systems running at a higher rate. The Lima plant is reportedly producing about 5 M1A2S upgrade kits per month for Saudi Arabia, and 4 M1A1M kits per month for Egypt, plus production of Israeli Namer ultra-heavy Infantry Fighting Vehicles. Of the Army’s 2,400 tanks, about 1,500 – 1,600 have reportedly received the $7.5 million MA2SEPv2 upgrade. The US Army had wanted to stop buying tanks until 2017, using funds for R&D to produce an updated M1 variant.

Congress has other ideas, and $468 million is a consistently-used figure for the extra spending, but that isn’t broken down clearly. What is clear is that the US Army has said it doesn’t want or need more M1A2s, and wants to spend the money elsewhere at a time when its reducing training and maintenance. Congress disagrees for a combination of industrial reasons involving the restart costs of drying up the sub-contractor chain (and killing some of their firms), and political reasons involving jobs in a state with powerful representatives and outsize significance in Presidential politics. AP | CS Monitor.

April 10/13: FY 2014 Budget. The President releases a proposed budget at last, the latest in modern memory. The Senate and House were already working on budgets in his absence, but the Pentagon’s submission is actually important to proceedings going forward. See ongoing DID coverage. With respect to the M1 fleet, the budget would spend $279.4 million ($101.3M RDT&E, $178.1M procurement) to:

“…maintain the armor facility at a sustainable level and minimize loss of skilled labor. It also procures numerous approved modifications to fielded M1A2 Abrams tanks, including the Data Distribution Unit (DDU) to enable network interoperability, the Vehicle Health Management System (VHMS), loader tray modification to improve safety and the Commander’s Remote Operating Weapon Station (CROWS).”

April 25/12: General Dynamics Land Systems in Sterling Heights, MI wins a $31.1 million firm-fixed-price contract to create 46 Abrams M1A2 SEPv2 vehicles from existing stocks, by installing the upgrade kits.

Work will be performed in Lima, OH; Scranton, PA; Anniston, AL; and Tallahassee, FL, with an estimated completion date of Nov 30/14. One bid was solicited, with 1 bid received (W56HZV-12-C-0198).

Dec 23/11: +21. A $59.9 million firm-fixed-price contract modification to buy Abrams M1A2 System Enhancement Packages and CROWS weapon stations. Based on past contracts, this will cover 21 M1A2 SEPv2 kits, and finish funding for the planned 435 tanks under the program, though an installation contract may still be forthcoming.

Work will be performed in Lima, OH; Tallahassee, FL; Anniston, AL; Scranton, PA; and Sterling Heights, MI, with an estimated completion date of June 30/13. One bid was solicited, with one bid received (W56HZV-06-G-0006).

March 1/11: A $59.1 million firm-fixed-price contract for up to 21 Abrams M1A2 SEPv2 upgrade tanks. That means full materials and labor for the upgrades.

Work will be performed in Lima, OH; Tallahassee, FL; Anniston, AL; Scranton, PA; and Sterling Heights, MI, with an estimated completion date of June 30/13. One bid was solicited with one bid received (W56HZV-06-G-0006).

FY 2008 – 2010

M1A2 SEPv2, Iraq
(click to view full)

March 5/10: +22. A $62.1 million firm-fixed-price contract covers Program Year 4, Increment 2 of the Abrams multi-year contract. The Army is buying full materials and labor for 22 M1A2 SEPv2 upgrades.

General Dynamics Land Systems says that before this recent “call-up” of 22 kits, 371 of the 435 total vehicles had been funded. Now, only 42 vehicles require funding, and they expected to be taken care of in the next 2 increments around January 2011 and 2012. These “funding years” are different from “program years”, and PY 4 is expected to cover 39 M1A2 SEPv2s.

Work is to be performed in Lima, OH (75%); Tallahassee, FL (10%); Anniston, AL (9%); Scranton, PA (3%); and Sterling Heights, MI (3%), with an estimated completion date of Nov 30/12. TACOM in Warren, MI issued the contract (W56HZV-06-G-0006).

Sept 14/09: CROWS. An $18.2 million unfinalized Change Order Modification firm-fixed-price multi-year contract to buy up to 370 Commanders Remote Operated Weapons Stations version 2 kits (CROWS II) for M1A2 SEPv2 upgrade vehicles. Work is to be performed in Lima, OH with an estimated completion date of Aug 31/12 (W56HZV-06-G-0006).

March 2/09: A $9.8 million firm-fixed-price, firm fixed price level of effort, cost plus fixed fee contract to provide parts for the reset material necessary to allow Anniston Army Depot (ANAD) to reset 5 Battle Damaged M1 SEPv1 tanks to a SEPv2 configuration, with a 100% option to RESET another 5.

Work is to be performed at Sterling Heights, MI, with an estimated completion date of Aug 31/10 (W56HZV-06-G-0006).

Feb 24/09: A $32 million firm-fixed-price contract change order issued to RESET 129 of the 3rd Armored Cavalry Regiment’s Abrams SEPv2 tanks.

Work is to be performed at Lima, Ohio, (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%), with an estimated completion date of Sept 30/10. One bid was solicited and one bid received (W56HZV-06-G-0006).

Feb 3/09: A $5.9 million firm fixed price contract change order to buy improved ammunition racks, as part of a RESET program for 90 M1A2 SEPv1 tanks that are being upgraded to SEPv2.

Work is to be performed at Lima, OH (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%), with an estimated completion date of Sept 30/10 (W56HZV-06-C-0006).

Jan 27/09: +24. An $80.7 million firm-fixed-price contract for the Abrams Multi-Year Contract’s program year 2, increment 2. This contract buys 24 M1A2 SEPv2 upgrades, and funds 6 more tanks in program year 3, increment 1, for a total of 30.

Work will be performed at Sterling Heights, MI, with an estimated completion date of June 30/12. One bid was solicited and one bid received (W56HZV-06-G-0006). GDLS release.

Nov 20/08: +180 RESET. A $63.7 million firm-fixed-price contract, exercising an option to RESET 180 Abrams M1A2 SEPv1 to SEPv2 tanks. Work will be performed in Tallahassee, FL, Anniston, AL, Scranton, PA, and Sterling Heights, MI, with an estimated completion date of Sept 30/10. One bid was solicited and one bid was received (W56HZV-06-G-0006).

See also Aug 5/08 entry, and the GDLS release.

Aug 29/08: General Dynamics Lands Systems Division in Sterling Heights, MI received a $30.8 million cost-reimbursable contract to procure long-lead-materials. These materials will be bought in as a prelude to upgrading 129 Third Armored Cavalry Regiment Abrams tanks to the M1A2 SEP configuration.

Work will be performed in Lima, OH; Tallahassee, FL; Anniston, AL; Scranton, PA; and Sterling Heights, MI, with an estimated completion date of Oct 31/09. One bid was solicited, and one bid was received (W56HZV-06-G-0006).

Aug 5/08: A $613.5 million Firm Fixed Price, contract for Award Program Year One increment 2, in a multi-year contract for Abrams M1A2 SEPv2 upgrades. The contract will upgrade 235 M1A1 tanks to this configuration.

The order was made under a multi-year contract (see Feb 7/08 entry) which authorized the modernization of 435 M1A1 tanks that have been in the Army’s inventory for more than 20 years. An additional 180 tanks remain to be upgraded through the program, which will complete the conversion of all tanks in the Army’s active component to the M1A2 SEP V2 configuration.

Work will be performed in Lima, OH; Anniston, AL; Tallahassee, FL; Sterling Heights, MI; and Scranton, PA, and is expected to be complete by Oct 31/11. There was one bid solicited from the manufacturer on Oct 5/07, and one bid was received (W56HZV-06-G-0006). See also GDLS release.

June 3/08: A $19.8 million cost-reimbursable-no-fee contract for the procurement of long lead material to support maintenance of 3rd Armored Cavalry Regiment Abrams M1A2 SEP tanks. Work will be performed primarily in Lima, OH and is expected to be complete by Oct 30/09. One bid was solicited on April 29/08 (W56HZV-06-G-0006).

April 28/08: A $28.2 million cost-no-fee contract for long lead materials, which will be used in the recapitalization of M1A2 SEPv1 tanks. Work will be performed primarily in Lima, OH and is expected to be complete on Nov 28/08. One bid was solicited on Jan 18/08 (W56HZV-06-G-0006).

Feb 7/08: Multi-Year SEP contract. A $39.5 million firm-fixed price contract to upgrade 20 Abrams tanks to M1A2 SEPv2 standard. Work will be performed in Anniston, AL; Tallahassee, FL; Sterling Heights, MI; Lima, OH; and Scranton, PA. The upgrade program is expected to be completed by June 30/13. One bid was solicited on Oct 5/07, and 1 bid was received by the U.S. Army TACOM Life Cycle Management Command in Warren, MI (W56HZV-06-G-0006). General Dynamics says that this award is in addition to the Jan 15/08 award to fund parts for the upgrades.

General Dynamics announces that this is just the first increment of a $1.5 billion multi-year contract to upgrade 435 M1A1 Abrams main battle tanks to M1A2 SEPv2 configuration. They add that this multi-year procurement contract “will complete the modernization of all remaining M1A1 tanks which have been in the US Army’s inventory for more than 20 years.”

Multi-year contract: 435

Jan 15/08: A $12.4 million cost-no fee contract “for system enhancement package upgrade vehicles.” Work will be performed in Lima Army Tank Plant, OH, and is expected to be complete by April 30, 2008. One bid was solicited on Oct 5/07, and 1 bid was received (W56HZV-06-G-0006).

Dec 19/07: +180 RESET. General Dynamics Land Systems announces a $257.8 million award for procurement of materials and labor required to RESET 180 Abrams tanks under the Abrams Improved SEP Reset (ISR) program. The program could total more than $320 million if all options are exercised. As part of the Improved Systems Enhancement Package (SEP) Reset program, M1A2 SEP Version 1 tanks are modified to the SEP Version 2 configuration.

Deliveries begin in September 2009, and are expected to be complete by September 2010. Work will be performed by existing employees in Anniston, AL; Tallahassee, FL; Lima, OH; Sterling Heights, MI; and Scranton, PA. There was 1 bid solicited on Feb 13/07, and 1 bid was received (W56HZV-06-G-0006).

Nov 19/07: +240 RESET. General Dynamics Land Systems received an $88.8 million firm-fixed-price contract for reset of 240 M1A2 Abrams tanks. Work will be performed in Lima, OH and is expected to be complete by Sept. 30, 2009 (W56HZV-06-G-0006).

As part of the reset program, M1A2 SEP Version 1 tanks are upgraded to the SEP Version 2 configuration. GDLS release.

Oct 3/07: A $16.5 million delivery order as part of a $24 million firm-fixed-price contract to provide parts for the reset of battle-damaged SEPv1 Tanks to a SEPv2 configuration. Work will be performed in Sterling Heights, MI, and is expected to be complete by Dec. 31, 2009. This was a sole source contract initiated on May 14, 2007 (W56HZV-06-G-0006).

Oct 1/07: A delivery order amount of $20.1 million as part of a $510.5 million firm-fixed-price contract for reset of Abrams M1A2 System Enhancement Packages to the M1A2 Tanks. As part of the Improved Systems Enhancement Package (SEP) reset program, M1A2 SEP Version 1 tanks are modified to the SEP Version 2 configuration, which includes improved displays, sights, power, and a tank-infantry phone. It is the most technologically advanced digital Abrams tank and is positioned for future technology insertions for compatibility with the Army’s Future Combat Systems.

Work will be performed in Lima, OH (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%), and is expected to be complete by Sept. 30, 2009. This was a sole source contract initiated on Oct. 20, 2006 (W56HZV-06-G-0006). GD release.

FY 2005 – 2007

M1A2, getting the range
(click to view full)

Aug 13/07: A delivery order amount of $5.7 million as part of a $6.3 million firm-fixed-price contract for spare parts for the M1A2 System Enhancement Program Tank. Work will be performed in Lima, OH and is expected to be complete by July 31, 2010. This was a sole source contract initiated on May 14, 2007 by the U.S. Army Tank-Automotive and Armaments Command in Rock Island, IL (DAAE20-02-G-0009).

Aug 8/07: +???. The full delivery order amount of $270.6 million as part of a firm-fixed-price contract for system enhancement package for the Abrams M1A2 Tanks. Work will be performed in Lima, OH (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%), and is expected to be complete by July 31/10. Contract funds will not expire at the end of the current fiscal year. This was a sole source contract initiated on March 16, 2007. The U.S. Army Tank-Automotive and Armaments Command, Warren, Mich., is the contracting activity (W56HZV-06-G-0006).

Aug 8/07: +???. The full delivery order amount of $139.3 million for retrofit of M1A2 Vehicles to M1A2 SEP Version 2 configuration. Work will be performed in Lima, OH (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%), and is expected to be complete by Jan 31/10. This was a sole source contract initiated on Feb. 21/07 (W56HZV-06-G-0006).

Specific details re: numbers et. al. are usually present in General Dynamics’ follow-on releases; not this time.

April 18/07: The full delivery order amount of $9.1 million as part of a cost contract for long-lead material for RESET for battle damaged M1A2 System Enhancement Package tanks. Work will be performed in Anniston, AL (40%), Lima, OH (20%), Sterling Heights, MI (10%), and Scranton, PA (30%), and is expected to be complete by June 30, 2007. This was a sole source contract initiated on April 10, 2007 (W56HZV-06-G-0006). GDLS release.

Dec 4/06: +312 RESET. A delivery order amount of $305 million as part of a $351 million cost contract for RESET of Abrams M1A2 System Enhancement Package (SEP)v1 to M1A2 SEPv2 tanks, and long lead material for the additional RESET of M1A2 SEPv1 and M1A2 SEPv2 tanks. A GDLS representative confirms that the contact covers 312 tanks returning from Operation Iraqi Freedom.

Work will be performed in Lima, OH (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%), and is expected to be complete on Sept. 30, 2009. This was a sole source contract initiated on Oct. 20, 2006 (W56HZV-06-G-0006).

Nov 27/06: +180. The full $379.8 million delivery order amount of a firm-fixed-price contract to upgrade 180 M1A2 tanks to Abrams M1A2 SEP Version 2 status, along with total packing fielding material for initial fielding. Work will be performed in Lima, OH (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%), and is expected to be complete by Nov 30/09. This was a sole source contract initiated on August 29, 2006 (W56HZV-06-G-0006). See also GDLS press release, and a subsequent release which gives the number. A GDLS representative confirmed that the conversions involved M1A2 tanks.

Nov 27/06: GM subsidiary Allison Transmission in Indianapolis, IN received an $11 million modification to a firm-fixed-price contract for Zero-Timed X1100-3B Transmissions in Support of the System Enhancement Package RESET Program. This would be the RESET maintenance program for M1A2 SEP tanks. Work will be performed in Indianapolis, IN and is expected to be complete by Nov. 30, 2007. This was a sole source contract initiated on Aug. 22, 2006 (DAAE07-01-C-N040).

Nov 27/06: GM subsidiary Allison Transmission in Indianapolis, IN received a $32.6 million modification to a firm-fixed-price contract for Zero-Timed X1100-3B Transmissions in Support of the Improved System Enhancement Package RESET Program. Work will be performed in Indianapolis, IN and is expected to be completed by Dec. 31, 2008. This was a sole source contract initiated on Sept. 29, 2006 (DAAE07-01-C-N040).

Nov 27/06: GM subsidiary Allison Transmission in Indianapolis, IN received a $24.2 million modification to a firm-fixed-price contract for Zero-Timed X1100-3B Transmissions in Support of the System Enhancement Package Retrofit Program. Work will be performed in Indianapolis, IN and is expected to be complete by Dec. 31, 2008. This was a sole source contract initiated on Aug. 18, 2006 (DAAE07-01-C-N040).

Nov 27/06: GM subsidiary Allison Transmission in Indianapolis, IN received a $16.1 million modification to a firm-fixed-price contract for Upgraded X1100-3B Transmissions with Refurbished Containers in Support of the System Enhancement Package Program. Work will be performed in Indianapolis, IN and is expected to be complete by April 30, 2008. This was a sole source contract initiated on Jan. 25, 2006 (DAAE07-01-C-N040).

M1A2 Abrams

Aug 4/06: +60. General Dynamics Land Systems in Sterling Heights, MI received the full delivery order amount of $134.7 million as part of a firm-fixed-price contract for Abrams M1A2 SEP (system enhancement package) retrofits to 60 existing M1A2 Abrams tanks, along with total package fielding material for initial fielding. The M1A2 SEP is the latest, most technologically advanced Abrams variant, and the contract also includes a $145 million option to upgrade 60 more M1A2s, bringing the total to $280 million if all options are exercised.

Work on this SEP upgrade contract will be performed in Lima, OH (75%), Tallahassee, FL (10%), Anniston, AL (9%), Scranton, PA (3%), and Sterling Heights, MI (3%). Delivery of the first 60 vehicles is slated to begin in November 2007 and is expected to be complete by Nov. 30, 2008. Delivery of the 60 option vehicles would begin in November 2008. This was a sole source contract initiated on Feb. 1, 2006 by the Army Tank-Automotive and Armaments Command in Warren, MI (W56HZV-06-G-0006).

July 8/05: An estimated $7.3 million firm-fixed price contract for 90 commanders display units for the M1A2 Abrams System Enhanced Program (M1A2 SEP) Tank. The work is to be performed at the company’s Tallahassee, FL location and is to be completed Sept. 20, 2007. The Tank-automotive Armament Command in Rock Island, IL issued the contract (DAAE20-02-G-0009 delivery order 0109).

June 20/05: +???. A $141.1 million firm-fixed-price contract for M1A2 Abrams Upgrade Tanks to the System and Continuous Enhancement Program Configurations. Work will be performed in Lima, OH (75%), Imperial Valley, CA (1%), Tallahassee, FL (1%), Sterling Heights, MI (1%), Scranton, PA (3%), and Anniston, AL (9%), and is expected to be complete by Jan. 31, 2008. This was a sole source contract initiated on March 1, 2003 (DAAE07-01-G-N001). See GDLS press release, which places the number of tanks upgraded to M1A2 SEP at 60. It adds that vehicle deliveries to General Dynamics are scheduled for January through October 2007, with vehicle hand-off to the U.S. Army expected in January 2008.

April 29/05: An $8.2 million cost-plus-fixed-fee and cost-plus-incentive-fee contract for unique spares for the M1A2 SEP Abrams Tank, and Bradley Fighting Vehicles. Work will be performed in Killeen, TX (85%); Sterling Heights, MI (10%); and Southwest Asia (5%), and is expected to be complete by April 30, 2010. This was a sole source contract initiated on April 14, 2004 by US Army Tank-Automotive and Armaments Command in Rock Island, IL (W52H09-05-C-0089). See also GDLS press release.

FY 1996 – 2004

Sept 2/04: A $22.4 million firm-fixed-price contract for repair and modification to 111 M1A2 SEP Tanks. Work will be performed in Lima, OH and is expected to be complete by July 30, 2005. This was a sole source contract initiated on July 14, 2004 (DAAE07-01-G-N001). A subsequent GDLS press release clarified that this is a contract “to repair and modify 111 M1A2 Abrams System Enhancement Package (SEP) tanks that have recently returned from the war zone.” Work will be performed at the Joint Systems Manufacturing Center in Lima, Ohio, and is expected to be complete by July 30, 2005. The total value for this effort is actually about $70 million, allocated between TACOM ($40 million, to include major component repair by Anniston Army Depot), and GDLS ($29.9 Million).

May 6/04: +65. General Dynamics Land Systems announces a $121 million delivery order as part of a contract valued at $244 million, to retrofit 65 M1A2 Abrams tanks to the M1A2 SEP (System Enhancement Program) configuration. The tanks are being retrofitted to modernize the U.S. Army’s 3rd Armored Cavalry Regiment.

Work will be performed with the existing workforce at General Dynamics’ facilities in Lima, OH (74%); Tallahassee, FL (10%); Anniston, AL (9%); Scranton, PA (3%); Imperial Valley, CA. (1%); Muskegon, MI (1%); and Sterling Heights, MI (1%). Work will also be done at Fort Carson, CO (1%).

May 15/03: +14. A delivery order amount of $26 million, under a firm-fixed-price contract to retrofit 14 M1A2 Abrams Upgrade Tanks to the M1A2 SEP configuration. Work will be performed in Lima, OH (75%), Imperial Valley, CA (1%), Tallahassee, FL (10%), Sterling Heights, MI (1%), Scranton, PA (3%), Anniston, AL (9%), and Muskegon, IL (1%), and is expected to be completed by Dec. 31, 2004. This was a sole source contract initiated on April 29, 2002 (DAAE07-01-G-N001).

Nov 29/02: A delivery order amount of $5.8 million as part of an $8.8 million firm-fixed-price contract for 10 gigabyte solid state removable memory cartridges for retrofit into M1A2 Abrams SEP tanks. Work will be performed in Sterling Heights (0.2%) and Bloomington, MN (99.8%), and is to be complete by Aug. 31, 2003. This was a sole source contract initiated on Nov. 15, 2002 (DAAE07-01-G-N001).

May 16/02: A delivery order amount of $2.9 million as part of a $5.8 million (cumulative total) un-priced contractual action for 9 lines of spare parts in support of the M1A2 SEP Abrams Tank. Work will be performed in Lima, OH (10%); Imperial, CA (40%); Tallahassee, FL (40%), Anniston, AL (10%), and is to be complete by Oct. 30, 2003. This is a sole-source contract initiated on Feb. 14, 2002 by the U. S. Army Tank and Automotive Command in Rock Island, IL (DAAE20-97-G-0002).

Feb 9/01: +240. A $142 million modification to firm-fixed-price, multi-year contract DAAE07-95-C-0292. This procurement is an equitable adjustment to change-order modification P00110, that incorporated the System Enhancement Package (SEP) into 240 M1A2 Abrams Upgrade Tanks. This modification adds first article tests for the SEP into 240 tanks, adds material and testing for Under Armor Auxiliary Power Units that are to be retrofitted onto M1A2 Abrams Upgrade Tanks with the SEP.

Work will be performed in Lima, OH (80%); Scranton, PA (3%); Imperial Valley, CA (1%); Anniston, AL (4%); Tallahassee, FL (10%); Muskegon, MS (1%), and Sterling Heights, MI (1%), and is expected to be complete by Dec. 31, 2001. Of the total contract funds, $97.3 million will expire at the end of the current fiscal year. This is a sole source contract initiated on Jan. 18, 1995.

Jan 16/01: The Research Triangle Institute in Research Triangle Park, NC received a $6 million modification to a previously awarded firm-fixed-price contract N61339-95-C-0015, exercising an option for the production of one M1A2 Tank System Enhancement Package and one Multiple Launch Rocket System (MLRS) Maintenance Training System, Trainer Unique Modification Kit.

Work will be performed in Research Triangle Park, NC (60%) and Daytona, FL (40%); and is expected to be complete by September 2001. The Naval Air Warfare Center Training Systems Division in Orlando, FL issued the contract.

Feb 10/2000: The Research Triangle Institute in Research Triangle Park, NC received a $5 million modification to previously awarded contract N61339-95-C-0015 for the design, refurbishment, documentation, fabrication, integration, testing, manufacture, delivery and installation of the M1A2 system enhancement package maintenance training systems. Work will be performed in Research Triangle Park, NC (60%) and Daytona, FL (40%), and is expected to be complete by November 2000. Contract funds will not expire at the end of the current fiscal year. The Naval Air Warfare Center Training Systems Division in Orlando, FL issued the contract.

Dec 22/99: A $24.9 million modification to cost-plus-fixed-fee contract DAAE07-96-C-X195, to exercise the option for system technical support for the Abrams Tank Program, a system enhancement package M1A2 retrofit for the Abrams Tank. Work will be performed in Sterling Heights, MI and is expected to be complete by July 30, 2001. Contract funds will not expire at the end of the current fiscal year. This is a sole source contract initiated on May 2, 1996.

Nov 23/99: A $5 modification to cost-plus-fixed-fee contract DAAE07-96-C-X195, to exercise priced options for system technical support for the Abrams Tank Program, the M1A2 retrofit System Enhancement Package. Work will be performed in Sterling Heights, MI and is expected to be complete by Aug. 30, 2001. This is a sole source contract initiated on May 2, 1996.

May 4/98: A $9.1 million cost-plus-fixed-fee contract for various spares in support of fielding of the System Enhancement Package (SEP) of the M1A2 upgrade tank. Work will be performed in Tallahassee, FL (75%); Lima, OH (10%); Imperial Valley, CA (10%); and Scranton, OH (5%), and is expected to be complete by Dec. 31, 2000. This is a sole source contract initiated on Dec. 8, 1997 by the U.S. Army Tank-automotive & Armaments Command at Rock Island, IL (DAAE20-97-G-0002/0008).

Sept 26/97: A $7.3 million increment of a $24.3 million modification to a $127.3 million cost-plus-fixed-fee contract for research and development for the Abrams System Enhancement Package (ASEP) that will be incorporated into the M1A2 Abrams Tank. Work will be performed in Sterling Heights, MI and is expected to be complete by Feb. 28, 1999. Of the total contract funds, $14,757 will expire at the end of the current fiscal year. This is a sole source contract initiated on Nov. 23, 1994 (DAAE07-94-C-0727).

Aug 8/96: A $10 million modification to a cost plus fixed fee contract for two Heavy Assault Bridge Pre-Low Rate Initial Production Pilot/Test vehicles in Abrams M1A2 System Enhancement Package (SEP) configuration. Work will be performed in Sterling Heights, MI and is expected to be complete by February 28, 1998. This is a sole source contract initiated on May 29, 1996 (DAAE07-94-C-0727).

Additional Readings & Sources

Catégories: Defence`s Feeds

Canada’s New Fighter Jet Competition Will Consider F-35 | Pentagon Approves Sale of Early Warning Radar to Qatar | India Orders $490M in MBRL

mer, 14/12/2016 - 00:58
Americas

  • Justin Trudeau has said that the F-35 will be considered in an upcoming competition for new fighter jets. The Canadian PM previously backed out of the F-35 program due to costs, and Canada has now bought 18 Boeing F/A-18 Super Hornets as an interim measure. “It’s an open and transparent competition we’re going to be engaged in and the various aircraft and aircraft producers will have an opportunity to make their best case,” Trudeau told a news conference when asked whether Canada might be more likely to opt for the F-35 if the costs fell.

  • A USAF study has found that it will be soon possible for solid-state slab lasers to be demonstrated on an Air Force Special Operations AC-130 gunship. The study found that existing lasers will fit within the aircraft’s size, weight, power and budget limits, and would also be designed so the technology could be upgraded over the years as the service requires higher power levels. Although technologies must achieve a technology readiness level 6 to enter into a program of record, capabilities with a lower TRL are suitable for a near-term demonstration.

Middle East & North Africa

  • Israel has received their first two F-35 Joint Strike Fighters, making them the only Middle Eastern country to own a fifth-generation fighter. Greeting the arrival were Prime Minister Benjamin Netanyahu, the President of Israel Reuven (Ruvi) Rivlin, the Israeli Defense Minister Avigdor Lieberman and US Defense Secretary Ash Carter, currently on his last world tour as part of the Obama Administration. The USAF provided a KC-135 tanker to refuel the new planes.

  • US Defense Secretary Ash Carter announced that the Pentagon has agreed to sell a long-range early warning radar to Qatar. Carter said the radar will have a range of 5000 km and will enhance Qatar’s missile defense capabilities, therefore mitigating the threat from Iranian ballistic missiles. It was announced in July 2013 that Qatar had requested a Raytheon AN/FPS-132 Block 5 long-range early warning radar at an estimated cost of $1.1 billion.

Europe

  • The German Air Force has received their first upgraded A400M Atlas military transport aircraft. According to manufacturer Airbus, the tactical upgrades include improvements in airdrops, paratrooping, and self-defense. Berlin intends to replace their legacy fleet of C-130 airlifters with the updated planes, however delays to the plane’s delivery have resulted in friction between the government and Airbus. The government has also awarded Rheinmetall a $143 million contract to upgrade 90 Fox armored transport vehicles for the country’s armed forces.

  • French government officials have signed a deal with aerospace research office Onera to upgrade the ground-based “Graves” space-surveillance system. Worth some $42 million, the modernization contract will run for five years, with a further three years under option. The French air force operates the radar to locate and track satellites and objects in orbit at 400 to 1,000 km above the Earth, allowing the service to track foreign spy satellites gathering visual and signals intelligence on France. It also tracks space debris that could threaten French satellites.

Asia Pacific

  • Despite issues surrounding faulty ammo, the Indian government has ordered 36 homemade Pinaka Mark-1 multi-barrel rocket launchers (MBRL) at a cost of $490 million. Four different prime contractors will take part in the deal: state-owned organizations Bharat Earth Movers Limited (BEML) and Ordnance Factory Board (OFB), as well as private sector defense companies Larsen & Toubro (L&T) and Tata Power SED. Under the contract, BEML will supply a variety of vehicles for the MBRL, while L&T and Tata Power will supply the launcher systems and OFB will supply an unspecified number of rockets.

  • South Korea has taken delivery of 60 KEPD 350K missiles from Germany’s TAURUS Systems. The missiles were delivered to K2 air base in the city of Daegu. A certification process will now take place in order to assess the safety and reliability of installing the Taurus missiles on US-manufactured F-15K fighters. South Korea’s defense ministry has agreed to acquire a total of 170 Taurus missiles, and it plans to introduce the remaining 110 in two intervals in 2017.

Today’s Video

First F-35s land in Israel:

Catégories: Defence`s Feeds

Now a Twitter-Lashing for LM | Germany to Launch 2017 Competition to Replace Navy Helos | SK Conducts First Live Fire Exercises in Four Years

mar, 13/12/2016 - 00:58
Americas

  • Lockheed Martin is the latest defense firm to receive criticism from Donald Trump, after the US President-elect lashed out at the costs of the F-35 Joint Strike Fighter program. Taking to his usual medium to the masses, Twitter, Trump stated “the F-35 program and cost is out of control,” and “Billions of dollars can and will be saved on military (and other) purchases after January 20th.” Shares at Lockheed dropped 4 percent after Trump’s tweet, while shares of several other defense contractors also weakened. Trump also suggested that he was considering imposing a lifetime ban on US military procurement officials going to work for defense contractors, a move that could dramatically reshape the defense industry.

  • Raytheon has won a $101 million US Navy contract to repair 10 weapon replaceable assemblies for F/A-18 Hornet aircraft. Under the contract, the company will support and repair weapon assemblies for the fighters’ AN/ALR-67(V)3 advanced digital countermeasures. The devices are equipped to all variants of Hornet and Super Hornet aircraft serving under the US Navy, allows pilots to intercept faint signals, and improves situational awareness.

  • Brazil’s former president, Luiz Inacio Lula da Silva, has been charged by federal prosecutors with interfering in a government tender for fighter aircraft, in order to favor the Saab Gripen fighter. Lula, who was no longer in the presidency when the suspected illegal practices happened, was accused of having used his influence over the subsequent Workers Party government to help Saab win the 2013 F-X2 fighter competition for 36 jets worth around $5.6 billion. The Swedish fighter won out against competition from Boeing’s F-18 Super Hornet and Dassault’s Rafale.

Middle East & North Africa

  • Operators of the Airbus C295 will have the option of converting the aircraft into an airborne early warning and control (AEW) platform equipped with an Elta AESA radar. The announcement was made by Igo Licht, Elta’s vice-president of marketing and sales. Licht added that the conversion process is very cost effective and the medium transport could also be equipped with communications intelligence and signals intelligence sensors.

Europe

  • 2017 will see the German government launch a competition for the replacement of their navy’s fleet of 21 Westland Sea Lynx anti-submarine warfare (ASW) helicopters. A selection is expected to be made by the end of that year, however that is not allowing for any slippages. A likely contender is the NH90 Sea Lion, recently flown for the first time as the German Navy’s new asset for search and rescue and transport missions. Other offerings include the Sea Lynx’s successor, the AW159 Wildcat, and the Sikorsky S-70B Seahawk.

  • Officials at Raytheon have expressed confidence that the US government will grant export licenses for eight Patriot missile defense systems to Poland within the next few months. Speaking to Polish media, John Baird, vice president of Raytheon Poland programs said “concrete decisions are expected within the next few months.” Warsaw is also in talks to procure the Patriot’s rival, the Medium Extended Air Defense Systems (MEADS), with Lockheed Martin.

Asia Pacific

  • The South Korean military has conducted the first live-fire exercises of their Chunma mobile air defense missile system for the first time in four years. A self-propelled guided surface-to-air missile (SAM) system, Chunma can detect and track low-flying planes traveling at speeds of up to 300 kilometers per hour and 20 km away, and intercept them at an altitude of 5 km within 10 seconds. The early December exercise comes as Seoul prepares defense capabilities against a heightened threat from North Korea.

  • An anonymous US military official has spoken out on the current state of North Korean ballistic missile capabilities. Pyongyang is now able to put a nuclear warhead atop of a missile, however, the regime is not sure whether the warhead can survive re-entry into the earth’s atmosphere. The same official added that North Korea is working hard to overcome the problem, a reason for the ramp up in tests recently.

Today’s Video

Su-35 land at base near Finnish border:

Catégories: Defence`s Feeds

Canada Selects Airbus C-295 for Search & Rescue | Poland to Spend $14.5B For Mil Mod Campaign | UK Contracts BAE to Build 2 Add’l River Class Vessels

ven, 09/12/2016 - 00:58
Americas

  • Airbus has been selected as the winner of the Canadian government’s competition for new search and rescue aircraft. The C-295 won out against offerings from Leonardo’s C-27J and Embraer’s KC-390 by offering the best pricing for the Royal Canadian Air Force’s requirements. Under the $2.3 billion program, Airbus will collaborate with key Canadian firms, including PAL Aerospace on in-service support, Pratt & Whitney Canada for engines, CAE for training and simulation, and L3 Wescam for the electro-optic sensors.

  • Ukraine’s Antonov have offered their services to build Donald Trump a new Air Force One, if he intends to scrap the current order with Boeing. The offer came in the form of a tweet and has yet to be replied to by the US president-elect. One of the Soviet Union’s top aircraft producers, Antonov has produced only around twenty planes since Ukraine gained independence in 1991.

Middle East & North Africa

  • Lockheed Martin will provide spare parts for the Royal Saudi Air Force’s F-15 Strike Eagle fighters. The $67 million USAF contract covers parts for Infrared Search and Track systems, Sniper Advanced Targeting Pods, and LANTIRN Extended Range navigation pods. Lockheed Martin has been providing sensor systems for the kingdom’s Boeing-made fleet since 1996.

Europe

  • Poland has announced that they will spend $14.5 billion between 2017-2022, as part of a massive military modernization campaign. The priority procurements for the Polish Armed Forces are to include new air defense systems, 14 multi-purpose helicopters, 1200 UAVs, three coastal defense vessels and two mine destroyers, as well as an undisclosed amount of submarines that are to be jointly acquired by Poland and another NATO ally. Other areas where funding will be allocated include expanding air defense, naval, cybersecurity, tank and armored vehicle, and territorial defense capacities.

  • The Germany Navy is to purchase more capable air defence radar systems for three F-124 frigates, in an effort to become part of NATO’s broader missile defence system. Experts have said the new system will cost about 450 million euros and is likely to be built by France’s Thales, which built the radars in current use, and has been chosen by the Netherlands to supply new radars for their frigates. Meanwhile, German shipbuilder ThyssenKrupp has announced that ithey suffered a cyber-attack by southeast Asian hackers in February, making off with project data from ThyssenKrupp’s plant engineering division and from other areas yet to be determined.

  • BAE Systems has been contracted by the UK government to build two additional River-class Offshore Patrol Vessels for the Royal Navy. The $360 million deal adds two more manufacturing and support projects to the five-ship program, bringing the total contract value to $797 million. Work on the two vessels, named Tamar and Spey, will involve more than 100 companies from Britain. The designs build on existing River-class ships with variants already used by the navies of Brazil and Thailand.

Asia Pacific

  • Aging Cheetah and Chetak helicopter fleets operated by the Indian Army and Air Force will be ground for comprehensive safety checks by Hindustan Aeronautics Limited (HAL). The ruling came in the wake of a fatal crash in West Bengal in November that killed three soldiers. Both helicopters’ air-worthiness is being questioned as New Delhi waits to release funding for a $1 billion replacement program that will see the purchase of Russian Kamov-226T light utility helicopters. Previous attempts to replace the Cheetah and Chetak failed to make it over the line, amid corruption allegations and technical issues.

  • An agreement has been signed by the governments of Australia and France, allowing for the sharing of classified information on defense programs. In a joint-statement issued by both ministries, officials said that the treaty will “directly support the delivery of the Future Submarine Program and will further enable greater cooperation on a range of national security matters.” Australia picked French firm DCNS in April for exclusive negotiations for design and construction of the Future Submarine Program, worth AU$50 billion (US$37 billion) over 50 years.

Today’s Video

BAE Systems’ River-class Offshore Patrol Vessels:

Catégories: Defence`s Feeds

Rescue Required: Canada’s Search-And-Rescue Aircraft Program

ven, 09/12/2016 - 00:57

CC-115, BC coast
(click to view full)

The USA isn’t the only country whose SAR (search and rescue) aircraft programs are having a hard go of it lately. In 2004, Canada announced a program to replace its aging DHC-5 (CC-115) Buffalo (West Coast) and CC-130E/H Hercules (East Coast) search-and-rescue planes with at least 15 new aircraft. Some of the Canadian Forces’ CC-130s have already been grounded after flying 40,000 – 50,000 hours, and a contract has been signed for C-130J replacements.

The SAR project hasn’t been so lucky. The first SAR aircraft was supposed to be delivered in 2006, with all deliveries complete by 2009. Unfortunately, the Conservative Harper government temporarily shelved the project when it came to power, and subsequent efforts to restart it have featured one poor performance after another. The competitors have since expanded beyond the familiar duo of the Alenia C-27J Spartan with its speed advantage and C-130J compatibility, vs. the EADS-CASA C-295M with its longer fuselage and lower operating costs. Yet expanded options are no substitute for serving planes, and at least 1 victim has already died because the current fleet was unserviceable. What Canada’s SAR program really needs right now is transparency and urgency. Neither is currently in evidence.

Canada’s SAR Challenge

SAR missions, 1998-2001
(click to view full)

Canada is the 2nd-largest country in the world in terms of square area. Its 9,976 km3 exceeds both China (9,596 km3) and the USA (9,363 km3), and its 3 ocean borders to the east, west and north expand its required coverage into large and hostile environments. Each year, the JRCCs handle an average of 8,000 air and marine SAR cases, and Canadian Forces SAR aircraft conduct well over 1,000 missions per year. In 2008, for instance, Canadian Joint Rescue Coordination Centres (JRCC) handled 9,097 SAR cases across Canada.

JRCCs are staffed by a combination of coast Guard and Canadian Forces personnel, and are currently located in Halifax, NS; Trenton, ON; and Victoria BC. The SAR crews and aircraft are based in Gander, NL (EH-101 derivative CH-149 Cormorant helicopters); Greenwood, NS (CH-149 Cormorant helicopters and C-130E/H “CC-130” Hercules aircraft); Trenton, ON (Bell 412 derivative CH-146 Griffon helicopters and CC-130 Hercules aircraft); Winnipeg, MB (CC-130 Hercules aircraft); and Comox, BC (CH-149 Cormorant helicopters and DHC-5/ CC-115 Buffalo fixed-wing aircraft).

These are supplemented as required by Canadian Forces’ Griffon helicopters in Goose Bay, Labrador, NL; Bagotville, QC; and Cold Lake, AB; and by a small arctic fleet of DHC-6/ CC-138 Twin Otter aircraft based in Yellowknife, NWT.

The “Competitors”

Bath for a Buffalo
(click to view larger)

De Havilland’s DHC-5 Buffalo and DHC-4 Caribou aircraft were uniquely well designed for short-field operations in difficult conditions. The Buffalo program actually won an Us Army competition for a light STOL(Short Take-Off and Landing) airlifter, and its 1st flight was in 1961, but the production contract was never awarded because the USAF took over fixed wing operations and canceled it. Canada bought them, and so did a number of 3rd world countries who found its bush-plane design heritage appealing.

Buffalo production stopped in 1986, however, which is creating an issue with spare parts. Plans are currently in place to keep Canada’s 6 remaining Buffalos in the air until 2015, as their slow speed makes them ideal for searching the west coast’s difficult mountain ranges. At present rates, Canada may not even have a flying replacement by then.

Under the 2004 program, there were 2 competitors. That may expand to 5 or even 6 competitors once Canada releases its new RFP, but only if that RFP is a real competition.

C-27J Spartan
(click to view larger)

C-27J. One sure competitor is Alenia’s C-27J Spartan, which won the US Army’s Joint Cargo Aircraft light transport competition. This is ironic, because the Buffalo arose out of a similar US Army contract. In time, the USAF’s emphasis on larger aircraft instead, and their mismatch with front line needs, would spawn the competitions that culminated in the USA’s Joint Cargo Aircraft. The C-27J’s win gave it a toehold in North America – until the role was given to the US Air Force again, and they killed the JCA just as they did the Buffalo.

The C-27J “Baby Herc” has a wider cabin with a strengthened floor that can accommodate vehicles and heavier loads; offers a 325 knot cruising speed; would offer commonalities with the US Army during continental emergencies; and offers long-term cost savings via engine and other commonalities with Canada’s new C-130J Hercules. The US fleet of 21 C-27Js needs to find a home, but Alenia has said point-blank that it will not support that fleet if it’s sold abroad. If Canada wants this plane, it will have to buy new.

Media reports indicate that the C-27J may be the government’s choice under an ACAN bid, which essentially picks the desired aircraft and then invites other competitors to make an offer. To date, ACAN experience is that the requirements are explicitly written to exclude many competitive choices. There is also no appeal process comparable to the US GAO, which can hold the government to fair application of set criteria and review procurement decisions. As such, ACAN bids by other manufacturers are generally a waste of time.

C-295, Alaskan mountains
(click to view full)

C295. EADS-CASA’s C-295M, is a stretched version of the smaller CN-235. The CN-235MP variant is a popular maritime search and patrol aircraft, and a modified version serves the US Coast Guard as the HC-144A “Ocean Sentry” surveillance aircraft. The larger C-295M offers substantial long-term savings by costing less to fly and maintain than the C-27J; may offer interesting cross-over possibilities by leveraging the HC-144A’s “mission pallet” approach. It has a longer cabin that can carry more pallets of cargo or medical litters, or offer more crew room, reportedly offers better range, and has a cruising time of 12 hours. Built-in air-to-air refueling capability can extend even that mission time, to the limit of the crew’s endurance.

That last set of performance statistics may prove especially appealing, given Canada’s vast distances. The tradeoff is a slow cruise speed of just 260 KTAS, which also has implications for long-range rescue attempts. On the other hand, EADS-CASA says that Portugal picked the C-295 because it outperformed its competitor in precisely the kind of long-term low-speed, low-level handling that’s required for mountain search operations on Canada’s west coast.

C-130J Hercules
(click to view full)

C-130J family. Lockheed Martin attempted to submit a 3rd aircraft in the USA’s JCA competition, but their bid was denied. That plane was a compact version of the C-130J Hercules. Now that Canada has confirmed itself as a C-130J customer, Lockheed Martin may seek to take advantage of the industrial offset partnerships it is already creating in order to meet the “Canada First” 100% industrial offset rule, and offer Canada a C-130J-SAR. One outside suggestion would have them offer their HC-130J Commando II, for use in a dual SAR/ Special Forces role.

Advantages in this SAR role would include size, speed, range and cruising time, C-130 class transport capabilities in an emergency, and full commonality with Canada’s new C-130J fleet. Its 4 engines create a tradeoff, however, as fuel economy and hence operating costs would suffer.

CoastWatch Q200
(click to view full)

The 4th and 5th potential competitors are Canadian entries.

Q400. Bombardier’s Q-series/ Dash 8 has been modified for use as a maritime patrol and search aircraft, and serves with similar organizations like Australia’s CoastWatch. The aircraft’s lack of a rear ramp is probably its biggest obstacle to its acceptance in a full search and rescue role.

DHC-5NG? The Buffalo itself is the 5th option. Viking Air Ltd. now holds the type certificates for most of DeHavilland’s aircraft, including the DHC-5 Buffalo. The firm has recently enjoyed success with its revival of the legendary DHC-6 Twin Otter, and has offered to upgrade the existing CC-115 fleet, while producing new aircraft for the SAR program at its manufacturing facilities in Calgary and Victoria. The Buffalo’s old GE CT64-410-3 engines would be replaced by Pratt & Whitney Canada’s PW150 used in Bombardier’s Dash 8s and many other regional aircraft, and the planes would receive digital avionics suites and FLIR systems derived from the Series 400 Twin Otter.

The Buffalo has excellent short takeoff capabilities, and excels at slow-speed, all-weather flying, which is why it performs SAR on Canada’s mountainous west coast. The Viking proposal would offer Canada the largest industrial benefit, with nearly 100% Canadian content for the buy, and additional potential for exports. With Viking’s modifications, the DHC-5NG’s top speed is projected to improve from 235 knots to 300 KTAS, with a carrying capacity and profile that’s comparable to the slower C-295M. The DHC-5NG’s risks include development risks, and the risk of an aircraft type that could wind up being unique to Canada, with all of the attendant support and upgrade burdens.

MV-22 Osprey
(click to view full)

CV-22. The 6th option is quite recent, and surfaced with October 2011 reports that Bell Helicopter and Boeing were demonstrating their tilt-rotor V-22 Osprey in Canada.

Its notional advantage over current contenders is the V-22’s ability to do more than perform identification and supply drops. Unlike other competitors, an MV-22 or CV-22 derivative can pick up rescuees immediately, removing the risks and expense involved in sending additional helicopters or ground forces. All it needs is a landing spot or winching position. The flip side is its status as the most expensive option to buy and most expensive to operate, coupled with a readiness rate that remains below expectations. Canada’s poor experience with the readiness of its AW101/CH-149 Cormorant SAR helicopters may create especial caution around that last point.

Contracts and Key Events 2016

December 9/16: Airbus has been selected as the winner of the Canadian government’s competition for new search and rescue aircraft. The C-295 won out against offerings from Leonardo’s C-27J and Embraer’s KC-390 by offering the best pricing for the Royal Canadian Air Force’s requirements. Under the $2.3 billion program, Airbus will collaborate with key Canadian firms, including PAL Aerospace on in-service support, Pratt & Whitney Canada for engines, CAE for training and simulation, and L3 Wescam for the electro-optic sensors.

January 20/16: Canada’s hunt for a new fleet of search and rescue aircraft will not consider Lockheed’s C-130J. Proposals for the procurement were due mid-January and do include the Airbus C-295, Alenia’s C-27J Spartan and Embraer’s latest offering, the KC-390. Part of the competition involved the potential providers suggesting how many of their aircraft would be required by the Royal Canadian Air Force to conduct their operations, rather than a specified number being supplied by the government. Lockheed Martin’s lack of participation in the competition is said to have been in reaction to the saga revolving around Canada’s recent backing out of the F-35 program to launch a new procurement competition.

2015

December 15/15: Canada’s search-and-rescue procurement program has a new contender as Brazilian firm Embraer is to offer a bid for their KC-390. Embraer will likely face competition from Airbus’s C-295, and Alenia’s C-275 when bids are officially submitted in January. While Airbus and Alenia have been courting the Canadian government for a number of years, the KC-390 is said to have an advantage in terms of speed and range, although it is not expected to enter into service until 2018. Canada’s procurement competition will see companies submit bids based on how many they think will be needed to fulfill the country’s search-and-rescue needs as opposed to being given a fixed figure for tender.

Feb 13/15:The long, long, long delayed RFP for Canada’s new fixed-wing SAR capability is said to be coming shortly. By now, only three players are still waiting for it.

2014

May 30/14: One day, Canada might even have an RFP for an FWSAR program touted as a “top priority” back in 2008. The Canadian Press discovers that Canada did give serious consideration to buying the USA’s Joint Combat Aircraft fleet of 21 C-27Js, but it fell through. The RCAF’s Feb 12/12 presentation described it as “a unique, time-sensitive investment opportunity,” albeit one that would spark a political backlash from Canadian firms that wouldn’t get their cut. CP writes that:

“The air force’s proposal would have effectively blown up years of careful bridge rebuilding between Public Works and the aerospace industry, which complained loudly that the original specifications were wired to favour the…. C-27J…. protests were so deafening that MacKay ordered the National Research Council to examine the plan. It agreed the military’s specifications were far too specific and needed to be broadened in order to ensure competition.”

By the time that NRC examination would have been underway, it would have been abundantly clear that Alenia and the Italian government were prepared to use extreme measures. The Feb 27/12 statement from their CEO said that the manufacturer and Italian government would work hard to deny any support to any resale customer outside the US government, effectively making a Canadian purchase impossible. The USAF C-27J fleet now resides with SOCOM and the US Coast Guard. Sources: CP, via Vancouver Sun, “Fixed-wing search plane program almost short-circuited by RCAF proposal”.

May 29/14: Team Airbus. Airbus Military signs a memorandum of understanding (MOU) with Provincial Aerospace Ltd. in Newfoundland to provide in-service support for their C295, if it wins the FWSAR competition. Sources: Canadian Manufacturing, “N.L. firm joins Airbus on Canadian Forces search and rescue fleet bid”.

May 27/14: Team Spartan. Finmeccanica-Alenia Aermacchi picks Esterline CMC Electronics (CMC) in Montreal, PQ to provide the flight management system (FMS) for its worldwide C-27J Spartan fleet, and for Team Spartan’s FWSAR offering. CMC is already tapped to supply their its TacView Portable Mission Display and SureSight Enhanced Vision System sensor for Team Spartan in Canada. Sources: Ottawa Citizen Defence Watch, “Esterline CMC Electronics of Montreal Selected To Provide Flight Management System For Worldwide C-27J Spartan Fleet”.

2013

CC-130 over BC
(click to view full)

Dec 26/13: USCG. The 2014 National Defense Authorization Act is signed into law, locking in the transfer of the USAF’s 14 remaining C-27Js to the Coast Guard. Initial flight operations are scheduled to begin within 6-12 months, but a Jan 6/14 Alenia North America release shows that there’s more expense to come:

“The company also anticipates the USCG will immediately begin the process for expanding the C-27J’s capabilities with tailored mission kits to include surface-search radars, electro-optical sensors and mission suites installed on all 14 planes.”

Creation of these new kits will be good news for Alenia’s chances in Canada, which already seems to tilt toward the C-27J. Alenia improves their odds of winning by having the USCG use their solution as a lead customer, giving them parity with the fully integrated C295 MPA. It’s also better to have the USCG pay to integrate all of the required equipment, instead of adding that cost to a Canadian bid. Sources: Govtrack, “H.R. 1960: National Defense Authorization Act for Fiscal Year 2014” | Alenia NA, “14 Alenia Aermacchi C-27Js transferred to U.S. Coast Guard”.

Aug 30/13: Canada’s Minister of Public Works and Government Services announces that after 2 years worth of Letters of Interest, Canada’s bureaucracy has produced… a draft RFP. Not a real RFP, which won’t arrive at the government’s BuyAndSell.ca site until 2014. A draft RFP “for final comments.”

The name of the ministry making the announcement is a clue regarding why this might be so. Canadian government.

June 17/13: Defence minister MacKay offers some thoughts on Canada’s SAR competition to
Aviation Week. It looks like Viking will have a very hard time pushing its modernized Buffalo. The required recertification of their upgraded aircraft comes with a time-to-service delay that could be a killer.

He also points to the Buffalo NG’s status as a developmental aircraft, though experience with Canada’s CH-147Fs and CH-148/S-92 helicopters shows that Canada is perfectly capable of turning an off-the-shelf buy into a developmental project. Aviation Week | CDFAI.

April 30/13: Report. The Auditor General of Canada’s 2013 Spring Report includes a section covering Canadian Search and Rescue. The bottom line is stark, but what’s DND doing? Still “reviewing its options.” Translation: nothing of substance. OAG:

“National Defence has not sufficiently replaced and has had difficulty maintaining its SAR aircraft at the level necessary to respond to SAR incidents effectively.”

Canada’s 11 CC-130E/H Hercules are based across Canada at Comox, BC (west), Winnipeg, MN (central), Trenton, ON (central), and Greenwood, NS (east). They lack modern SAR sensors and equipment, and are all over 20 years old. Maintenance is time-consuming and expensive, and 2 planes have received new wings to keep them flying. The Hercules planes are also needed for transport operations, so they aren’t always available.

The CC-115 Buffalos on the west coast cost $20 million per year to maintain, and will need new engines if they’re flown past 2015. In 2011, Buffalo airplanes were unavailable for SAR on 119 occasions, and in 5 of these cases there were no SAR replacement airplanes.

The CH-149 Cormorant/ AW101 helicopters have been spread more evenly across Canada, with 5 in B.C. on the west coast, 4 in Nova Scotia on the east coast, and 3 in Newfoundland to cover the northeast seas. Buying the USA’s failed Presidential helicopters has helped with spares, but “corrosion from salt water is increasing maintenance needs, with at least two helicopters always in maintenance…”

The 5 CH146 Griffon/ Bell 412 helicopters assigned to SAR duties lack range and payload. They’ve been relocated to Trenton, ON in a secondary role. OAG release | OAG Report, Chapter 7 | CDFAI.

March 19/13: The National Post runs an article covering DND’s SAR competition decisions, by former NDP (socialist party) candidate Michael Byers, and left-wing Rideau Institute research fellow Stewart Webb (q.v. also June 19/12 entry). Their failure to mention Public Works Canada’s role in defense procurement is odd, but their other factual assertions are pretty straightforward.

Byers and Webb allege that DND passed up an 2007 opportunity to buy Brazil’s retired fleet of Buffalo aircraft as a source of spare parts, and also dismissed an internal proposal to buy spare parts from Viking Air, which owns the rights to the design. A proposal to re-engine the Buffalos to allow service until 2015 was also reportedly rejected.

Their most damning allegation, if true, is that DND still hasn’t re-written their FWSAR specifications, over 3 years after the competition was derailed because the specification had been written to allow only 1 contender. We say “if true” because DND’s Aug 16/11 statement specifically said that the Statement of Requirements had been re-written. National Post.

2010 – 2012

Maneuvering and teaming by industry, disinterest and slipshod work by government; An alternative FWSAR proposal.

HC-130J
(click to view full)

End 2012: FWSAR+. US Army Lt. Col. (ret.) Jim Dorschner offers an alternative FWSAR framework, in DND’s Canadian Military Journal. FWSAR Plus: A Way Forward proposes that Canada buying 10 Bombardier Q200s in the same SAR configurations bought by foreign militaries, plus 10 dual-role HC-130Js to fulfill SAR and Special Forces roles. The Q200/ Dash-8s would be based on both coasts at CFB Comox, BC and CFB Greewood, NS. The HC-130Js would be based in central Canada at CFB Winnipeg, MB and at Canada’s main C-130 base: CFB Trenton, ON. All existing C-130H transports and transport/tankers would be retired, leaving only C-130Js in the fleet.

The result would be a unified fleet of 27 C-130Js to serve in transport, tanker, SAR, and special forces roles, plus 10 lower-cost Q200s with conformal tanks to extend range. It’s an interesting proposal, and its venue ensures that it will be noticed.

Nov 27/12: Mixed signals. Defence minister Peter MacKay confirms to the Commons Defence Committee: “We’ve broadened the specs to include the possibility of a mixed fleet…” This confirms reports from Oct 16/12.

The public works ministry has given airplane manufacturers until Dec. 21 to express interest. Sun Media.

Nov 15/12: Embraer’s KC-390? The Ottawa Citizen’s David Pugliese writes:

“The recent industry day on the Canadian Forces fixed wing search and rescue (FWSAR) project brought a new player into the mix. Brazilian aircraft manufacturer Embaer was invited to attend.”

The KC-390 is a twin-engine jet transport in the same performance class as the C-130J Hercules, and Embraer has built it into a trans-Atlantic, multinational project. Its faster cruising speed would give it advantages in a SAR/special forces role, and Embraer might be tempted to offer Canada a deal, in order to secure a high-end market endorsement. The bad news for Embraer is that they’re seen as a major competitor by Canadian aerospace firms, and especially by Bombardier. FWSAR’s rear ramp requirement caused Bombardier to bow out of the recent Industry Day. The political optics of shutting out Quebec’s flagship firm Bombardier, while giving the contract to their biggest competitor, make a KC-390 victory almost impossible to imagine.

Oct 16/12: Dual buy? The Canadian government is reportedly thinking of buying 2 different FWSAR platforms. That could open a West Coast niche for Canada’s Viking Air and its Buffalo NG. It could also open the door to a limited V-22 buy, if Canada wants to have those capabilities without compromising its entire fleet. Ottawa Citizen | Victoria Times-Colonist.

Oct 10/12: Team Airbus. Discovery Air in Yellowknife, Northwest Territories signs a Memorandum of Understanding (MoU) to become Airbus Military’s primary Canadian partner, and provide training and in-service support if the C295 is picked for the FWSAR program. An Arctic partner is one way to strengthen their bids credential’s, and the partners hope their duties will include setting up a search and rescue base in Yellowknife, instead of dispatching planes from places like Winnipeg, many flying hours south. N.W.T. Premier Bob McLeod adds his support for their bid:

“The Northwest Territories is many hours from the nearest dedicated search and rescue facility. Whenever I say that to people, they are surprised. They know how harsh our climate is. In any search and rescue operation, every minute counts. This is particularly true in our northern winters. Northerners are Canadians, too. We should not be penalized for where we live.”

See: CBC News | CDFAI | Discovery Air.

Sept 14/12: LoI. Letter of Interest (amendment 004) issued to publish FWSAR Essential Elements V2.0. Source.

LoI issued

Sept 3/12: Air Force only. The Ottawa Citizen reports that the government will not consider public-private partnerships for its SAR requirements, along the lines of programs in Australia and Britain. A July 2011 statement had appeared to open that option, but:

“…industry sources say that the option of allowing firms to provide aircraft and crews on a contract basis to the Canadian Forces never really stood a chance. The RCAF was not keen on the option as they see SAR as a high-profile role they want to continue providing in all aspects.”

June 19/12: Rideau Report. The left-wing Rideau Institute releases a report: “Search and Replace: The Case for a Made-in-Canada Fixed-Wing Search and Rescue Fleet” advises the government to choose a mixed fleet of SAR aircraft, using an open competition, with a clear Statement of Operational Requirements (SOR) that permits Canadian bidders.

The only Canadian options would be Viking’s Buffalo NG and Bombardier’s Q400/ Dash 8. Co-incidentally, a separate article by the authors of that report recommends picking only those 2 planes. The Q400s would be used on the East Coast and in the arctic, but modified with side door deflectors for parajumps, and underbelly “drop hatches” for life rafts and other equipment. The Ottawa Citizen points out that the Q400 may have another issue, beyond its lack of a rear ramp:

“Defence Watch has visited the Bombardier [CANSEC defense trade show] booth a number of times over the years to ask about the Q400 or other Bombardier products for FWSAR, only to be met with blank looks and the suggestion that some information might be available from corporate HQ… maybe.”

The Canadian Defence & Foreign Affairs institute also chimes in and asks, reasonably, why would one bother recommending a competition when one’s mind is already made up? CDFAI also cites, and sources, the Canadian Forces’ unstated requirement that the planes should double as tactical transport aircraft. Within Canada’s closed and opaque procurement process, the fact that a requirement is unstated is no barrier to having it determine the winner. Rideau Institute release | full report || BC’s The Tyee | CDFAI | Ottawa Citizen.

May 30/12: Team Lockheed. Lockheed Martin and Cascade Aerospace Inc. announce a partnership at the CANSEC 2012 trade show. Their Memorandum of Understanding (MOU) includes offering the C-130J for Canada’s FWSAR, “as well as other programs and projects relating to Lockheed’s C-130J Super Hercules aircraft.” The obvious selling points of that bid will be range, commonality, and an established industrial offsets program. The obvious pitfall is cost.

In 2010, Lockheed Martin awarded a 20 year contract to Cascade for maintenance services to support Canada’s 17 new CC-130Js, the last of which arrived on May 8/12. Cascade also provides fleet management services directly to the RCAF for their older CC-130E/H fleet, and is 1 of just 2 Lockheed Martin-authorized C-130 Service Centers in the western hemisphere. Cascade Aerospace.

May 29/12: Team Alenia. Alenia Aermacchi announces its C-27J FWSAR team. General Dynamics Canada will offer performance-based aircraft support, and Provincial Aerospace will handle the SAR conversions. Fellow Finmeccanica subsidiary DRS Canada’s role is not made clear. The release professes faith that a draft RFP will materialize in the fall of 2012, and that a winner will be picked in 2014. Alenia [PDF]

May 8/12: DND’s Report on Plans and Priorities 2012-2013’s “Supplementary Tables: Status Report on Transformational and Major Crown Projects” include FWSAR. It says that the Treasury Board approved a budget in March 2012, but approval isn’t due until the fall of 2013, and even if this contract actually keeps its schedule, no order will be placed until spring 2014. The 1st new aircraft isn’t expected until 2017, and it will be 2018 before the new planes can really take over.

Other sources report that the approved expenditure authority was C$ 3.8 billion. Treasury Board DND “Status Report on Transformational and Major Crown Projects” | left-wing Rideau Institute.

March 23/12: Public Works Canada announces yet another Industry Day workshop for Canada’s FWSAR, on April 11/12. They are “now ready to resume industry engagement on FWSAR”, after taking since Aug 16/11 to move things forward again. Companies are “invited to provide comments and questions,” but failure to attend the workshops won’t exclude any suppliers from bidding later on.

Note that this competition was supposedly re-started in 2009. PWGSC | MERX Solicitation.

Feb 27/12: Better buy new. Alenia Aermacchi CEO Giuseppi Giordo gives an interview at Singapore’s air show, which throws a major wrench in American plans to re-sell the C-27J fleet. The contract itself reportedly has clauses that given Alenia discretion over resales, and if the USAF doesn’t reassign or store the Spartans,

“…we will do our best – not only us, but the Italian government – not to support those planes. They can sell, but as the original equipment manufacturer, I will not give spares, not guarantee configuration control, and so on…”

See full coverage in “The USA’s C-27J Joint Cargo Aircraft“.

Jan 26/12: Buy used? Preliminary FY 2013 budget materials discuss coming shifts in Pentagon priorities, as the US defense department moves to make future cuts. The USAF’s 38-plane C-27 fleet will now be eliminated entirely, and sold:

“The new strategic guidance emphasizes flexibility and adaptability. The C-­27J was developed and procured to provide a niche capability to directly support Army urgent needs in difficult environments such as Afghanistan where we thought the C-130 might not be able to operate effectively. However, in practice, we did not experience the anticipated airfield constraints for C-­130 operations in Afghanistan and expect these constraints to be marginal in future scenarios. Since we have ample inventory of C-130s and the current cost to own and operate them is lower, we no longer need – nor can we afford – a niche capability like the C-­?27J aircraft. The Air Force and the Army will establish joint doctrine relating to direct support.”

This could be an opportunity for Canada, if DND can act with uncharacteristic haste. Australia has an approved request for 10 new C-27Js, and could decide to step in. Other C-27J operators looking to expand their fleet may also see an opportunity. Pentagon release | “Defense Budget Priorities and Choices” [PDF]

Jan 5/12: The Ottawa Citizen reports that the Cabinet of government ministers has signed off on the FWSAR project. DND spokeswoman Tracy Poirier adds:

“The $1.55-billion FWSAR project will acquire a new off-the-shelf fleet of fixed wing aircraft to replace the existing fleet of six CC115 Buffalo and ten CC130 Hercules SAR aircraft by 2015. A project objective is to provide an equivalent level of SAR service to Canadians while reducing costs associated with supporting the fleets.”

Oct 1/11: V-22. Reports surface that Bell Helicopter and Boeing have demonstrated their V-22 to the Canadian Forces, as a possible solution to that country’s long-running on-again, off-again domestic search and rescue aircraft competition.

The competition is currently off-again, so there’s no live RFP, and no commitment yet by Boeing to bid. AIN Online | Ottawa Citizen Defence Watch.

Aug 16/11: Canada’s DND finally addresses the FWSAR project:

“Based on the NRC review, the SOR(Statement Of Requirements) has been amended to allow for a wider range of Fixed Wing Search and Rescue solutions and to reflect a capability-based rationale.”

Jan 25/10: Defense News reports that a recommendation for Canada’s FWSAR program is expected to be put before the government by May 2010 for approval. In addition, the government has asked the National Research Council in Ottawa, to examine the military’s search-and-rescue needs and how such capabilities could be improved. That review is due March 5/10.

Even so, Defense News reports that some of their sources believe that even when FWSAR recommendations are made, the Canadian government will not move on it. Relief from incoming C-130Js, and statements that the Buffalo fleet could last until 2015, are likely to remove any sense of urgency. Barring some sort of systemic SAR failure that costs lives, of course.

2007 – 2009

Incoming government delays FWSAR in 2007, re-launches in 2009.<

CC-115 Buffalo
(click to view full)

July 15/09: Re-launch. Canada’s DND formally re-launches the Fixed Wing Search and Rescue Program. It is very vague on specifics, and mostly discusses Canada’s required Industrial/Regional Benefits policies. According to an Ottawa Citizen report, the 140 or so people who showed up for the Industry Day launch were generally unimpressed:

“Government representatives who called the meeting couldn’t answer questions on how many planes would be bought, when they would be purchased, whether they would be equipped with sensors or how they would be maintained… About 140 people were jammed into a room in a military hangar, with some having to stand in a nearby hallway. The audio-visual presentation that was to outline details of the program did not work and the microphones for the main speakers and audience members failed.

At the last minute, the Harper government shut down an invitation for the media to listen to the presentations, leading to a bizarre situation where government employees refused even to confirm they were government employees.”

Sources: DND Backgrounder | Ottawa Citizen | Halifax Chronicle Herald | Aviation Week | David Pugliese’s Defence Watch.

Re-start

July 9/09: Ottawa Citizen reporter David Pugliese notes that the July 14/09 Industry Day for the C$ 3 billion FWSAR project is scheduled to be only 90 minutes long, and wonders if the fix is still in:

“…only setting aside 90 minutes for his presentation and to deal with all the questions from industry that might be associated with a $3 billion project has some cynics in the defence industry world suggesting not much has changed on this project. They expect the same details from four years ago to be trotted out and polished up as something new, with the usual “fair and open competition” buzz words to be thrown in for good measure.

But again, they are very cynical about this project.

It also doesn’t look from the details the government has posted that Industry Canada and Public Works officials will be taking part in this industry day.”

Jan 20/09: The Ottawa Citizen’s David Pugliese reports that political considerations are spawning proposals for a different procurement strategy as the purchase recommendation is prepared for Cabinet – but not for a different outcome:

“Nothing would change, I’m told. The C-27J would be selected but there would be the appearance of a competition. The way the requirements are now set, the Airbus Military (CASA-EADS) C-295 would be automatically excluded. Same goes for Canadian company Viking and its proposal for new build Buffalos. One way a competition could be held, however, is if Lockheed Martin were to bid the C-130J for FWSAR… [but] C-130J would be disqualified because the FWSAR budget would not allow for the purchase of enough of the aircraft.”

Dec 23/08: Buffalo. Viking Air CEO David Curtis issues an open letter, offering to refurbish existing Buffalo aircraft and re-start production in order to fill the government’s SAR needs. An excerpt from the letter’s reproduction on the CASR site:

“The requirement to replace the present [SAR] fleet is not based on a lack of ability for the Buffalo to do the job, but simply due to the aging of the aircraft. By breathing new life into the program, the DND can continue to operate the best-suited aircraft, safely, reliably, and with a huge reduction in acquisition and direct operating costs [including aircrew / maintenance personnel training, airframe spares, etc.]… Canadian taxpayers will receive a proven, low-risk product with huge economic benefits and cost savings, thus allowing the DND to either acquire more aircraft for search and rescue or reallocate the funds to other projects within DND.”

See also: “DHC-5NG – a New-Production Buffalo Compared with C-27J.”

Dec 18/08: C-27J sole-source? Reports begin to surface that the Canadian DND plans to issue an Advance Contract Award Notice (ACAN) for the SAR requirement, specifying Alenia’s C-27J as its preferred type. Martin Sefzig, Airbus’s director of Canadian programs, is surprised when the Ottawa Citizen asks him about it:

“We’re caught off guard by the current initiative calling for an ACAN… After five years of no evaluation and very little discussion, they now go for an ACAN. No aircraft has been tested. Why?”

The move would have to survive Cabinet scrutiny, and the unstable state of Canada’s Parliament makes that far less likely. Handing out a manufacturing contract that creates jobs in Italy, while shutting out Canadian competitors and creating controversies in Quebec, Alberta, and British Columbia, isn’t a winning move if one’s political margins are as thin as the current Harper government’s. Time will tell. See also: Canada.com | Halifax Chronicle-Herald op-ed | The Torch | Flight International.

Dec 13/08: Canada’s Defence Minister Peter MacKay is quoted as saying that a proposal to replace the CC-115 Buffalos is on his desk, and ready to be presented to the federal cabinet in early 2009. He will ask the Cabinet to approve up to $3 billion for the project, and says “I hope to move very early in the new year toward procurement.”

The purchase of 15 new aircraft is now expected to cost around C$ 1.5 billion, with an additional C$ 1.5 billion tacked on for a 20-year service contract. Toronto Star.

June 4/07: Delay. Aero News reports that the Canadian SAR competition has now been pushed forward 4 years, and quotes Canadian Air Force spokesman Capt. Jim Hutcheson as saying that there isn’t even a projected delivery date any more.

“It is acknowledged that there are other government priorities, other departmental priorities that are being pursued right now, largely associated with operations in Afghanistan… We’ll most likely use the Buffalo and the Herc beyond 2010 until the new aircraft arrive… How much beyond, they’re looking at options that will cover that range.”

Giuseppe Giordo, President of Alenia North America in Washington, DC, notes that negotiations are ongoing and the first CC-130Js aren’t expected until 2009 at the earliest. He contends that the funds could be used now to finance SAR recapitalization.

Canada’s Conservative Party is a minority government, which means it can be brought down at any time via a vote of no-confidence by the other political parties. The deferral of this purchase is likely to prove contentious in many regions of Canada, which is the world’s second largest country and has large remote areas that are thinly-populated but important to its economy.

Stay tuned.

FWSAR delayed 4 years

Jan 3/07: Sole-source? Canada’ Globe and Mail newspaper reports that:

“A DND document obtained by The Globe and Mail confirmed that only one aircraft is being considered as a “viable bidder” for the search-and-rescue contract. The project is worth about $3-billion, including the maintenance of the aircraft over 20 years… Defence contracts are among the most lucrative deals the government signs, and if the Spartan is bought, it will illustrate a growing government habit of signing multibillion-dollar deals without accepting competing bids.”

Additional Readings Main Documents

Contenders

Other News & Coverage

Catégories: Defence`s Feeds

UK OPVs: Bridge Over the River Class

ven, 09/12/2016 - 00:50

River Class
(click to view full)

The UK’s forthcoming Ocean Class 90m+ Offshore Patrol Vessels stem from a shipbuilding sector agreement that the UK MoD signed with BAE in November 2013. Britain needed to find an affordable bridge-buy that kept its naval shipyards running in-between completion of existing ships, and delayed construction of the new Type 26 frigates. Rather than paying termination and industrial costs to keep the shipyard idle, the UK government decided to buy 3 OPVs, for delivery by 2017. This would also allow the Royal Navy to retire or gift out the existing River Class OPVs HMS Tyne, HMS Severn and HMS Mersey.

As of August 2014, the contract for these new open-ocean patrol vessels is complete…

Batch 2 OPVs

The new British OPVs will be built at BAE Systems’ facilities in Glasgow, under a GBP 348 million contract announced on Aug 12/14. That brings the total to GBP 368 million, following a GBP 20 million long-lead parts contract announced on March 12/14.

The design based on vessels already sold abroad: Thailand’s HTMS Krabi, and the 3 similar Amazonas Class OPVs that Brazil picked up when Trinidad and Tobago cancelled their deal.

The new ships will be larger and more efficient than Britain’s existing River Class OPVs, with more room for embarked personnel, more storage space, and the addition of a flight deck capable of landing the Royal Navy’s AW101 Merlin medium-heavy helicopters. The Ocean Class are designed for a maximum speed of 24 knots, and a range of 5,500 nautical miles. Sources: UK MoD, “£348 million warship contract delivers Clyde jobs boost” | BAE, “New contract award for Royal Navy Offshore Patrol Vessels” | UK MoD, “£20 million contract for new Royal Navy ships” (March 2014) | UK MoD, “New offshore patrol vessels for Royal Navy” (Nov. 2013).

Update

December 9/16: BAE Systems has been contracted by the UK government to build two additional River-class Offshore Patrol Vessels for the Royal Navy. The $360 million deal adds two more manufacturing and support projects to the five-ship program, bringing the total contract value to $797 million. Work on the two vessels, named Tamar and Spey, will involve more than 100 companies from Britain. The designs build on existing River-class ships with variants already used by the navies of Brazil and Thailand.

Catégories: Defence`s Feeds

Boeing Blusters Over Tweet | US State Dept Clears $668M Stryker Sale to Peru | $619B Defense Bill May Send MANPADS to Syria

jeu, 08/12/2016 - 00:58
Americas

  • President-elect Donald Trump proved a tweet can be worth a billion dollars, with $1 billion being temporarily wiped off Boeing’s stock market value, after Trump deemed the company’s new Air Force One offering too expensive and called for it to be dropped. Boeing maintained that it has so far only received a $170 million contract for capability exploration work, far from the $4 billion price tag Trump was claiming. While $2.87 has been officially budgeted for the Air Force One replacement program from 2015 through to 2021, production contracts have yet to be awarded.

  • The US State Department has cleared the sale of 178 reconditioned Stryker Infantry Carrier Vehicles to the government of Peru. Valued at $668 million, the deal also includes supporting weapons, Remote Weapon Stations, Global Positioning System navigation capabilities, special tool sets, and testing equipment. Once delivered, the vehicles will be used to support border security, disaster response, and counter-terrorism missions.

  • Veyance Technologies will carry out Abrams track assemblies for the US Army. Valued at $77 million, the contract was awarded by the Defense Logistics Agency. Work is expected to be completed by 2017.

Middle East & North Africa

  • UK Prime Minister Theresa May has reaffirmed her government’s commitment to increase defensive cooperation with Gulf allies. Addressing the Gulf Cooperation Council, May said Britain wanted to “make a more permanent and more enduring commitment to the long-term security of the Gulf” and invest more than 3 billion pounds in defense spending in the region over the next decade. British support will also go towards countering “Iran’s aggressive regional actions”.

  • The recent $619 billion defense bill passed by Congress will provide for the possibility of sending Man Portable Air Defense Systems (MANPADS) to rebel groups fighting in Syria. While the bill does impose certain restrictions on the shoulder-fired antiaircraft weapon, it represents a significant shift from prior iterations of the legislation. The version of the bill the Senate passed in June made no mention of MANPADS.

Europe

  • Statoil has confirmed that they will drop the use of H225 Super Puma helicopters, even if Norway’s Civil Aviation Authority decides to lift a ban imposed after a fatal crash off Norway in April. The Norwegian state-controlled oil firm stated that it would instead rebuild its capacity with the Sikorsky S-92. Following last April’s Super Puma crash that killed 13 oil workers flying from a Statoil-operated oil platform, unions representing oil workers expressed concern about the H225 helicopter and asked for a permanent ban.

  • Dutch F-16s will be fitted with AN/ALQ-131 electronic countermeasure pods, following an agreement between the Royal Netherlands Air Force and Northrop Grumman. Under the agreement, the company will aim to improve threat detection and jamming capabilities for the aircraft, a move they add will make pilots safer in an evolving threat environment. The pods will give Dutch fighters a fifth-generation electronic warfare technology and makes a significant leap in capability for electronic countermeasures.

Asia Pacific

Today’s Video

The world’s largest rocket. June launch of a Delta IV Heavy:

Catégories: Defence`s Feeds

Australia’s 2nd Fighter Fleet: Super Hornets & Growlers

jeu, 08/12/2016 - 00:58

RAAF F/A-18F rollout
(click to view full)

Australia’s A$ 10+ billion Super Hornet program began life in a storm. Australia’s involvement in the F-35 Lightning II program have been mired in controversy, amid criticisms that the F-35A will (1) be unable to compete with proliferating SU-30 family fighters in the region, (2) lack the range or response time that Australia requires, and (3) be both late and very expensive during early production years.

The accelerated retirement of Australia’s 22 long-range F-111s in 2010 sharpened the timing debate, by creating a serious gap between the F-111’s retirement and the F-35’s likely arrival. Further delays to the F-35 program have created new worries that even the upgraded F/A-18AM/BM Hornet fleet won’t last long enough to allow smooth replacement.

The Super Hornets survived potential cancellation, and the “surprise” stopgap buy has steadily morphed into a mainstay of the future RAAF, with a new and unique set of electronic warfare capabilities thrown into the mix. This DID Spotlight article describes the models chosen, links to coverage of the key controversies, and offers a history of contracts and key events from the program’s first official requests to the present day.

RAAF Super Hornets: Variants and Variances

In December 2006, Liberal Party Defence Minister Brendan Nelson was discussing an A$ 3 billion (about $2.36 billion) purchase of 24 F/A-18F Block II Super Hornet aircraft to fill the fighter gap. The move was described as “a surprise to senior defence officials on Russell Hill,” but hurried requests and contracts quickly made it an official purchase. Australia’s subsequent Labor government decided to keep them rather than pay cancellation fees, but added an interesting option to convert 12 into EA-18G electronic warfare planes. Now more of the fighters and electronic warfare aircraft may be on the way.

The F/A-18F Block II

AN/APG-79 AESA Radar

The 2-seat F/A-18F sacrifices some range, carrying only 13,350 pounds of fuel – 900 fewer pounds than the F/A-18E. In exchange, it adds a second crewman with an advanced attack station cockpit to assist in strike roles. The F/A-18F Block II adds a number of enhancements, but all are electronic rather than aerodynamic. The most significant improvement is its AN/APG-79 AESA radar; Australia will be the first country outside the United States to receive it, and only the 3rd country (UAE APG-80 in F-16 Block 60, Singapore APG-63v3 in F-15SGs) to receive AESA fighter radars in a US sale.

After the failure of Australia’s own “ALR 2002” electronic countermeasures program, some of its early-model Hornets and all of its F/A-18F Super Hornets will mount Raytheon’s AN/ALR-67v3 instead. This is a radar warning receiver that provides visual and audio alerts to F/A-18 aircrew when it detects ground-based, ship-based, or airborne radar emissions hitting the aircraft. It is the modern self-protection standard for F/A-18 E/F Super Hornet aircraft, and has also been incorporated into a number of earlier model Hornets flown around the world.

Other items bought specifically for the F/A-18F fleet include Raytheon’s AN/ASQ-228 ATFLIR surveillance and targeting pods, and AIM-9X short range air-to-air missiles. Australia’s Hornet fleet uses LITENING III pods and AIM-132 ASRAAMs instead, but ATFLIR and AIM-9X are the only fully qualified counterparts for the Super Hornet.

This kind of unique equipment drives up the long-term cost of the Super Hornet fleet by creating additional training, inventory, and maintenance requirements. On the other hand, there’s a flexibility bonus as well as a cost penalty. The Super Hornets are qualified with a number of other weapons that wouldn’t be available to Australia’s Hornets or its initial F-35As, such as AGM-84K sea and land attack missiles, AGM-88E AARGM advanced radar-killing missiles, etc.

Electronic Attack: EA-18G

EA-18G: key systems
(click to view full)

For operators who need much greater electronic defense and even offensive capabilities, the EA-18G Growler electronic warfare version is a derivative of the F/A-18F Block II that removes the internal gun, adds electronics within the aircraft to help it detect and jam enemy radars, and mounts 4 specialized ECM (Electronic CounterMeasures) pods under the wings.

In the US Navy, EA-18Gs will replace the EA-6B Prowler, which is based on a Vietnam-era airframe and has become the only Western electronic warfare aircraft capable of accompanying fighters into combat.

Australia’s EA-18G buy has made them the first export customer for an American electronic warfare fighter, and will give the RAAF an historically novel range of capabilities. As of February 2009, 12 of Australia’s 24 F/A-18Fs were slated to receive the additional wiring required to allow future EA-18 conversions. They were delivered that way, and as of December 2012, orders for the associated equipment, jamming pods, and remaining conversion work have begun, and a 2014 contract will add 12 new-build EA-18Gs to carry them.

If Australia eventually wants to expand to 24 EA-18Gs, they could do so in future by paying conversion costs for 12 of their F/A-18Fs, and buying the required jammers.

Training & Infrastructure

Super Hornet TOFT
(click to view full)

The Australian order will include training simulators, which come in 3 key variants of their own.

Tactical Operation Flight Trainers (TOFTs) are for advanced pilot tactical training. Each one is a Boeing/ L-3 Link collaboration including L-3 Link’s 360-degree SimuSphere visual display, SimuView image generator, and Boeing Training Systems & Services’ mission computer emulation; simulated radar, electronic countermeasures, and Joint Helmet Mounted Cueing System; and high-fidelity crew station controls.

The Boeing-built Low Cost Trainers (LCT) run a mission computer emulation, and provide pilot and air combat officer training for navigation, weapons, radar, and electronic countermeasures.

The Integrated Visual Environment Maintenance Trainer (IVEMT) is a maintenance trainer that includes an interactive 3-D model environment, test/support equipment and realistic aircraft responses for more than 500 routine troubleshooting procedures.

The Future of the Fleet

The Gap
(click to view full)

The RAAF can be expected to hang on to its Super Hornets for many years. Its F/A-18A/B Hornets entered service in 1987, and the last aircraft in that 71-plane fleet will retire in 2022 thanks to upgrades and life extension overhauls. A similar career for the Super Hornets would see them serve beyond 2040, and the EA-18G’s usefulness could give them an even longer career.

There had been talk of retiring the F/A-18F fleet well before 2040, and having an all-F-35 fleet. Instead, growing orders made it likely the Super Hornets and Growlers would end up subtracting F-35s from Australia’s planned 100-fighter fleet. The May 2013 White Paper dropped planned F-35A orders to 72 planes, with the ability to raise that to 90 planes if Australia wants to replace its Super Hornet family around 2030. Give the F-35’s higher operating costs, and Australian demographics, it remains to be seen whether Australia will be able to afford that 4th squadron.

Meanwhile, the late arrival of Australia’s F-35As pushed Australia toward a second bridge buy, in order to keep up fighter numbers as older F/A-18AM/BM Hornets are retired. Once the 12 planned EA-18G Growler electronic warfare planes are under contract, the odds of early retirement for the Super Hornet fleet will drop to almost zero, and the government is beginning to acknowledge this publicly.

Contracts & Key Events

Even though these are Australian planes, readers will notice that American military departments manage the contracts. This is the normal procedure for purchases designated as US Foreign Military Sales, vs. a Direct Commercial Sale that would let Australia manage its buys directly.

2014 – 2016

12 EA-18Gs bought; F-35 approval rises to 72.

F-35 mockup
(click to view full)

December 8/2016: Australia has been cleared to purchase AEA-18G Growler Aircraft Electronic Warfare Range Systems in a $115 million foreign military sale. The deal includes two systems, personnel training, integration testing, and other supporting equipment. Alongside the US, Australia is the main customer of EA-18G Growler aircraft.

Oct 9/14: Training. L-3 Communications Corp. in Arlington, TX receives a $12.1 million firm-fixed-price delivery order for 2 EA-18G Tactical Operational Flight Trainers (TOFT), 1 brief/debrief Station, 2 F/A-18 retrofit kits, spares, and associated technical documentation for the government of Australia under the foreign military sales program.

Work will be performed in Arlington, Texas, and is expected to be completed in November 2015. Foreign military sales funds in the amount of $12,086,117 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Training Systems Division, Orlando, FL, is the contracting activity (N61340-12-G-0001, PO 0004).

Oct 8/14: Support & deployment. A $7.5 million delivery order for peculiar support equipment and spares, to outfit emerging squadron stand-ups for extended Australian deployment of F/A-18F and EA-18G aircraft. In addition, this order includes a support equipment integrated logistics support package. All funds are committed immediately.

Australian F/A-18Fs are currently based at Al Minhad AB in the UAE, where they are conducting strikes in Iraq against The Islamic State.

Work will be performed in St. Louis, MO, and is expected to be complete in October 2016. US Navy Naval Air Systems Command in Lakehurst, NJ acts as Australia’s FMS agent (N68335-10-G-0012, DO 0057).

Aug 28/14: HARM computers. Raytheon in Tucson, AZ receives $24.6 million for a firm-fixed-price delivery order to provide 158 High Speed Anti-Radiation Command Launch Computers for the U.S. Navy (121) and the government of Australia (37) for F/A-18 E/F and EA-18G aircraft. These CLCs work with AGM-88 HARM and AARGM missiles, which are designed to destroy enemy air defense radars. All funds are committed immediately, using FY 2012 – 2013 US Navy ($20.5M / 83.5%) and Australian ($4.1M / 16.5%) budgets.

Work will be performed in Tucson, AZ, and is expected to be complete in February 2018. US NAVAIR in Patuxent River, MD manages the contract (N00019-10-G-0006, DO 0060).

Aug 18/14: EA-18s. General Dynamics Advanced Information Systems in Minneapolis, MN receives a $16.3 million firm-fixed-price contract for the full-rate Lot 38 production of 60 Advanced Mission Computer Type 3s for EA-18Gs ordered by the US Navy (48 AMCs / $9.8 million / 60%) and the government of Australia (12 AMCs / $6.5 million / 40%). All funds are committed immediately, using FY 2014 US Navy aircraft budgets and Australian FMS funds.

Work will be performed in Bloomington, MN and is expected to be complete in August 2016. This contract was not competitively procured pursuant to 10 USC 2304 (c)(1) by US Naval Air Systems Command in Patuxent River, MD (N00019-14-C-0068).

Aug 11/14: EA-18s. General Electric Co. in Lynn, MA receives a $311.5 million firm-fixed-price contract modification for 75 F414-GE-400 engines and associated devices: 48 production installs for the US Navy ($194.9 million / 63% / all production installs), and 27 for Australia ($116.6 million / 37% / 24 EA-18G production installs and 3 spares), under Production Lot 14. In addition, this modification provides for spare after burner modules, fan modules, high pressure combustor modules, combustor modules, and high and low pressure turbine modules for the US Navy and the government of Australia. All funds are committed immediately, using FY 2013-14 US Navy aircraft budgets, and Australian funds.

Work will be performed in Lynn, MA (59%); Hooksett, NH (18%); Rutland, VT (12%); and Madisonville, KY (11%), and is expected to be complete in September 2016. US Naval Air Systems Command in Patuxent River, MD manages the contracts (N00019-11-C-0045).

July 30/14: Weapons. The RAAF has tested their AGM-154C Joint Standoff Weapon glide bomb against a hardened wall target at the RAAF Woomera Test Range. That’s a difficult target for an active seeker, though it’s easy enough to get in range using the GPS. Sources: Raythgeon, “Royal Australian Air Force scores direct hit with JSOW C”.

July 14/14: Boeing in St. Louis, MO receives a $6.9 million firm-fixed-price contract modification to a previously awarded for aircraft armament equipment items: SUU-789A/A centerline pylons for the US Navy (35) and Royal Australian Government (15); and ALE-50 towed decoy well covers for the U.S. Navy (11). All funds are committed immediately.

Work will be performed in El Segundo, CA (95%); Irvine, CA (4%); and St. Louis, MO (1%), and is expected to be complete in May 2017. This contract combines purchase for the U.S. Navy ($4.9 million / 70%) and the government of Australia ($2 million / 30%) under the Foreign Military Sales Program (N00019-14-C-0032).

July 3/14: Support. Boeing in St. Louis, MO receives $20.8 million for non-recurring engineering and associated program management, logistics and spares for Australia’s “AEA-18G aircraft” under the Foreign Military Sales Program.

All funds are committed immediately. Work will be performed in St. Louis, MO (79%); El Segundo, CA (11%); Palm Bay, FL (3%); and other locations within the continental United States (7%), and is expected to be completed in September 2017. US Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-11-G-0001, DO 0201).

June 30/14: EA-18Gs. Boeing in St. Louis, MO receives a $1.939 billion fixed-price-incentive-fee contract for full rate production of 11 Lot 38 F/A-18E aircraft for the US Navy, and 33 EA-18G aircraft for the US Navy (21) and the government of Australia (12 for $533.4 million, which is 27.3% of the total). These are standard Block II aircraft rather than Advanced Super Hornet configuration, and Australia will have to pair its airframes with their expensive jamming equipment in order to field operational EA-18G jammers.

$1.406 billion in USN FY 2013 and 2014 aircraft budgets is committed immediately. Work will be performed in El Segundo, CA (46%); St. Louis, MO (30%); Fort Worth, TX (2%); East Aurora, NY (1.5%); Irvine, CA (1percent); Ajax, Ontario, Canada (1%), and various locations within the United States (18.5%), and is expected to be complete in December 2016. This contract was not competitively procured pursuant to 10 USC. 2304(c)(1). US NAVAIR in Patuxent River, MD manages the contracts for the US Navy, and acts as Australia’s agent (N00019-14-C-0032).

12 EA-18Gs

April 23/14: F-35s. Australia’s new Liberal Party government announces that they’ll buy up to 58 F-35s, which would raise the fleet size to the 72 aircraft mentioned in the Labor Party’s May 2013 White Paper (q.v. May 3/13). This isn’t a contract yet, and the budget is supposedly fixed. If F-35 costs remain high until 2020, and rework is expensive, it will lead to cuts in Australian orders. Even so, it’s a clear sign that the Super Hornet fleet won’t be growing past 36 planes. Read “Australia Raises their F-35 Commitment” for full coverage.

2013

Request for more; ANAO Report.

RAAF F/A-18F, armed
(click to view full)

Dec 17/13: ANAO Report. Australia’s National Audit Office releases their 2012-13 Major Projects Report, which includes some interesting notes concerning the JSOW-C1/ Block III. Australia to place an interim buy of AGM-154Cs in time for the F/A-18F’s planned December 2010 Initial Operating Capability, and they did. But the AGM-154C-1s which can also be used against ships and moving targets won’t be done until at least February 2016, because software integration issues forced the US Navy to delay JSOW-C1 integration until the next core software release. They also canceled the planned September 2014 tests. Other issues and notes:

“The Super Hornet is meeting its capability objectives. Identified anomalies, limitations and improvements of the USN common aircraft software, radar, electronic warfare, mission planning, and training devices are being fed back into the USN spiral development program as part of Super Hornet sustainment, and RAAF/DMO are accessing opportunities to influence USN decision makers on the priority for addressing these areas under a RAAF/USN common paradigm.

….Spares availability has been affected by late delivery of spares because of Original Equipment Manufacturer delays and USN delays in award of Supplier contracts leading to an impact on performance, supportability and schedule.

….There is a possibility that the Forward Looking Infra Red performance will be degraded. This was identified as an emergent risk in the 2011-12 MPR and has now been realised. Engineering Change Proposal No 35 will introduce an Electronic Image Stabilisation Card. This issue has been transferred to Air Combat and Electronic Attack Systems Program Office Risk and Issues Log for management.”

Sept 25/13: Weapons. ATK Defense Electronic Systems in Woodland Hills, CA receives a $102.4 million firm-fixed-price contract for AARGM Full Rate Production Lot II, which includes the conversion of 8 AGM-88B HARM missiles to AGM-88E AARGM CATM no-rocket training missiles ($9.3M/ 9% of order) for the Government of Australia (N00019-13-C-0162).

May 31/13: Weapons. The US Navy signs an agreement with the Australian Government to provide training related to Raytheon’s AGM-88 HARM (High Speed Anti-Radiation Missile) and ATK’s AGM-88E AARGM (Advanced Anti-Radiation Guided Missile), as part of the RAAF’s EA-18G Growler buy. Both weapons will be integrated with the Growler, so they’ll be able to support whichever missile the RAAF chooses.

While it’s just a training capability, its the 1st Foreign Military Sales agreement with any country regarding AARGM. Italy is already a customer, but as a co-development partner not an FMS customer. Subsequent contracts begin to buy AGM-88E CAT training missiles. Sources: US NAVAIR, June 18/13 release.

May 3/13: White Paper. Australia’s Labor government releases its 2013 Defence White Paper. Australia’s plans for their Super Hornet fleet have changed:

“…the Government has decided to retain the current 24 F/A-18F Super Hornets (one operational squadron) in their current air combat and strike capability configuration. The Government has also decided to acquire 12 new-build EA-18G Growler electronic attack aircraft instead of converting 12 of Australia’s existing F/A-18F Super Hornet aircraft into the Growler configuration.”

Australia’s Feb 28/13 export request already covers the EA-18Gs, while their May 22/12 export request covers the added electronics for 12 planes. The plan also commits Australia to 3 F-35 squadrons (72 planes), which is pretty meaningless from a government that will be long gone before those larger buys become reality. It is a good way of spending less now by promising more later, knowing all the while that the promise isn’t likely to be kept. The Labor government adds that any decision on a 4th F-35 squadron to replace the Super Hornet fleets won’t be made until “around 2030.” Given budgetary entitlements and demographic realities, we wouldn’t bet on that, either. Australia DoD.

Feb 28/13: More. The US DSCA announces [PDF] Australia’s official request for another 24 Super Hornet family planes and associated equipment, which could be worth up to USD $3.7 billion. The split includes 12 more EA-18Gs, but its special equipment is missing from the request: AN/ALQ-99F-V and ALQ-218 jamming pods, CN-1717/A INCANS to prevent the plane from jamming itself, and equipment associated with radar-killing HARMN/AARGM missiles.

Without those things, Australia has essentially asked to buy another 12 pre-wired F/A-18Fs, though they can always share the items bought under the May 22/12 special equipment DSCA request throughout the fleet. This request could be negotiated into contracts for up to:

Aircraft & Stores

  • 12 F/A-18 E/F Super Hornet aircraft
  • 12 “EA-18G Growler” aircraft
  • 54 F414-GE-402 engines (48 + 6 spares)
  • 35 AN/APG-79 AESA radar systems (24 + 9 spares – a lot for an AESA)
  • 15 M61A2 Vulcan Cannons (Super Hornets only, 12 + 3 spares)
  • 72 LAU-127 Guided Missile Launchers
  • 2 engine inlet devices
  • 30 AN/AYK-29(V) Distributed Targeting Systems (DTS)
  • 24 AN/ASQ-228 Advance Targeting Forward Looking Infrared (ATFLIR) Pods

Defensive

  • 40 AN/ALQ-214 Integrated Countermeasures Systems
  • 24 AN/ALR-67(V)3 Electronic Warfare Countermeasures Receiving Sets
  • 24 AN/ALE-47 Electronic Warfare Countermeasures Systems
  • 400 AN/ALE-55 Fiber Optic Towed Decoys

Avionics

  • 80 Joint Helmet Mounted Cueing Systems (JHMCS)
  • 32AN/AVS-9 Night Vision Goggles or Night Vision Cueing Device System
  • 70 AN/USQ-140 MIDS-LVT Link-16 or RT-1957(C)/USQ-190(V) Joint Tactical Radio Systems
  • 4 AN/PYQ-21 DTS Mission Planning Transit Cases
  • 100 Digital Management Devices with KG-60s
  • 36 Accurate Navigation Systems
  • 40 AN/APX-111 Combined IFF Interrogator Transponders
  • 80 AN/ARC-210/RT-1990A(C) Communication Systems
  • 40 AN/PYQ-10 Simple Key Loaders (SKL)
  • 80 KIV-78 Mode 4/5 Module
  • 48 COMSEC Management Workstations (CMWS)

The contractors will also provide system integration and testing, tools and test equipment, support equipment, spare and repair parts, publications and technical documents, personnel training and training equipment, aircraft ferry and refueling support, and other forms of U.S. Government and contractor technical assistance. Implementation of this proposed sale may require the assignment of additional U.S. Government or contractor representatives to Australia, but that remains to be negotiated.

The prime contractors will be Boeing in St. Louis, MO; General Electric Aircraft Engines in Lynn, MA; Data Link Solutions in Chesterfield, MO; BAE Systems in Rockville, MD; Northrop Grumman Corporation in Falls Church, VA; Raytheon Corporation in Waltham, MA; and Visions Systems International in San Jose, CA.

Request: 12 more F/A-18Fs, 12 more EA-18Gs

Feb 21/13: Here to stay. Australia’s government is beginning to confirm what many have surmised: the Super Hornets are here to stay, and the fleet could rise to 48 planes. Minister for Defence Stephen Smith, to Australian Broadcasting Corp. News:

“We have committed ourselves contractually to two Joint Strike Fighters. We’ll receive those in 2014 in the United States for training purposes. We’ve announced that we will take another 12, effectively our first squadron, but we have not made a judgment as to when we will place the orders for those…. at the end of last year, we placed a letter of request with the United States authorities to enable us to investigate the potential purchase of up to 24 more Super Hornets.

We’ve now got a fleet of 24 Super Hornets, 12 of those can be wired up for the electronic warfare capability Growler, and we’ve got about 70 Classic Hornets…. [The F-35] has been subject to very serious scheduling delays and that’s what’s causing us to risk a gap in capability…. we’re now looking not just to the Super Hornets [covering a] gap in capability, but whether into the longer term it makes sense for Australia to have a mixed fleet, a mixed fleet of Super Hornets, Growler and Joint Strike Fighters, which is what you essentially see the United States Navy and Air Force now embarking upon.”

Jan 28/13: F-35 delays. The Sydney Morning Herald reports that:

“According to a leaked draft of the 2013 defence white paper, Australia will take delivery of just two Lockheed Martin JSFs by 2020, indicating the government will need to buy a batch of rival Boeing F/A-18F Super Hornets…. The white paper states the government “remains committed” to acquiring the JSF but makes no mention of the next batch of 12 planes, which were expected around 2020.”

Given that time frame, a buy of 12-24 more Super Hornets seems very likely.

2012

$1.5B order for 12 Growler conversions.

EA-18G in front,
F/A-18F behind
(click to view full)

Dec 20/12: EA-18G Boeing in St. Louis, MO receives a $164 million firm-fixed-price contract, exercising an option to begin procurement of 12 Airborne Electronic Attack Group B-Kits and 4 Equivalent Ship-sets of spares for the Royal Australian Air Force.

Work will be performed in Baltimore, MD (41.1%); St. Louis, MO (36.3%); Bethpage, NY (19%); and Fort Wayne, Ind. (3.6%), and is expected to be complete in March 2015. All contract funds are committed immediately. US Naval Air Systems Command in Patuxent River, MD manage the contract on behalf of its Foreign Military Sale client (N00019-09-C-0086). Note that the entire conversion of 12 aircraft is expected to cost about $1.5 billion (vid. Aug 23/12).

EA-18G orders begin

Dec 18/12: Raytheon Technical Services Co. LLC in Indianapolis, IN receives a $17.3 million firm-fixed-price delivery order for 102 LAU-115B/A missile launchers to equip US Navy F/A-18E/F and EA-18G aircraft (86, $15.1M), and Australian F/A-18Fs (16, $2.2M). These launchers are used with various adapters for air-to-air missiles: short range AIM-9 Sidewinder/ AIM-132 ASRAAM, or medium range AIM-7 Sparrow/ AIM-120 AMRAAM missiles.

Work will be performed in Indianapolis, IN in and is expected to be complete in October 2015. All contract funds are committed (N00019-10-G-0006).

Aug 23/12: EA-18G. Minister for Defence Stephen Smith and Minister for Defence Materiel Jason Clare announce their decision to proceed with the conversion of 12 Super Hornets into Growlers for about $1.5 billion, with availability expected for 2018.

EA-18G conversion OK

Aug 7/12: EA-18G. Australia’s Canberra Times gets some clarification on the difference between the Australian government’s A$ 300 million estimate to convert 12 F/A-18Fs into EA-18Gs, and the USD 1.7 billion mentioned in the May 22/12 DSCA request. Short answer: The difference is the $1.4 billion cost of the 34 AN/ALQ-99 jamming pods, if they are bought outright:

“Australia wasn’t planning to buy the ALQ-99 electronic warfare pods, just the systems and hardware to allow them to be fitted on an “as required” basis… a Defence spokesman has explained. “The initial proposal that underpinned the 2009 cost estimate would have provided a lesser capability than Defence now proposes to acquire”. The pods would have had to be obtained from the United States Navy whenever Australia wanted them, a source said.”

The key tradeoffs here are money, risk, and time. An “obtain as needed” approach might work reasonably well in coalition operations, and if Australia sees a low risk of high intensity regional conflict over the next decade. In exchange for some risk that the pods wouldn’t be available in all situations, Australia would save money, and buy time for the USA to field a more reliable “Next Generation Jammer” system around 2020. If NGJ succeeds, Australia could either be approved for the new technology and then invest large sums, or seek to buy older ALQ-99 pods at a discount. On the flip side, paying for the ALQ-99 pods now ensures that Australia has a jamming capability now, which isn’t dependent on either US political whims, or on the NGJ’s ability to overcome its technical challenges and Navy budget crunches.

June 27/12: Radars. Raytheon in El Segundo, CA receives a $6.7 million cost-plus-fixed-fee delivery order, for upgrades that will let the F/A-18 AN/APG-79 AESA radar commercial depot diagnose and validate repairs of RAAF APG-79s under the Foreign Military Sales Program.

Work will be performed in El Segundo, CA (70%), and Forest, MS (30%), and is expected to be complete in August 2014. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-10-G-0006).

May 22/12: EA-18G request. The US DSCA announces [PDF] Australia’s formal request for 12 EA-18G Modification Kits. They include:

  • 34 AN/ALQ-99F-V Tactical Jamming System Pods, 2 per operational aircraft, plus 10 spares. These are known to have serviceability issues.
  • 22 CN-1717/A Interference Cancellation Systems (INCANS), which prevent the plane from jamming itself.
  • 22 R-2674C/A Joint Tactical Terminal Receiver (JTTR) Systems
  • 30 LAU-118 Guided Missile Launcher pylons, for AGM-88 HARM/AARGM anti-radar missiles
  • A Command Launch Computer (CLC) for HARM/AARGM missiles
  • Plus support and test equipment, publications and technical documentation, personnel training and training equipment, spare and repair parts, and other forms of U.S. Government and contractor support.

Implementation of this proposed sale may require the assignment of additional U.S. Government or contractor representatives to Australia; that will be determined in negotiations. The estimated cost is up to $1.7 billion, and the prime contractor will of course be Boeing in St. Louis, MO.

EA-18G kits request

May 10/12: Need a HUG? In the wake of budget plans that would slash defense spending, and move further F-35A buys back 2 years due to delays in the program, Australia is considering its bridging options. Minister for Defence Stephen Smith:

“The Budget effect of [our F-35A delay] is that it takes out of the forward estimates for this year’s budget about $1.6 billion… In the meantime, I will not allow, and the Government will not allow, a gap in our air combat capability… Government will also consider whether any alternative options need to be implemented to supplement and ensure our air combat capability in the light of Joint Strike Fighter delays.

An obvious option is the [F/A-18F]… However, other alternatives will be examined before any decision is taken. This includes considering the life of our existing 71 ‘classic’ F/A-18 Hornets [via the HUG program].”

March 30/12: EA-18G initial buy. Australia announces an A$ 19 million buy of long-lead time items, which would be used to convert RAAF F/A-18Fs into EA-18G Growler electronic attack aircraft. This is on top of the A$ 35 million spent to ensure that 12 new-build F/A-18Fs came with some of the necessary systems already built-in, which is much cheaper that cutting the planes open to retrofit them later. At the same, all concerned stress that no final decision has been taken regarding that conversion. Minister for Defence Stephen Smith:

“Growler was used very effectively by the US Navy in the recent Libya conflict… Whether we proceed down the track to adopt and acquire the Growler capability is a very substantial and significant decision… The Government has always been attracted to this capability, which is why on two occasions in 2009 and now, for the expenditure of a modest capital sum, we have kept ourselves in the game in this respect… [Further] judgments and decisions will be made in the course of this year… The formal process in terms of acquiring the long-lead items is what’s described as a Letter of Request and we’ve received every indication from the United States system, including the United States Air Force, that our Letter of Request will be accepted… So we are absolutely confident that if we determine to pick up the capability that our United States colleagues will respond positively. We’ve been working very closely with them in that respect.”

See: Australian DoD press conference transcript.

March 30/12: Boeing in Saint Louis, MO receives a firm-fixed-price, sole-source contract with a maximum $12.9 million to support RAAF F/A-18F Super Hornets from FY 2012 through June 2015, as a Foreign Military Sale transaction. The US Defense Logistics Agency Aviation in Philadelphia, PA acts as the RAAF’s agent (SPM4A1-09-G-0004).

March 23/12: Boeing in St Louis, MO receives a $7.2 million firm-fixed-price delivery order for RAAF Super Hornet operational test program sets, support equipment, and spares. Work will be performed in St. Louis, MO, and is expected to be complete in November 2013. The Naval Air Warfare Center Aircraft Division in Lakehurst, NJ manages the contract, on behalf of their Foreign Military Sale client (N68335-10-G-0012).

Feb 22/12: EA-18s. Adelaide’s The Advertiser reports that March 2012 will feature Defence Minister Stephen Smith announcing an A$ 200-300 million decision to upgrade 12 of Australia’s Super Hornets to EA-18 electronic warfare planes.

“News Limited understands that the first [EA-18] aircraft will be converted at the Boeing factory in St Louis and the remainder at Amberley RAAF base near Brisbane.”

It also reports that the Minister favors a September 2012 decision to buy another 12 F/A-18Fs, in order to make up for the F-35A’s expected lateness. The RAAF is reportedly against this, given expected defense reductions this year, and worries that the cost will eventually be paid for by fewer future F-35s. Which may be true. On the other hand, Australia needs to keep its fleet combat-capable while it waits.

Feb 14/12: Top Guns. Cubic Defense Applications has received a new $11+ million contract valued at more than $11 million to provide the RAAF’s Super Hornets with the P5 Tactical Combat Training System (P5TCTS). The system isn’t a simulator, it’s a set of tracking and debriefing equipment used for monitoring live-flight exercises, including simulated aerial combat. The RAAF’s new P5TCTS will be very similar to the current U.S. Navy TCTS system, and will include airborne instrumentation pods built by DRS, transportable ground systems with live monitoring, and portable ground subsystems, which includes Cubic’s Individual Combat Aircrew Display System (ICADS) software for debriefing.

Australia is an existing Cubic customer, and has installed their 4th-generation system at RAAFB Williamstown. The P5TCTS will be located at the Super Hornets’ base instead, which is RAAFB Amberley, and delivery is expected in late 2012. Cubic is also contracted to make sure these 2 systems can merge data, allowing for training between Hornet and Super Hornet aircraft. Australia’s future F-35As will come with P5TCTS already installed internally. Defense Update.

2011

All Super Hornets delivered; Ground trainers arrive in Australia; AMRAAM request; EA-18 and F-35 questions.

Celebration flight
(click for whole photo)

Oct 21/11: All 24 arrived. The last 4 of 24 Super Hornets arrive at RAAF Base Amberley.

The occasion is marked by celebration flights of 16-20 Super Hornets in formation over parts of northern New South Wales and SE Queensland. Australia’s DoD says that they have been delivered on schedule and under budget. Minister for Defence Materiel speech | Australia DoD | Boeing | US NAVAIR.

All 24 in Australia

Oct 19/11: EA-18s. During an interview with Australia Broadcasting Corporation Radio, Labor government defense minister Stephen Smith discusses the possibility of turning 12 of Australia’s Super Hornets into EA-18G Growler electronic warfare fighters, whose conversion price tag is described by the interviewer as “upwards of A$ 300 million.” The EA-18G recently saw their its combat use over Libya, and:

“We’ve just started the process of making a judgment about whether acquiring [them] would be in our national interest or our national security interest… we took the sensible precaution of wiring up half of our Super Hornets for this potential. But it is a very expensive capability. We’re just going through the process… this possibility would come as no surprise to our friends and neighbours in the region. It’s been on the public record before and part of the [2009 Defence] White Paper.”

The minister does not contradict the price figure, and in a related ABC TV interview, he mentions costs of “hundreds of millions.” The minister also implied that further delays or issues with the F-35A could make an EA-18 conversion more likely, as a way to strengthen Australia’s air capability in the interim. ABC radio transcript | ABC24 TV news transcript | Reuters.

Sept 12/11: More F/A-18Fs? During a joint press conference with Canada’s defense minister Peter MacKay, Australian Minister for Defence Stephen Smith says that they might buy more Super Hornets – but no decision has been taken. The window is closing, however, unless the USA extends F/A-18 production beyond MYP-III. So:

“Our position on Joint Strike Fighters I’ll restate. We’ve committed ourselves to 14. The White Paper or the Defence Capability Plan talks in terms of ultimately a number up to or around 100, but we’ve committed to 14… we’ll do an exhaustive risk assessment in the course of next year and make a judgment next year about whether we need any transition capability… The last thing I will allow will be a gap in our capability for our air combat capability. And if I am concerned or worried or not persuaded there won’t be a gap in terms of delivery of the Joint Strike Fighters, then an obvious option for us is more Super Hornets. We’ve made no decision to that effect.”

July 15/11: 3 more. Australia’s DoD:

“The Minister for Defence Materiel Jason Clare today welcomed three new F/A-18F Super Hornets worth more than [$A]175 million to RAAF Base Amberley in Queensland… This is the fourth batch of Super Hornets the RAAF has received, bringing the current Australian fleet to eighteen. A further six aircraft will be delivered by the end of the year.”

The photo archive blurbs add:

“The Super Hornets participated in their first overseas exercise in May for Bersama Shield in Malaysia, which brought the project another step closer to declaring Final Operational Capability anticipated in 2012… The Super Hornet transition project remains on budget and on time.”

July 12/11: Former USAF F-16 pilot Mike Gerzanics pens “Testing the new-generation Super Hornet“, documenting his experience flying an F/A-18F Block II simulator. Overall, he was impressed by the radar and liked the aircraft, but said:

“My overall feel for the pilot/vehicle interface, while it is effective and combat proven, was that it lags newer aircraft. Tactical information, for the most part, is presented on separate displays, forcing the pilot to do much of the fusion. This federated arrangement is no different from what I experienced when I flew a Block 60 F-16 simulator… [In contrast,] The F-35’s level of integration and sensor fusion was a generation ahead of what I experienced in the Block II Super Hornet and Block 60 F-16 simulator sessions… A next-generation [Super Hornet] cockpit is also under development and has a very large 19in x 11in touch-sensitive display. I was able to fly a cockpit built around this display and can confirm that it provides an ideal palette to display fused tactical information.”

June 2/11: AMRAAMs for Super Hornets. The US DSCA announces [PDF] Australia’s formal request to buy up to 110 AIM-120C-7 AMRAAMs, 10 AIM-120C-7 Air Vehicle-Instrumented (tracking telemetry replaces warhead), 16 AIM-120C-7 CATMs (has seeker, no motor), plus containers, weapon system support equipment, support and test equipment, site survey, transportation, repair and return, warranties, spare and repair parts, publications and technical data, maintenance, personnel training and training equipment, and other forms of support. The DSCA specifically notes that:

“The proposed sale will allow the Australian Defense Force to complete Australia’s F/A-18 program under their Project AIR 5349. Phase I allowed acquisition of F/A-18 Block II aircraft and Phase II is for the acquisition of weapons.”

The estimated cost is $202 million, with Raytheon Missile Systems in Tucson, AZ as the contractor. Actual costs will, of course, depend on the terms of any eventual contract. Australia already uses AMRAAMs on its older F/A-18A/B Hornets, but its F-111s did not. A larger AMRAAM-capable fleet means a need for a few more missiles. This proposed sale wouldn’t require any additional U.S. Government or contractor representatives in Australia.

AMRAAM missile request

May 9/11: Trainers. Boeing announces that it has delivered 6 F/A-18E/F Super Hornet aircrew and maintenance trainers to RAAF Base Amberley in Queensland: 2 Tactical Operation Flight Trainers (TOFT), 2 Low Cost Trainers (LCT), and 2 Integrated Visual Environment Maintenance Trainers (IVEMT); plus 1 conversion of a VEMT to full IVEMT capability. They are the first Super Hornet training devices for a Foreign Military Sale customer.

See the “Variants and Variances” section, above, for full details re: each type of flight trainer. The short explanation is that TOFTs are for full simulation, LCTs for key cockpit processes like navigation and weapons use, and IVEMT for maintenance training.

Trainers & sims in.

March 25/11: Boeing receives a $10.6 million firm-fixed-price delivery order for 741 Honeywell model GG1320 ring laser gyros, to be installed in F/A-18E/F and EA-18G aircraft for the U.S. Navy (714) and the government of Australia (27 spares).

Work will be performed in Clearwater, FL (87%), and St. Louis, MO (13%), and is expected to be complete in April 2013. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-11-G-0001).

March 4/11: Martin-Baker Aircraft Co., Ltd. in Middlesex, England receives an $18.3 million firm-fixed price contract modification, exercising an option for 65 Navy Aircrew Common Ejection Seats (NACES). They will equip F/A-18 A+/C+ Hornets and F/A-18E/F Super Hornet and EA-18G Growler aircraft flown by the U.S. Navy ($18.2M/ 99.4%), and the air forces of Australia (F/A-18A+ and F/A-18F; $51,920/ 0.27%) and Kuwait (F/A-18C+; $61,730; 0.33%). This option also buys associated hardware, equipment, technical data, and production support services.

Work will be performed in Johnstown, PA (60%), and Middlesex, England (40%), and is expected to be complete in December 2012. Contract funds will not expire at the end of the current fiscal year. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-07-C-0011).

2010

F-111s retired; 1st F/A-18F lands in Australia, with help from Omega; 15/24 delivered by year end; ROVER kits.

Awaiting transfer
(click to view full)

Dec 8/10: 4 more. Another 4 planes arrive at RAAFB Amberley, making 15, and Australia’s 1st squadron of F/A-18F Super Hornet fighter jets is declared operational and ready for duty. The current fleet includes the first 3 of Australia’s EA-18 compatible Super Hornets.

“The fleet of Super Hornets has reached initial operational capability on time and on budget… The four newly arrived aircraft departed from the Boeing facility in St. Louis USA, and over a number of days transited to RAAF Base Amberley via Travis Air Force Base California, Hickam Air Force Base in Hawaii and Guam.”

See Australia DoD release & photo gallery | Boeing.

Dec 3/10: F-111s retired. Australia formally retires its F-111 fleet. Australia DoD event photos.

Nov 15/10: Trainers. US NAVAIR announces that its Naval Aviation Training Systems program office (PMA-205) delivered 2 Super Hornet Integrated Visual Environment Maintenance Trainers (IVEMT) to Amberley Air Force Base, Ipswich, Australia in October 2010.

“The IVEMT is a 3-D visual trainer which allows military personnel to virtually navigate through multiple aircraft systems. It provides maintainers training on ground operation, maintenance, and testing. It also offers troubleshooting procedures for the F/A-18 Super Hornet aircraft including avionics, environmental control, electrical, flight control, fuel, engines, landing gear, and hydraulic systems… [It] is the first Super Hornet maintenance trainer to be delivered to a foreign military. The design is an upgraded version of the U.S. Navy’s Visual Environment Maintenance Trainer (VEMT)… built by Boeing, St. Louis, Mo., and DiSTI, Orlando, Fla.”

Sept 23/10 Boeing announces that the 1st RAAF F/A-18F Super Hornet with EA-18 pre-wiring has completed production. That fighter took its first test flight on Aug 12/10. Boeing is pre-wiring the RAAF’s second lot of 12 Super Hornets for potential electronic attack capability conversion, giving them a new capability dimension while eliminating high retrofit costs later.

As of this announcement, the RAAF has 11 Super Hornets operating at RAAF Base Amberley in Queensland, all of which were delivered ahead of schedule and on budget. Boeing is scheduled to deliver Australia’s 24th Super Hornet in 2011.

July 26/10: ROVER. Boeing in St. Louis, MO receives an $11.5 million firm-fixed-price order against a previously issued basic ordering agreement (N00019-05-G-0026) for 889 Rover data link kits, in support of engineering change proposal #6342 for the F/A-18E/F Super Hornet’s ATFLIR surveillance and targeting pod. Orders will be divided between the US Navy (837 kits, $9.76 million, 85%) and the Royal Australian Air Force (52 kits, $1.7 million, 15%).

The ATFLIR pod is actually a Raytheon product, but Boeing is the Super Hornet’s system integrator and manufacturer. Work will be performed in St. Louis, MO (70.5%); Spring Valley, CA (17.5%); Wallingford, CT (6.5%); Murphy, NC. (3.5%); and Van Nuys, CA (2%). Work is expected to be completed in July 2011. The Naval Air Systems Command in Patuxent River, MD manages this contract.

July 20/10: Trainer IOC. L-3 Link Simulation & Training (L-3 Link) announced today that the first F/A-18F Tactical Operational Flight Trainer (TOFT) has achieved initial training capability status, including a fully integrated mission briefing and debriefing system. L-3 Link is under contract from Boeing Training Systems and Services to support the delivery of 2 F/A-18F TOFTs to RAAF Base Amberley. See also Feb 19/10 entry.

Each F/A-18F TOFT consists of independent cockpits and visual display systems for both the pilot and weapons sensor officer. They use L-3 Link’s 360-degree SimuSphere visual display and SimuView image generator, along with Boeing’s advanced avionics simulations and simulated JHMCS helmet display. The second F/A-18F TOFT, which will include a new Australian visual system database, will be delivered with an additional mission briefing and debriefing system in late 2010. That 2nd delivery will be accompanied by a parallel upgrade to the current simulator. L-3 Communications LST.

July 5/10: 6 more. Another 6 F/A-18F Block II Super Hornets arrive at RAAF Base Amberley in Queensland, after a 4-day journey from Naval Air Station Lemoore in California. Omega Aerial Refueling provided assistance.

That makes 11 Super Hornets in Australia now, while the first Super Hornet delivered [A44-201], remains in the United States conducting advanced software development trials. A44-201 is expected to finish its trials this year, and arrive in Australia in December 2010. Australian DoD release | Image gallery.

June 25/10: Australia’s DoD announces that RAAF is planning to transit 6 more F/A-18F Super Hornets from NAS Lemoore in the USA to RAAF Amberley, in early July 2010. A detachment of RAAF aircrew and maintenance personnel from No 1 Squadron is currently conducting work-ups with the new aircraft at NAS Lemoore, CA, which includes up to 96 hours of test and evaluation flying and 2 weeks of Electronic Warfare flight trials.

“Another key task involves working with an air-to-air tanker conducting day and night refuelling flights to ensure we are ready for the flight to Australia.”

June 21/10: Aerial refueling. Omega Aerial Refueling Services, Inc. receives a $6.8 million modification to a previously awarded firm-fixed-price, indefinite-delivery/ indefinite-quantity contract (N00421-10-D-0009) to provide air-to-air refueling services in support of RAAF F/A-18s under the Foreign Military Sales Program. Omega already performs contracted aerial refueling work for the US government, and for Australia since 2008.

Work will be performed at Naval Air Station, Lemoore, CA (50%), and at the Royal Australian Air Force Base, Williamstown, Australia (50%), and is expected to be complete in February 2011. Contract funds will not expire at the end of the current fiscal year. US Naval Air Systems Command in Patuxent River, MD (N00421-10-D-0009).

March 22/10: Fly-in. Australia’s first F/A-18F Block II Super Hornets begin their flight to Australia. By March 26/10, the first 5 RAAF Super Hornets arrive at RAAF Amberley. Australian DoD image gallery | US NAVAIR | Boeing release.

Feb 23/10: 1st 2. Australia’s DoD informs us that F/A-18F Super Hornets A44-204 and A44-202 (see Sept 30/09 entry) were formally transferred to Australia’s DMO on this day, at NAS Lemoore.

Feb 19/10: Raytheon Australia wins an A$ 21.5 million Training Support Services Contract at RAAF Base Amberley. The firm will provide maintenance, logistics, and training services to support the Super Hornet flight simulators, visual environment maintenance trainers and electronic classrooms for Australia’s Super Hornets. Minister’s announcement | Raytheon Australia [PDF].

Feb 18/10: Formal transfer. The first Australian F/A-18F Super Hornet, aircraft #A44-203, is formally transferred from the USA’s Defense Contract Management Agency to Australia’s Defence Materiel Organisation, in a contract signing and ceremony at Naval Air Station Lemoore, CA, USA. Australian DoD gallery.

1st hand-over

2009

1st Australian F/A-18F unveiled; Pre-wiring for EA-18 upgrade gets OK; ALE-55 decoys; 3-year sustainment contract; Maintenance training can begin in Australia now.

ALE-55 concept
(click to view full)

Dec 16/09: Sustainment deal. Minister for Defence Personnel, Materiel and Science Greg Combet announces a Super Hornet Aircraft Sustainment Contract for Boeing, worth approximately A$ 20 million per year for 3 years, and provides for about 74 jobs at RAAF Base Amberley.

Under the contract, Boeing will provide engineering, supply chain management and maintenance services. The first 4 F/A-18Fs are scheduled to be at RAAF Base Amberley in March/April 2010, with the remaining 20 aircraft arriving through 2010-2011.

Dec 8/09: Trainers. Minister for Defence Personnel, Materiel and Science Greg Combet announces the introduction of a Visual Environment Maintenance Trainer to RAAF Base Amberley. This will allow RAAF Super Hornet maintenance training to move out of the United States and back to Australia, beginning in January 2010.

The VEMT system consists of a mock Super Hornet cockpit with touch screens that allows RAAF maintenance students to perform diagnostic and system functional checks, without actually being in a real aircraft. As is usual for such simulators, they can be monitored by an instructor who can bring up teaching points as the student works toward finding a fault, and can quickly be reprogrammed to simulate new faults.

Dec 1/09: Raytheon in Fort Wayne, IN receives a $12.7 million delivery order against a previously issued basic order agreement (N00019-05-G-0008) for 30 electronic modules. This contract for the RAAF F/A-18F aircraft will be performed in Fort Wayne, and is expected to be complete in August 2013. The US Naval Air Systems Command in Patuxent River, MD manages this contract.

Sept 30/09: 3rd delivered. Boeing delivers the 3rd RAAF F/A-18F Block II Super Hornet, 3 months ahead of schedule. Each of the 3 completed aircraft has now been delivered 3 months ahead of schedule, and the remaining 21 planes will be delivered through 2011. Note that “delivery” happens in the USA.Boeing release.

Sept 22/09: Raytheon in Goleta, CA received a $6.7 million firm-fixed-price contract to retrofit 603 integrated multi-platform launch controllers (IMPLCs) on F/A-18 aircraft for the US Navy (576 for $5.9 million, 89%) and the government of Australia (27 for $764,613, 11%). The IMPLC is the launch controller component of the AN/ALE-50 and AN/ALE-55.

Work will be performed in Goleta, CA (99%) and Fullerton, CA (1%), and is expected to be complete in April 2013. This contract was not competitively procured, pursuant to the FAR 6.302-1. The Naval Air Systems Command in Patuxent River, MD issued the contract (N00019-09-C-0036).

July 8/09: Unveiling. Boeing unveils the 1st complete RAAF F/A-18F Block II Super Hornet during a ceremony at Boeing Integrated Defense Systems’ production facilities in St. Louis, MO. The program is on budget to date, and the aircraft will be delivered later in July 2009, 3 months ahead of schedule. It is scheduled to arrive at RAAFB Amberley in March-April 2010.

The remaining 23 Super Hornets, each equipped with the Raytheon-built AN/APG-79 radar, will be delivered to the RAAF throughout 2010 and 2011. Australian DoD release | Australian DoD image gallery | Boeing release | US NAVAIR release.

July 1/09: Honeywell International, Inc., Defense and Space Electronic Systems in Albuquerque, N.M receives a $26.3 million modification to a previously awarded firm-fixed price contract (N00019-07-C-0014). It exercises an option for the full-rate production of 498 Advanced Multi-Purpose Displays (AMPD) for Lot 33 F/A-18F and EA-18G aircraft, and retrofit of Lot 26-28 F/A-18E/F and E/A-18G aircraft. Work will be performed in Albuquerque, NM and is expected to be complete in December 2010. The Naval Air Systems Command in Patuxent River, MD is managing the contract.

Customers include the US Navy (422 for $21.8 million, 82.8%) and the Government of Australia (76 for $4.5 million, 17.2%). Australia is ordering 30 of the 5″x5″ forward; 30 of the 5″x5″ aft; and 16 of the 8″x10″ AMPDs.

The U.S. Navy is ordering 167 of the 5″x5″ forward, 134 of the 5″x5″ aft, and 64 of the 8″x10″ AMPDs, along with 57 8″x10″ AMPD High Resolution Recorder Interface kits to upgrade legacy displays with higher-resolution capability. The USN’s Lot 26-28 F/A-18 Super Hornets are currently receiving a number of upgrades, including a swap-out of their mechanically-scanned AN/APG-73 radars for the more powerful and advanced AN/APG-79 AESA (Active Electronically Scanned Array) used in Australia’s F/A-18F Block IIs.

April 17/09: Decoys. The AN/ALE-55 (V) consists of an electronic frequency converter (EFC) and a fiber optic towed decoy. It works together with an aircraft’s onboard electronic warfare (EW) equipment, throughout the ECM cycle of Suppression (harder to acquire or track), Deception (active jamming techniques aimed at launchers); and Seduction (active jamming aimed at missile, and decoy target).

BAE Systems Information and Electronic Systems in Nashua, NH received a $33.7 million modification to a previously awarded firm-fixed-price contract (N00019-08-C-0044) for the Low Rate Initial Production Lot V of the Integrated Defensive Electronic Countermeasures (IDECM) AN/ALE-55 (V) Subsystems and associated technical support and non-recurring engineering for the U.S. Navy (70 EFCs, 251 decoys, $27.5 million, 81.57%) and Royal Australian Air Force (12 EFCs, 72 decoys, $6.2 million, 18.43%) F/A-18E/F Super Hornet aircraft.

Work will be performed in Nashua, NH (92%) and Mountain View, CA (8%), and is expected to be complete in August 2011. The US Naval Air Systems Command in Patuxent River, MD manages this contract. See also “ALE-55 Towed Fighter Decoys for US Navy, Australia.”

March 3/09: Engines. General Electric Aircraft Engines in Lynn, MA receives a $438.1 million modification to a firm-fixed-price contract, exercising an option for FY 2009 full rate production of 116 F414-GE-400 engines and 114 F414-GE-400 device kits. This contract combines purchases for the U.S. Navy (90 engines, 90 kits; $343.7M; 78.4%) and the Royal Australian Air Force (26 engines, 24 kits; $94.4M; 21.6%). Note that 26 engines covers only 13 planes, but see also Sept 8/08 entry, which makes 56 engines in total.

Work will be performed in Lynn, MA (50%); Madisonville, KY (22%); Hooksett, NH (13%); Albuquerque, NM (6%); Rutland, VT (5%); Dayton, OH (2%); Evandale, OH (1%); and Bromont, Quebec, Canada, (1%), and is expected to be complete in April 2011 (N00019-06-C-0088).

USN F/A-18F at
Minister’s press conference
(click to view full)

Feb 27/09: In an important procurement shift, Minister for Defence Joel Fitzgibbon announces that Australia is pre-wiring 12 of its planned 24 F/A-18F Super Hornets, in order to allow future conversions to EA-18 Lite electronic warfare aircraft. The additional cost for the pre-wiring on the production line is cited as A$ 35 million, out of a total order now cited as A$ 6.6 billion. Completing that fit out to “Growler Lite” status is expected to involve an additional A$ 300 million, with the go/no-go decision set for 2012.

Characteristically, the new Labor Party government’s release ends with a shot at the procurement policies of the previous Liberal Party government:

“If the Howard Government had taken a more prudent approach in making the Super Hornet decision rather than rushing to fill their impending air combat capability gap, they may have realised that this was a more effective approach to take.”

EA-18G pre-wired

Feb 27/09: Boeing subsidiary McDonnell Douglas Corp., in St. Louis, MO received a not to exceed $26.5 million (A$ 40.75 million at that day’s exchange rates) modification to a previously-awarded firm fixed price contract (N00019-04-C-0014) for “non-recurring engineering and recurring effort associated with Engineering Change Proposal 6359 in support of Australian F/A-18 aircraft.”

Work will be performed in St. Louis, MO (40%); El Segundo, CA (30%); Bethpage, NY (25%); and Mesa, AZ (5%) and is expected to be complete in August 2011. The Naval Air Systems Command in Patuxent River, MD manages this Foreign military Sale contract.

Feb 27/09: Raytheon Co., Electronic Warfare Operations in Goleta, CA received a $9.9 million cost plus fixed fee contract for products and engineering services in support of the AN/ALR-67v3 operational flight programs for US Navy F/A-18E/F Super Hornets ($5.4 million, 55%) and the F/A-18 A-D and E/F aircraft owned by the Governments of Canada ($1.5 million, 15%), Australia ($1.5 million, 15%), and Switzerland ($1.5 million, 15%). The estimated level of effort for this contract is 57,686 man-hours.

Work will be performed Goleta, CA (80%) and Point Mugu, CA (10%); and China Lake, CA (10%), and is expected to be complete in February 2011. Contract funds in the amount of $1.15 million will expire at the end of the current fiscal year. This contract was not competitively procured by the Naval Air Warfare Center Weapons Division in China Lake, CA (N68936-09-C-0029).

2008

Australia to keep the Super Hornet after review; Engines and ancillaries bought; ATFLIR pods bought; Support request.

F/A-18F over CV-63
(click to view full)

Dec 19/08: Raytheon Technical Services Co. LLC in Indianapolis, IN received a $26.2 million firm-fixed-price modification to a previously-issued basic order agreement. The order exercises an option for 65 LAU-115D/A Launchers and 140 LAU-116B/A launchers, split between the U.S. Navy (38 LAU-115, 126 LAU-116; $20.3 million, 80.3%) and the Royal Australian Air Force (27 LAU-115, 14 LAU-116; $5.2 million, 19.7%).

The LAU-115 is an underwing pylon for Hornet family fighters that can be fitted with LAU-7 launchers or LAU-127 launchers on the sides, in order to carry short range AIM-9/ASRAAM or AIM-120 AMRAAM air-to-air missiles. The LAU-116’s are the 2 ejection launchers placed in the Hornet family’s semi-recessed slots along the fuselage, under the engine intakes. They carry AIM-7 Sparrow and/or AIM-120 AMRAAM medium range air-to-air missiles.

Work will be performed in Indianapolis, IN, and is expected to be complete in April 2011. Contract funds in the amount of $5.2 million will expire at the end of the current fiscal year (N00019-05-G-0008).

Dec 19/08: General Dynamics Advanced Information Systems, Bloomington, Minn., is being awarded a $45.4 million modification to a previously awarded firm-fixed-price contract for full rate production of 195 Type 3 Advanced Mission Computers for the US Navy (166, $38.5 million, 85%) and Australia (29, $6.9% million, 15%). The computers will be installed in F/A-18E/F Super Hornet and E/A-18G Growler aircraft.

Work will be performed in Bloomington, MN and is expected to be completed in Dec. 2010. Contract funds in the amount of $1.2 million will expire at the end of the current fiscal year (N00019-07-C-0030).

Nov 6/08: Boeing in St. Louis, MO received a $14 million ceiling-priced delivery order against a previously issued Basic Ordering Agreement (N68335-06-G-0024) for 72 varieties of “peculiar support equipment items” for the RAAF’s F/A-18F fleet.

Work will be performed in St. Louis, MO and is expected to be complete in December 2009. Contract funds will not expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division in Lakehurst, NJ manages this contract.

Sept 24/08: Boeing in St. Louis, MO received an $8.8 million not-to-exceed modification to a previously awarded firm fixed price delivery order contract (N00383-06-D-001J) for in-service engineering and logistics services in support of the Royal Australian Air Force F/A-18F aircraft. In addition, this modification provides for the design, development, fabrication, qualification, and delivery of the Logistics Support Analysis Records (LSAR) and the Automated Maintenance Environment (AME) systems.

Work will be performed in St. Louis, MO (75%); Amberley, Australia (10%); Brisbane, Australia (10%); and Patuxent River, MD (5%), and is expected to be complete in September 2010.

Sept 19/08: ITT Industries Avionics Div. in Clifton, NJ received a $55.7 million modification to a previously awarded firm fixed price contract (N00019-05-C-0054), exercising an option for 32 AN/ALQ-214 On-Board Jammer Systems for F/A-18 E/F aircraft operated by the U.S. Navy (13, $22.6 million, 41%) and the Government of Australia, (19, $3.1 million, 59%).

Work is expected to be complete in December 2011. The US Naval Air Systems Command in Patuxent River, MD manages the contract.

Sept 8/08: General Electric Aircraft Engines Business Group in Lynn, MA received a $120.2 million modification to a previously awarded firm-fixed-price contract (N00019-06-C-0088) for the FY 2008 Full Rate Production of 30 F414 GE-400 jet engines, 24 device kits; and 19 various modules in support of the Royal Australian Air Force under the Foreign Military Sales Program.

Work will be performed in Lynn, MA (50%); Madisonville, KY (22%); Hooksett, NH (13%); Albuquerque, NM (6%); Rutland, VT (5%); Dayton, OH (2%); Evandale, OH (1%); and Bromont, Quebec, Canada, (1%), and is expected to be complete in January 2010. Note that Australia buys its engines under the same firm-fixed-price contract used by the US Navy. That’s an advantage offered to prospective sales by the US government, allowing them to leverage the pricing for America’s much larger orders.

Aug 1/08: The US Defense Security Cooperation Agency announces [PDF] Australia’s formal request for follow-on support for its pending F/A-18F Super Hornet purchase, as well as associated equipment and services. The total value, if all options are exercised, could be as high as $1.5 billion.

The exact request includes avionics software, engine component improvement and spare parts, technical ground support equipment, spare and repair parts, supply support, publications and technical data, engineering change proposals, personnel training and training equipment, U.S. Government and contractor technical and logistics personnel services, and other related elements of program support. It also adds:

  • Up to 4 AIM-9X Sidewinder Captive Air Training air-air missiles, which have seeker heads but no rocket motor
  • 10 of BAE’s AN/ALE-47 Electronic Warfare Countermeasure Systems
  • 8 of ITT’s AN/ALQ-214 Radio Frequency Countermeasure Systems
  • 10 of Raytheon’s AN/ALR-67v3 Electronic Warfare Countermeasure Receiving Sets.

The principal contractors will be: Boeing Company of St. Louis, MO (F/A-18F), Raytheon Missile Systems of Tucson, AZ (AIM-9X); Raytheon EW Systems of Goleta, CA (ALR-67), ITT EW Systems of Clifton, NJ (ALQ-214), and Symetrics Industries of Melbourne, FL. Implementation of this proposed sale will not require the assignment of any U.S. Government or contractor representatives to Australia.

Weapons & gear request

May 23/08: ATFLIR pods. Raytheon in El Segundo, CA received a $51.6 million modification to a previously awarded firm-fixed-price contract (N00019-06-C-0310) for 19 Full Rate Production Lot 6 Advanced Targeting Forward Looking Infrared (ATFLIR) pods. These ATFLIR pods will equip the Government of Australia (18, confirmed for the new F/A-18F Bock IIs, $35.6 million; 69%) and also buys 1 ATFLIR pod and long lead time items for the Government of Switzerland ($5.4 million; 10.6%), plus Units Under Test and one Electro-Optical Sensory Unit for the U.S. Navy ($10.5 million; 20.4%).

Work will be performed in El Segundo, CA (60%) and McKinney, TX (40%), and is expected to be complete in November 2010. The Naval Air Systems Command in Patuxent River, MD administers the contract.

Australia uses Northrop Grumman’s LITENING AT pods on its F/A-18A Hornets, but Raytheon’s ATFLIR is currently the only pod qualified with the Super Hornet. Faced with the choice of buying a different pod off the shelf, or paying the integration costs and having a common fleet resource, Australia apparently decided that buying off the shelf was the better decision.

May 20/08: Training. Boeing subsidiary McDonnell Douglas Corp. in St. Louis, MO received a $139 million ceiling-priced indefinite-delivery/ indefinite-quantity contract for F/A-18F aircrew and maintainer systems, computer-based training systems and support for the Royal Australian Air Force under the Foreign Military Sales Program. Initial requirements include: 2 Tactical Operation Flight Trainers, 2 Low Cost Trainers, 2 Integrated Virtual Environment Maintenance Trainers, and related courseware.

Work will be performed in St. Louis, MO and is expected to be complete in May 2014. This contract was not competitively procured by the Naval Air Warfare Center Training Systems Division in Orlando, FL (N61339-08-D-0006).

F/A-18F, refueling
(click to view full)

March 17/08: Australia to keep the Super Hornet. Australia’s new defence minister announces several decisions in the wake of Part A of Australia’s Air Combat Capability Review. One is that the decision to retire the F-111 by 2010 was made in haste, but is now irreversible. Another is that an air capability gap will exist due to the F-111s’ retirement, and the decision to pursue the F-35. Meanwhile, “No other suitable aircraft could be produced to meet the 2010 deadline the former Government had set.”

In interviews, the Minister cites data from classified briefings he has received when he vouches for the planes’ ability to handle any threats in the region. His release adds that:

“The analysis also highlighted additional capabilities such as specialist electronic warfare variants (the F/A-18G) [sic – it’s the EA-18G] that will be considered as part of the Super Hornet acquisition. These additional capabilities will be more fully considered under the second stage of the Air Combat Capability Review.”

Sources: Australian DoD | Opposition Liberal Party release | ABC news [with video of the announcement and an interview] | The Age | News Australia | Sydney Morning Herald | Aviation Week | Defense News | Flight International.

F/A-18Fs survive

Feb 27/08: A report in Australia’s The Age newspaper cites Dr Stephen Gumley, the head of Australia’s Defence Materiel Organisation, as saying that “it would cost about $400 million to cancel the [F/A-18F] contract with penalties accruing at the rate of $80-100 million a month.”

Feb 27/08: The Australian Liberal Party, now the loyal opposition in Parliament, vigorously disputes a Labor Party argument that the government paid too much under the contract. Liberal Party release:

“The fact is Australia will pay the best possible price for the Super Hornet. In Senate Estimates, 20 February 2008, Dr Stephen Gumley CEO, Defence Materiel Organisation said “We get the same unit prices as the US government. I know no way of getting better prices than the US government, particularly in the home market; therefore I am confident that the price we are paying for the aircraft is as good as Australia is going to get.”

This is true. Of course, if one believes the Super Hornet is the wrong aircraft; $1 is too much. The Liberal Party alludes to this in their Feb 26/08 release, which states that: “Labor set up an Air Capability Review presumably as a pretext to scrap the Super Hornet contract.”

Feb 26/08: In an Australia Broadcasting Corporation interview, Defence Minister Joel Fitzgibbon offers an outwardly confusing statement re: the F/A-18F purchase, which he has opposed to date. The key is to strip away the statements re: ‘want’, since a politician can always say that circumstances force something unwanted. Note, instead, what they say they will do, and under what conditions. Full quote, as reported by news.com.au:

“I will follow the advice of the experts who are doing the capability review. If they come to the conclusion or recommend that the Super Hornet isn’t up to the job, I will have no hesitation in cancelling it… I’m really hoping that the air combat review recommends that we retain the Super Hornet. It’s a pretty rude, if you like, thing for us to do now to move in and cancel the project and I’ll be very, very happy if we don’t have to.”

Feb 18/08: Australia’s new government formally announces its Air Combat Capability Review. Extension of the F-111s’ lives, re-evaluation the F-35 and F-18F buys, and the desirability of the F-22 Raptor will be discussed in light of regional air power trends to 2045.

Feb 11/08: Smiths Aerospace Mechanical Systems – Santa Ana, Inc. in Santa Ana, CA received a $13.6 million modification to a previously awarded firm-fixed-price contract (N00421-00-C-0433), for a total of 420 of its 480-gallon external fuel tanks. The firm will deliver 210 tanks to the US Navy ($7.8 million; 57%), and another 210 to Australia under the Foreign Military Sales Program ($5.8 million, 43%), for use on their F/A-18E/F Super Hornet aircraft. The Naval Air Warfare Center Aircraft Division in Patuxent River, MD issued the contract.

Feb 5/08: Despite the new Australian government’s review of their Super Hornet purchase, GKN Aerospace-Monitor begins machining the first wing bulkhead for a RAAF Super Hornet, one of 3 titanium bulkheads that hold the F/A-18 wings in place.

The wing bulkheads will be shipped to Northrop Grumman’s production facility in El Segundo, CA, where the company produces the F/A-18E/F’s center/aft fuselage section and twin vertical tails and integrates all associated subsystems. Northrop Grumman is Boeing’s main sub-contractor for the F/A-18 Super Hornet program, and expects to begin assembling the first Super Hornet fuselage shipset for Australia in late March 2008. Northrop Grumman release.

2007 and earlier

Initial DSCA request and contract; Australian DoD was surprised by the deal; Change of government; Cancellation rumored; Weapons requested.

SU-30: overmatch?
(click to view full)

Dec 31/07: The Sydney Morning Herald: “Axe set to fall on Nelson’s fighters.” Maybe – despite the likely $300 million price tag of canceling the Super Hornet buy:

“The Herald understands that Department of Defence planners have been asked to present an analysis on all the fighter jet options to the Federal Government and how they stack up against likely adversaries, the first time such a study has been done for at least five years. All projects in the $30 billion program will be scrutinized “with fresh eyes”. That includes what aircraft are to be bought, how many, when and at what price. “Absolutely everything is on the table,” a Government source said.”

Dec 3/07: Change of government. In the aftermath of the Nov 24/07 election, John Howard’s Liberal Party coalition loses its majority in Parliament, and Labor gains one. In a Parliamentary system, this means that Labor Party leader Kevin Rudd automatically becomes Prime Minister, and the Labor party forms a majority government – albeit one that can have legislation blocked by the Liberal Party majority in the Upper House: ABC summary results. Some counting is still ongoing in certain ridings, but the overall margin (80-86 seats, 76 required for a majority) means that Rudd is sworn in as Prime Minister on Dec 3/07. Former defence minister Dr. Brendan Nelson is now serving as leader of Howard’s center-right Liberal Party, in the wake of ex-Prime Minister Howard’s resignation as party leader.

Oct 4/07: The US DSCA announces Australia’s formal request for weapons and equipment to be integrated on its 24 F/A-18F Super Hornet aircraft, as well as associated equipment and services. The total value, if all options are exercised, could be as high as $617 million. The announcement was revised on Oct 11/07 to correct inaccuracies.

The principal contractors will be Boeing in St. Louis, MO (JHMCS, overall F/A-18F integrator); Raytheon Missiles Systems in Tucson, AZ (AIM-9X, AGM-154, ATFLIR); and General Electric Aircraft Engines in Lynn, MA (support?). Implementation of this sale will require approximately 8 contractor representatives to provide technical and logistics support in Australia for 2 years. U.S. Government and contractor representatives will also participate in program management and technical reviews for 1-week intervals twice annually. Specific items requested include:

Weapons & gear request

F/A-18F, incoming…
(click to view full)

Sept 26/07: F/A-18F initial order. Boeing subsidiary McDonnell Douglas Corp. received a USD $1.32 billion not-to-exceed modification to a previously awarded firm-fixed-price contract (N00019-04-C-0014) for 24 F/A-18Fs and Alternate Mission Equipment (AME) for the Government of Australia, under the Foreign Military Sales Program.

Work will be performed in St. Louis, Mo. (28.7%); El Segundo, Calif. (25%); Goleta, Calif. (8.6%); Clearwater, Fla. (2.3%); Greenlawn, N.Y. (2.1%); Burnsville, Minn. (2.1%); Johnson City, N.Y. (2.1%); Brooklyn Heights, Ohio (2%); Vandalia, Ohio (2%); Grand Rapids, Mich. (2%); South Bend, Ind. (2%); Mesa, Ariz. (1.8%); Fort Worth, Texas (1.8%); and at various locations across the United States (17.5%), and is expected to be complete in July 2011. The Naval Air Systems Command, Patuxent River, Md., is the official contracting agency.

Aug 9/07: Just how surprised was Australia’s DoD? Australian Senator John Faulkner rises to make a speech that highlights the minister – department relationship, and the decision process behind Australia’s Super Hornet purchase. He says [full speech, MS Word]:

“Evidence provided during Senate Estimates Hearings in February this year confirmed that there had been no specific Defence recommendation to the Minister on the Super Hornets – so without doubt, both the CDF and the then Secretary to the Department of Defence Mr Rick Smith, must have been stunned at the Minister’s actions at that NSC meeting.

There is much we do not know about what happened at that strange meeting, but it was clearly a remarkable – possibly unique – occasion. The NSC decided to buy a new fighter without advice from Defence or the RAAF. I have been told by very reliable sources that neither the Secretary nor CDF even knew the issue was on the agenda, let alone what their Minister was going to propose…”

July 11/07: Raytheon Electronics Systems in Goleta, CA received a $24.4 million modification to a previously awarded firm-fixed-price contract (N00019-04-C-0123), exercising an option for 24 Full-Rate Production Lot 10 AN/ALR-67(V)3 Radar Warning Receiver (RWR) systems for the Royal Australian Air Force under the Foreign Military Sales Program. Raytheon’s Aug 2/07 release confirms that the order is for Australia’s F/A-18F Super Hornets.

Work will be performed in El Segundo, Calif. (27%); Goleta, CA (23%); Lansdale, PA (23%); Forest, MS (21%); Portland, OR (3%), and McKinney, TX (3%), and is expected to be complete in September 2010. Contract funds will not expire at the end of the current fiscal year. The Naval Air Systems Command in Patuxent River, MD issued the contract.

F/A-18F: launch!
(click to view full)

May 5/07: Australia’s DoD announces the signing of its 1st contract for the new F/A-18F Block II Super Hornet fleet, valued at approximately A$ 2.9 billion (currently about US$ 2.39 billion), for 24 aircraft and associated support systems. Additional contracts will be established later in 2007 for weapons acquisition and sustainment.

The aircraft will be based at RAAF Amberley, which currently houses Australia’s long-range strike fleet of F-111 fighter/bombers. The government will be focusing on local Industry participation as part of the through life support concept, in order to maintain the extensive support infrastructure that has grown up around the F-11 fleet. Australian personnel are scheduled begin Super Hornet training in the United States in 2009, and the current government plans to retire its F-111s in 2010 instead of 2020 as originally forecast.

F/A-18F initial contract

March 6/07: Defence Minister Nelson officially announces the F/A-18F Block II purchase in his release: “$6 Billion to Maintain Australia’s Regional Air Superiority.” A$ 6 billion is the estimated total cost for purchase, training, and maintenance over 10 years.

The Australian Super Hornet program plans to use local contractor owned and operated intermediate maintenance and training for aircrew and support personnel. Additionally, the supply chain infrastructure, warehousing and operation will be manned locally in support of both Australian and US Navy Super Hornets in the region.

Note, however, that the Minister’s quoted Aviation Week reference to the aircraft’s 5th generation capability “similar to that of the F-22A Raptor…” refers to the Super Hornet Block II’s APG-79 radar, which is an AESA radar like the F-22A’s larger, more powerful, frequency-agile APG-77. It does not refer to the entire aircraft, as the selective excerpt might lead one to believe.

Feb 6/07: Australia has submitted a formal request. The US DSCA has announced the $3.1 billion request and its details. In addition to the 24 F-18Fs, Australia has requested:

  • 48 installed and 6 spare F414 engines
  • 24 AN/APG-79 AESA radar systems
  • 24 AN/USQ-140 Multifunctional Informational Distribution System Low Volume Terminals (MIDS-LVT Link 16)
  • 30 AN/ALR-67(V)3 Electric Warfare Countermeasures Receiving Sets, the same kind that will also equip Australia’s other Hornets after the ALR 2002 project’s failure.
  • Integration of the AN/ALE-47 Electronic Warfare Countermeasures Systems
  • 145 LAU-127 Guided Missile Launchers. These wingtip launchers allow the plane to launch AIM-9 Sidewinders or medium-range AIM-120 AMRAAM air-air missiles.
  • 30 AN/PVS-9 night vision goggles
  • 12 Joint Mission Planning Systems
  • AN/ALE-55 Fiber Optic Towed Decoys
  • System integration and testing, software development/integration, test sets and support equipment, spare and repair parts, maintenance and pilot training, software support, publications and technical documents.

Australia falls under the same provisions as NATO for Foreign military Sales announcements, in that it only takes 15 days for DSCA requests to be considered approved, as long as Congress doesn’t specifically block it. Negotiations regarding the next step, a contract, can then begin.

F/A-18F request

Dec 20/06: The Australian reports that:

“Defence Minister Brendan Nelson intends to ram through a $3 billion purchase of 24 F/A-18F Super Hornet aircraft, amid concerns Australia may lack a fully deployable air combat capability early next decade… His swift action came as a surprise to senior defence officials on Russell Hill. The decision to buy an expensive interim fighter will generate a major rethink of the 2006-16 defence capability plan…”

Appendix A: RAAF Super Hornet Controversies

RAAF F-111, smokin’
(click to view full)

Liberal Party defense minister Dr. Nelson reportedly decided to opt for the Super Hornet without a detailed study of alternative aircraft types, such as the longer-range F-15E Strike Eagle, advanced air superiority options like the Eurofighter Typhoon, or even an export version of the USA’s F-22 Raptor. Despite its name, the Super Hornet is a larger aircraft that offers only 25-30% commonality with the Australian air force’s existing F/A-18A/B Hornets. What is does share, is the same support structure.

Justifications advanced for this buy include service as a gap-filler to the F-35A Lightning II Joint Strike Fighter after the F-111’s retirement in 2010, and also the ability to boost aircraft numbers while existing F/A-18A Hornets rotate through year-long center section replacements, designed to lengthen their service fatigue life. The Super Hornet buy had significant impacts on the 2006-2016 Defence Capability Plan, and reportedly cut the number of F/A-18A Hornets undergoing the A$ 1+ billion HUG mid-life upgrade program to 42. It may also result in cuts to other programs, unless additional funding is provided to cover the interim fighter purchase.

RAAF F/A-18B Hornet
(click to view full)

For a detailed account of the Super Hornet’s origins and its specific differences vs. the earlier model F/A-18 A-D Hornets, plus an in-depth first-person flight report, see “Flying the F/A-18F Super Hornet,” originally published in the May/June, 2001 issue of Australian Aviation.

Whether these attributes will be enough to deal with present and future SU-30 family aircraft on even terms remains a matter of controversy.

For a more detailed account of the ongoing controversy around Australia’s F-35 Lightning II/ F/A-18F Block II purchases, as well as links that shed more light on the F-111 program at RAAF Amberley, see DID’s Spotlight article “The Australian Debate: Abandon F-35, Buy F-22s?, especially the updates and readings sections which include Super Hornet related news. See also DID’s follow-up: “Australian Air Power Controversy: F-35 and Super Hornets Under Fire,” which has been updated to reflect subsequent DoD speeches and defenses of their purchase, as well as follow-ups by those who believe that the F/A-18F is the wrong aircraft for Australia.

Those controversies may be of historical interest, but the issue has become moot. Large signed contracts turned the buy into a fait accompli. After a review of the aircraft and the likely costs of canceling the contract, the new Labor Party government decided to continue with the buy. The last plane from that order arrived in October 2011.

Additional Readings Background: Super Hornet

Official Reports

News & Views

Catégories: Defence`s Feeds

ULA Receives $269M Contract Mod for Delta IV | EU & UN Train Somaliland Coastguard | Rheinmetall and Day & Zimmerman Form Joint Venture RDZS

mer, 07/12/2016 - 00:58
Americas

  • President-elect Donald Trump has urged for the cancellation of the new Air Force One. Believing that manufacturer Boeing “is trying to do a little number,” Trump took to Twitter saying “Boeing is building a brand new 747 Air Force One for future presidents, but costs are out of control, more than $4 billion. Cancel order!” In 2015, the USAF announced plans to acquire Boeing’s 747-8 to replace the two current Air Force planes used to transport the US president. $1.65 billion has been earmarked for the purchase, although exact figures have yet to be released.

  • United Launch Alliance has received a $269 million contract modification to execute production services for the Delta IV Heavy launch vehicle. The deal will see the joint venture between Boeing and Lockheed Martin support launch vehicle configuration for the USAF. Satellites launched with the vehicles are used to support a variety of missions, including national security, telecommunications, and interplanetary exploration.

  • The Pentagon’s chief arms buyer, Frank Kendell, is hopeful that a three-year block buy of the F-35 Joint Strike Fighter will go ahead. Covering some 400 F-35 units for both the US military branches and partner nations, the agreement is expected to generate large savings through bigger economies of scale between the fiscal years 2018 through 2020. Negotiations with lead contractor Lockheed Martin, however, have been slow as seen in the year-long negotiations of the fighter’s ninth batch, while the government’s chief weapons tester, Michael Gilmore, has long argued about the need to test the planes before buying and building larger quantities.

Middle East & North Africa

  • Officials from the EU and supported by the UN, have carried out maritime security training with the Somaliland Coastguard. European Union Naval Force (EU NAVFOR) sailors, supported by staff from EUCAP Nestor, carried out radar training on board the Spanish offshore patrol vessel, ESPS Relampago, in Berbera Bay, as a precursor to an engagement the following day on board EU NAVFOR flagship, HNLMS Tromp. On the following day, EUCAP Nestor’s Head of Operations, Chris Reynolds, EU NAVFOR Force Commander, Commodore Rene Luyckx, and representatives from UNSOM’s Rule of Law and Security Institutions Group, hosted Somaliland representatives on board HNLMS Tromp alongside Berbera Port for the Joint Maritime Security Seminar (JMSS). The JMSS follows a series of engagements conducted in recent months by EU NAVFOR and EUCAP NESTOR in Mogadishu and Bosasso, where maritime security and the strengthening of Somali maritime capacities were discussed.

Europe

  • Mid-life upgrades of Finnish F/A-18 fighters will see the inclusion of the Multifunctional Information Distribution System Joint Tactical Radio System (MIDS-JTRS), following approval by the US State Department. 90 units of MIDS-JTRS will be sold to Helsinki at a cost of $156 million. MIDS-JTRS is the communication component of the Link 16 military technical data exchange network, used by the US, NATO, and approved partner nations.

  • A joint-venture is to be established between the German manufacturer Rheinmetall and the Philadelphia-based family-owned enterprise Day & Zimmerman. The focus of the joint venture is the production of medium-caliber ammunition for the US market and will include the 25mm ammo used by the F-35 Joint Strike Fighter. The new firm will be known as Rheinmetall, Day & Zimmermann Solutions, or RDZS.

Asia Pacific

  • Vietnamese Su-30 pilots will be trained by India. While the cost of the training is yet to be finalized, the numbers and scope of the program is expected to be resolved quickly after both governments’s defense ministers reached a provisional agreement during bilateral discussions on Monday. Indian sailors have already trained their Vietnamese counterparts in operating the Kilo-class submarines.

Today’s Video

The world’s largest rocket. June launch of a Delta IV Heavy:

Catégories: Defence`s Feeds

Sikorsky Gets $93.8M for Work on H-60 Variants | Gen Atom Contracted by UK Gov for New UAVs | India Policy Change to Allow Private Co to Supply Ammo

mar, 06/12/2016 - 00:58
Americas

  • Sikorsky has been tapped to provide technical and logistics services for variants of the H-60 helicopter operated by the US Army. Valued at $93.8 million, work carried out by the company includes the provision of engineering services in addition to other weapon system supplies. Helicopters included in the deal include the UH-60 Black Hawk.

  • John Richardson, the US Navy’s Chief of Naval Operations Admiral, has spoken of American shipyards capabilities to boost warship production, as hopes of more orders soar under a Trump presidency. Promises to expand the target vessels from 308 to 350 would be incredibly easy if funding is made available to fit the bill, said Richardson, speaking in an interview at the annual Reagan National Defense Forum in southern California. Navy officials were still calculating how much it would cost to expand the Navy to 350 ships from around 290 now, but it would depend on the mix of ships and related costs.

  • As part of efforts to upgrade USMC radar capabilities, Saab has received an $18.6 million contract to provide supporting AN/TPS-80 Ground/Air Task Oriented Radar components. The contract was awarded by lead contractor Northrop Grumman, work will include major subsystem delivery and assembly in addition to software for the next 9 low-rate initial production units. Saab delivered the first six systems for the program in previous contracts. Its next deliveries are expected to begin in 2018.

Africa

  • The first batch of four Super Mushshak trainers have been delivered to Nigeria. Delivery comes six weeks after the Pakistan Aeronautical Complex (PAC) signed a deal with the Nigerian Air Force to supply 10 new Super Mushshaks, eight of which will be loaned on an interim basis until the new trainers are exported. The next four will arrive by the second quarter of 2017, while the new models will be delivered later that summer.

  • Kenya has taken ownership of six of an eventual eight Bell Huey II helicopters, following delivery by the US government. Washington had contracted Bell $52.1 million back in September for a five helicopter foreign military sale to Kenya, however this has now been extended. The final two will arrive in May 2017 and will go toward helping Kenyan forces tackle militants associated with the Somali jihadist group, al-Shabaab.

Europe

  • Contracts have been signed between General Atomics and the UK government to develop new UAVs. The company will equip existing drone technology into new remotely piloted aircraft for the RAF, in a deal worth $127 million. 20 Protector UAVs will be developed under the program and will replace the current fleet of 10 MQ-9 Reapers.

  • The Netherlands will participate alongside Norway in the development of the F-35’s brake chute. Dutch participation in the work comes as it agreed to pay $11.4 million to Oslo as part of a cost-share and will allow the Norwegian government to redirect those funds to other areas of its F-35 program. The incorporation of drag chutes on Norwegian and Dutch F-35s will help the aircraft land on icy runways.

Asia Pacific

  • Private companies in India will be allowed to produce and supply ammunition as part of a rule change by New Delhi to fill demand and improve quality control. Until now, the state-owned Ordnance Factory Board (OFB) was permitted to produce ammunition, with private firms limited to providing fuses and shells. The rule change has been followed by a request for information (RFI) for a $400 million program to supply a wide variety of ammunition in the next five to eight years, and has attracted the interest of several large and small-medium local firms participating. Foreign companies may also be able to get in on the game with the potential for joint ventures with Indian companies, offering established designs from abroad, licensing and manufacturing ammunition in India.

Today’s Video

S-300 misfire:

Catégories: Defence`s Feeds

Sikorsky’s $8.5-11.7B “Multi-Year 8” H-60 Helicopter Contract

mar, 06/12/2016 - 00:50
US Army HH-60Ms
(click to view full)

In July 2012, the US military signed another huge contract with Sikorsky. With production of the Army’s HH/UH-60M, and the Navy’s MH-60S and MH-60R helicopters, all in full swing, there’s no question about the need for future orders. In that environment, multi-year contracts allow efficiencies in purchasing, and security of staffing, throughout Sikorsky’s supply chain. These new helicopter types are also available to Foreign Military Sales class customers, under the American contract’s advantageous pricing and terms. The UH-60M, MH-60S and MH-60R models have already inked export deals, and official requests indicate that more deals are in the pipeline.

The new multi-year 2013-2017 contract could be worth up to $11.7 billion, and follows a 5-year, multi-service “MYP-VII” contract in December 2007. Like its predecessor, it covers UH-60M Black Hawk troop transport and light cargo helicopters, Army HH-60M SAR (Search And Rescue) / MEDEVAC (MEDical EVACuation) helicopters, and the US Navy’s MH-60S and MH-60R Seahawk helicopters.

MYP-VIII: Contract in Context USN Heli Plan
(click to view full)

The US Army plans to order 956 UH-60M and 419 MEDEVAC HH-60M Black Hawks through 2026, a total of 1,375 H-60M models. By then, the US Army’s total H-60 Black Hawk fleet, including upgraded UH-60As and UH-60Ls, is expected to reach more than 2,100 helicopters. US Navy production will end much sooner, and beyond about 2018 the only Seahawks built will be for export.

MYP-VIII’s base award covers 653 helicopters from FY 2013 – 2017: 234 UH-60M and 120 HH-60M Black Hawks, 193 MH-60R/S Seahawks, plus 106 helicopters for Foreign Military Sales. Like its predecessor, The 5-year agreement also allows the Army and Navy to order as many as 263 more helicopters within the same contractual terms, either for the USA or for export sales. If exercised, the optional purchases could push the contract value from $8.5 billion to a maximum of $11.7 billion.

Note that this MYP-VIII contract is a price framework agreement, rather than a firm schedule. Orders are planned 5 years in advance at the Pentagon, but annual budgets can and do increase or decrease those numbers. Actual production orders will be determined year-by-year over the life of the program, based on American budgets and foreign orders. Under the terms of the contract, Sikorsky will provide helicopters, technical publications, and changes/upgrades within set terms, while its field service representatives provide technical guidance and on-site training.

The need for replacement is certainly clear. According to FY 2011 budget documents, the USA’s oldest UH-60As are now over 30 years old, and the average age of the UH-60A fleet is 23 years. New UH-60Ms have an 18 month lead time from order to delivery, while the more advanced HH-60M for SAR/ MEDEVAC duties has a 24 month lead time.

In the Navy, the helicopters being replaced by the MH-60S armed utility & mine-warfare helicopter, and by the MH-60R strike and anti-submarine helicopter, date from the Reagan years – or earlier. The MH-60S/Rs are replacing the US Navy’s remaining SH-60B/F Seahawks, HH-60 CSAR(Combat Search and Rescue), CH-46D Sea Knights, and HH-1N Huey SAR helicopters.

The minimum production rate to sustain the H-60 line is 18 helicopters per year, while the maximum is listed in FY 2011 US Army budget documents as 150 per year. American orders are large but don’t push that limit, leaving plenty of room for export production.

Contracts & Key Events UH-60M
(click to view full)

Unless otherwise specified, all order are placed by US Army Contracting Command in Redstone Arsenal, AL to Sikorsky in Stratford, CT.

Note that a contract for helicopters is not the same thing as a contract for flying, ready-to use helicopters. Many contracts omit key “Government Furnished Equipment” items like engines, sensors, etc., which make the cost of a ready-to-use helicopter higher than the base contract. Sikorsky does sometimes buy items that are usually GFE when filling some Foreign Military Sales contracts. There are still some questions about FMS inclusions within MYP-VIII, and some buys whose structure is unclear. Australia’s Letter of Offer and Acceptance for the MH-60R, for instance, was signed in June 2011, and some contracts have begun. DID will attempt to resolve those questions and details going forward.

Finally, the naval MH-60R strike and MH-60S Seahawk utility/ specialty helicopters have a large array of unique features, and a central place within the USN. We will cover purchases under MYP-8 here, but full details regarding the helicopters, their foreign sakes opportunities, and all of their related contracts can be found in “MH-60R/S: The USA’s New Naval Workhorse Helicopters.”

FY 2015 – 2017

Orders: US Army, US Navy.

December 6/16: Sikorsky has been tapped to provide technical and logistics services for variants of the H-60 helicopter operated by the US Army. Valued at $93.8 million, work carried out by the company includes the provision of engineering services in addition to other weapon system supplies. Helicopters included in the deal include the UH-60 Black Hawk.

March 18/15: Mexico. The DSCA notified Congress of the potential sale of three Sikorsky UH-60M Black Hawks to Mexico, in a deal potentially worth $110 million. That there are only three Black Hawks in the deal is surprising, as the application appears to have gone in with five requested.

March 18/15: Slovakia. Slovakia is also poised to receive nine of the same model.

March 18/15: Tunisia. Sikorsky saw a $93.3 million contract modification today for eight “Green” UH-60M helicopters for the Tunisian government.

Dec 15/14: Mexico. $56.4 million modification (P00217) to contract W58RGZ-12-C-0008 to exercise an option for 5 UH-60M aircraft for Mexican Navy’s foreign military sales case MX-B-UEU. Estimated completion date is May 30, 2016. Work will be performed in Stratford, Connecticut. Fiscal 2010 funds in the amount of $2,221,115 were obligated at the time of the award.

HH-60M
(click to view full)

Nov 17/14: FY 2015 USA. The US military buys 102 helicopters for the Army and Navy for $1.302 billion, as its FY 2015 purchases.

A $772 million contract modification buys 41 UH-60M helicopters and 24 HH-60M helicopters, plus associated support functions. All funds are committed immediately, using FY 2015 Army aircraft budgets. Work will be performed in Stratford, CT, and is expected to complete in June 30/15 (W58RGZ-12-C-0008, PO 0201).

At the same time, a $535.3 million contract modification funds 29 MH-60R and 8 MH-60S helicopters for the Navy, plus associated sustaining engineering, program management, systems engineering, provisioning, technical publications, other integrated logistics support. There’s also advance procurement funding for program years 4 and 5. All funds are committed immediately, using FY 2015 Navy aircraft budgets. Work will be performed at Stratford, CT (W58RGZ-12-C-0008, PO 0202).

FY 2015 USA: 41 UH-60M, 24 HH-60M, 29 MH-60R, 8 MH-60S

FY 2014

Orders: US Army, Mexico, Saudi Arabia; Requests: Austria, Brazil, Mexico, Tunisia; Unmanned UH-60MU tested; US Navy wants to cancel MH-60R buy without destroying MYP-8 – can they? UH-60M, Ft. Bragg

Sept 29/14: Mexico. An unfinalized $93.2 million not-to-exceed, undefinitized contract for 8 “uniquely configured” UH-60Ms and other support equipment and services for Mexico’s secretary of national defense. Mexico has now ordered 35 UH-60Ms, with confirmed customers in the Federal Police, Navy, & Air Force. This order didn’t mention the purchasing service, nor did the recent DSCA request (q.v. June 24/14).

Work will be performed in Stratford, CT, with an estimated completion date of June 7, 2015; this contract falls under the Foreign Military Sales program. One bid was solicited and one received. Fiscal 2010 other procurement funds are being obligated at the time of the award. With all modifications, the cumulative total of this contract is $7,035,259,311. Army Contracting Command, Redstone Arsenal (Aviation), Redstone Arsenal, AL manages the contract (W58RGZ-12-C-0008, PO 0171).

Mexico: 8 UH-60Ms

Sept 15/14: Mexico. Sikorsky receives a $203.6 million firm-fixed-price contract modification for 18 “green” UH-60M Blackhawk helicopters, plus their conversion to the Mexican Air Force’s designated configuration using contractor-furnished and government-furnished (and paid for) equipment. In other words, this is the entire FAM order mentioned in the April 21/14 DSCA request.

Estimated completion date is May 30/16 (W58RGZ-12-C-0008, PO 00179).

Mexico FAM: 18 UH-60Ms

Sept 9/14: Brazil. The US DSCA formally announces Brazil’s export request for 3 UH-60M Black Hawk helicopters, equipped for search and rescue. Brazil already has the Army 4th squadron and Air Force 7/8 “Harpia” air group at Manaus, whose H-60L and S-70 Black Hawks/ Pave Hawks perform a SAR/ counter-narcotics role, and are well-equipped for disaster response. These would be Brazil’s first UH-60Ms.

The full request involves 3 UH-60Ms, 8 T-700-GE-701C engines (6 installed and 2 spares), 12 M-134D 7.62mm gatling guns, 8 H765GU Embedded Global Positioning System/Inertial Navigation Systems, spare and repair parts, tools and support equipment, publications and technical data, personnel training and training equipment, and other US government and contractor support. The estimated cost is up to $145 million.

The principal contractors will be United Technologies’ Sikorsky Aircraft in Stratford, CT; GE Engines in Lynn, MA; and Dillon Aero Systems in Mesa, AZ. Implementation of this proposed sale may require the assignment of 1 contractor representative to Brazil for up to 3 years to support fielding, maintenance, and personnel training of this new helicopter type for Brazil. Sources: DSCA #14-36, “Brazil – UH-60M Black Hawk Helicopters”.

DSCA request: Brazil (3)

June 24/14: Mexico. The US DSCA formally announces Mexico’s export request for 5 UH-60M Black Hawk Helicopters in standard US government configuration with designated unique equipment and Government Furnished Equipment (GFE), 13 T700-GE-701D Engines (10 installed and 3 spares), 12 Embedded Global Positioning Systems/Inertial Navigation Systems (10 installed and 2 spares), 10 M134 7.62mm gatling guns, 5 Star SAFIRE III day/night surveillance turrets, Identification Friend or Foe (IFF) systems, AN/ARC-210 RT-8100 series radios, 1 Aviation Mission Planning System, and 1 Aviation Ground Power Unit. Also included are aircraft warranty, air worthiness support, facility construction, spare and repair parts, support equipment, publications and technical documentation, personnel training and training equipment, site surveys, tool and test equipment, and other forms of US Government and contractor technical and logistics support. The estimated cost is up to $225 million.

Mexico has previously ordered 9 UH-60Ms, with 6 going to Mexico’s federal police, and 3 to the Armada for use in land-based operations. These 5 would bring the Mexican Navy’s fleet to 8:

“Mexico intends to use these defense articles and services to modernize its armed forces and expand its existing naval/maritime support in its efforts to combat drug trafficking organizations.”

The principal contractors will be Sikorsky Aircraft Company in Stratford, CT; and General Electric Aircraft Company (GEAC) in Lynn, MA. Implementation of this proposed sale may require the assignment of 3 more US Government and 5 more contractor representatives in country, as full-time delivery and training support for approximately 2 years. Sources: DSCA #14-25, “Mexico – UH-60M Black Hawk Helicopters”.

DSCA request: Mexico (5)

Aug 19/14: UH-60M. Sikorsky in Stratford, CT receives a $30.3 million contract modification for 12 UH-60M Black Hawk helicopters, on behalf of the Saudi Arabian National Guard. All funds are committed immediately. This appears to be an initial award, with a follow-on to come that will finalize the buy, modify the helicopters for Saudi use (q.v. March 25/13, Dec 20/13), and bring total announced SANG UH-60M sales to 24 of 72 requested (US DSCA, Oct 20/10) machines.

The estimated completion date is Aug 31/17. Work will be performed in Jupiter, FL and Stratford, CT. US Army Contracting Command in Redstone Arsenal, AL manages the order on behalf of its Saudi client (W58RGZ-12-C-0008, PO 0072).

July 24/14: Tunisia. The US DSCA announces Tunisia’s official request for 12 UH-60M Black Hawk utility helicopters, complete with Battlehawk kits that allow them to be used as attack helicopters. these helicopters will include surveillance turrets with laser designators, laser-guided 70mm rocket capability, Hellfire missiles, various defensive and communications systems, and associated support that may include an infrastructure build-out. The estimated cost is up to $700 million, or about $58.3 million per helicopter with weapons and support. Sources: DID, “Armed & Versatile: Sikorsky’s ‘Battlehawk’ Helicopters” for full coverage | US DSCA #14-23, “Tunisia – UH-60M Black Hawk Helicopters”.

DSCA request: Tunisia (12 + Battlehawk kits)

May 20/14: +13. Sikorsky Aircraft Corp. in Stratford, CT receives a $143.4 million contract modification for 13 Army UH-60M Black Hawk helicopters.

All funds are committed immediately, using FY 2014 “other procurement” budgets. Work will be performed in Stratford, CT with an estimated completion date of Sept 30/15 (W58RGZ-12-C-0008, PO 0146).

13 UH-60M

May 29/14: A $24 million contract modification to “realign the funding between the fiscal 2014 advance procurement funds and the planned aircraft production funds for fiscal 2015, with no change to the UH-60 or HH-60 contract price.” All funds are committed immediately.

Work will be performed in Stratford, with an estimated completion date of Dec 31/15. Army Contracting Command, Redstone Arsenal, AL manages the contract (W58RGZ-12-C-0008, PO 0163).

April 22/14: MYP-8. Lockheed Martin ups the pressure on the US Navy, by reminding everyone that they also have a multi-year contract that involves termination fees. CFO Bruce Tanner says that work had already begun on cockpits, radars, and other equipment for the MH-60Rs. He recommends buying them and selling them to allies:

“That would probably be a better deal for the taxpayer than paying close to 100 percent and not getting anything for it…. The cost to terminate partially built helicopters is pretty significant relative to the cost to actually finish those helicopters.”

Sources: Reuters, “Lockheed says costly for Pentagon if it cancels MH-60 helicopters”.

Apr 21/14: Mexico. The US DSCA announces Mexico’s formal request for up to 18 UH-60M Black Hawk Helicopters and associated equipment, at an estimated cost of up to $680 million. The order could also include up to:

  • 40 T700-GE-701D Engines (36 installed and 4 spares)
  • 42 Embedded Global Positioning Systems/Inertial Navigation Systems (36 installed and 6 spares)
  • 36 M134 7.62mm gatling guns
  • 5 Aviation Mission Planning Systems
  • 18 AN/AVS-9 Night Vision Goggles
  • 1 Aviation Ground Power Unit
  • Communication security equipment including AN/ARC-210 RT-8100 series radios and Identification Friend or Foe (IFF) systems
  • Plus aircraft warranty, air worthiness support, facility construction, spare and repair parts, support equipment, publications and technical documentation, personnel training and training equipment, site surveys, tool and test equipment, and other forms of US Government and contractor support.

The principal contractors will be Sikorsky in Stratford, CT; and GE in Lynn, MA. If congress doesn’t block the sale, and Mexico negotiated a contract, implementation may require the assignment of an additional 3 US Government and 5 contractor representatives, who would be in country full-time for 2 years to support delivery and training. Sources: DSCA #14-10, “Mexico – UH-60M Black Hawk Helicopters”.

DSCA: Mexico request (18)

April 15/14: MYP-8. The Pentagon is trying to find ways not to break their MYP-8 multi-year contract with Sikorsky, given the likely effects on the Army’s Black Hawk fleet. Defense News goes a step further, and reports that Sikorsky officials are saying that any cancellation of the Navy buy would cancel the entire contract, destroying multi-year procurement for the US Army. Sources: Defense News, “DoD Looking for Ways Not To Break MH-60R Helicopter Deal”.

Apr 11/14: Unmanned UH-60M. Sikorsky successfully demonstrates autonomous hover and flight operations, using a UH-60MU from the US Army Utility Helicopters Project Office (UH PO). The project is called MURAL (Manned/Unmanned Resupply Aerial Lifter), and uses technology from Sikorsky’s July 2013 Matrix research program and an advanced Ground Control Station (GCS).

Sikorsky began this work in 2007, but they only signed MURAL’s CRADA (Cooperative Research & Development Agreement) with the US Army Aviation Development Directorate (ADD) in 2013. Sikorsky has also been flying its own SARA (Sikorsky Autonomy Research Aircraft) helicopter since July 26/13. The long-term goal is to avoid conceding the unmanned helicopter resupply market to Lockheed Martin’s K-MAX, the MQ-8C Fire Scout, etc. Making their core H-60 helicopters “optionally manned” is a strong competitive position, if they can pull it off. Sources: Sikorsky, “Optionally Piloted Black Hawk Demonstrator Helicopter Takes Successful First Flight”.

April 9/14: MYP-8. Sikorsky director of maritime programs Tim Healy points out that the US Navy’s proposed cancellation of 29 helicopters within the current multi-year deal has consequences. One involves the likelihood of higher prices for US Army Blackhawks, which are still being purchased. The other is more basic:

“This is not a legal issue. This is a confidence issue…. If multiyear contracts are negotiated and then not followed through … industry is back to making year-to-year calculations and investments because you never know when the next year’s contract is going to be canceled.”

That would be the rational approach, but industry enters into these contracts in order to reduce the odds of program cutbacks and cancellation in an irrational political environment. In other words, the contracts are primarily political acts. Our take: cancellation will dent industry’s credence in these contracts, but won’t make much difference. Companies will still rush to sign them, until and unless they see a behavior pattern that destroys their belief in this strategy. Sources: Reuters, “U.S. Navy move to ‘break’ multiyear deal worries industry-Sikorsky”.

March 4-11/14: FY15 Budget. The USAF and USN unveil their preliminary budget request briefings, but it takes another week to release detailed documents. FY 2015 orders are unaffected: 8 MH-60S will end production for the US Navy, and 29 MH-60R helicopters will be bought as planned. On the other hand, the planned FY 2016 close-out order for 29 MH-60R helicopters is gone.

The cut is linked to the planned removal of 1 carrier air wing (to 10) and cap in the number of LCS ships at 32. The problem is twofold. One, the air wing would have to be put back if the Navy does decide to fund USS George Washington’s mid-life RCOH in FY 2016. Two, the 20 subsequent LCS buys are supposed to be replaced by ships with frigate-like capabilities, and those ships will need ASW helicopters. Navy officials said that advance procurement funds for FY 2016 were still present in the FY 2015 budget, and the Navy could reverse course. They’re under a multi-year procurement deal, so unless there’s a resale of some kind that’s allowed within the terms, you’d have to think that the penalty fees for cancellations would be high. Sources: USN, PB15 Press Briefing [PDF] | Defense News, “US Navy Budget Plan: Major Questions Abound”.

Jan 9/14: FY 2014 USN. Sikorsky in Stratford, CT receives a $549.9 million contract modification, funding the base airframes and some integration for 18 MH-60S and 19 MH-60R helicopters, plus advance procurement for years 4 & 5 of the multi-year deal; and associated sustaining engineering, program management, systems engineering, and other support.

Work will be performed in Stratford, CT, and will be complete by Dec 31/15 (W58RGZ-12-C-0008, PO 0126).

USN 2014: 18 MH-60S, 19 MH-60R

Dec 23/13: FY 2014 Army. A $724 million contract modification buys the initial set for program year 3: 33 UH-60M helicopters, 24 HH-60M helicopters, plus the associated associated program management, systems engineering, provisioning, technical publications, and integrated logistics support. Funding to buy long-lead material for the next year is also normal, but this modification includes long-lead funding for years 4 & 5 as termination liability. All funds are committed immediately, using US Army FY 2014 other procurement budgets.

Work will be performed in Stratford, CT, and the contract runs until June 30/15 (W58RGZ-12-C-0008, PO 0127).

33 UH-60M + 24 HH-60M

Dec 20/13: Saudi Arabia. Sikorsky in Stratford, CT receives a $105.3 million contract modification to contract “to modify 8 UH-60M Black Hawk Helicopters to a General Service Configuration in Support of the Saudi Arabian National Guard.” The contract number indicates that these machines are purchases under the MYP-8 multi-year deal. Essentially, they’re buying 8 UH-60Ms as an initial order under the Oct 20/10 DSCA request to export up to 72 machines.

One bid was solicited with one received. Work will be performed in West Palm Beach, FL and in Saudi Arabia. US Army Contracting Command in Redstone Arsenal, AL acts as the Saudis’ agent (W58RGZ-12-C-0008, PO 0089).

Saudi Arabia: 8 UH-60Ms

Dec 5/13: Austria. The US DSCA announces Austria’s formal export request for 3 UH-60Ms and associated equipment, worth up to $137 million. The principal contractor will be Sikorsky in Stratford, CT, with engines from General Electric in Lynn, MA. Austria already has 9 earlier model S-70A-42 aircraft in its inventory. The full request includes:

  • 3 standard UH-60Ms with designated unique equipment and Government Furnished Equipment (GFE)
  • 7 T700-GE-701D Engines (6 installed and 1 spare)
  • 8 Embedded Global Positioning Systems with Inertial Navigation
  • 8 AN/AVS-9 Night Vision Goggles
  • Communications gear including AN/VRC-92 SINCGARS, AN/ARC-201D, AN/ARC-210, AN/ARC-220, and AN/ARC-231 radios.
  • 3 Aviation Survivability Equipment (ASE)
  • 3 Aviation Mission Planning Systems
  • 1 Transportable Black Hawk Operations Simulator (TBOS)
  • 1 Aviation Ground Power Unit
  • Plus Identification Friend or Foe (IFF) systems, aircraft warranty, airworthiness support, tool and test equipment, spare and repair parts, site surveys, facility construction, support equipment, communication equipment, publications and technical documentation, personnel training and training equipment, and other US Government and contractor support.

Austria won’t need any additional foreign support personnel in country. Sources: DSCA 13-69.

DSCA: Austria request (3)

FY 2013

MYP-8 signed; USAF and US Army exercise options. MH-60S
(click to view full)

Sept 27/13: Support. Sikorsky in Stratford, CT receives a 3-year, $84 million cost-plus-fixed-fee indefinite-delivery/ indefinite-quantity contract for support services. They’ll provide incidental H-60 Black Hawk materials for foreign military sales and other government agency customers. Note that the award isn’t restricted to H-60M helicopters.

Funding and performance locations will be determined with each order. The contract was solicited via the Web, with 1 bid received by US Army Contracting Command – Redstone Arsenal (Aviation), Redstone Arsenal, AL, is the contracting activity (W58RGZ-13-D-0177).

Sept 27/13: MH-60M DVE. The Technical Applications Contracting Office in Fort Eustis, VA issues 3 contracts to develop and field “the degraded visual environments (DVE) system.” DVE will “integrate information from [MH-47E/G and MH-60K/L/M helicopter] sensors,” in order to help aircrews perm their missions through rain, fog, sand brownouts, etc. Dust-driven brownouts are an especially prevalent killer in many operating theaters, and the advanced sensors already on board US SOCOM’s helicopters offer an interesting option for cutting through the clutter. See also: US Army, “Army acquiring ‘brown-out’ assistance for helos” for additional context regarding this area in general. This area is being pursued by a number of US military programs, and by a number of private companies.

The 60-month SOCOM DVE contracts were awarded from 5 offers received in response to the FBO.gov solicitation, and they will run until Aug 31/17. Winners include:

Rockwell Collins in Cedar Rapids, IA wins a maximum $22.4 million indefinite-delivery/ indefinite-quantity, cost reimbursement contract, with $1.3 million in FY 2013 research, development, test and evaluation funds committed immediately for task order 0001 (H92241-13-D-0008).

Sierra Nevada Corp. in Sparks, NV receives a maximum $22.6 million indefinite-delivery/ indefinite-quantity, cost-plus-fixed-fee DVE contract, with $624,013 in FY 2013 research, development, test and evaluation funds committed immediately for task order 0001 (H92241-13-D-0010).

Boeing in Philadelphia, PA wins a maximum $23 million indefinite-delivery/ indefinite-quantity, cost-plus-fixed-fee DVE contract, with $2.1 million in FY 2013 research, development, test and evaluation funds committed immediately for task order 0001 (H92241-13-D-0011).

Aug 21/13: No CVLSP. The US Air Force cut their planned UH-1 Huey replacement program from the FY 2013 budget. Now they’re planning to refurbish their existing UH-1N fleet for another 10 years of service in securing nuclear launch sites, and ferrying people around Washington. The Hueys will add night vision compatible cockpit lighting, crash worthy seats, a helicopter terrain awareness warning system, and traffic collision avoidance. The USAF will also pick up about 26 used UH-1Ns from the US Marines, and have begun with 3 helicopters already.

Even the 10 year horizon isn’t fixed, and the service could choose to keep the helicopters running longer. Bottom line: replacement with H-60s is a long way away, unless a Huey crashes with a prominent member of an appropriations committee on board. Defense News, “USAF Planning Decade-Long Huey Extension”.

June 13/13: Army FY13. Sikorsky Aircraft in Stratford, CT receives a $244.9 million firm-fixed-price modification to by an unspecified number of UH-60M Black Hawk helicopters, using FY 2013 procurement funds.

It would appear that the $804.4 million Nov 16/12 buy didn’t fully fund FY 2013’s plan for 71 helicopters, which makes sense given Pentagon cost estimates of around $18 million per machine. $1,049.3 million / 71 = $14.8 million per, which is closer to the mark given the price of added engines, avionics, etc. (W58RGZ-12-C-0008, PO 0077).

May 8/13: Thailand. Sikorsky in Stratford, CT an $11.4 million firm-fixed-price contract modification, to buy 1 UH-60M base helicopter and related equipment for Thailand. The cumulative total face value of this multi-year contract is now $4.819 billion. US Army Contracting Command in Redstone Arsenal, AL manages the contract on behalf of their FMS client (W58RGZ-12-C-0008, PO 0055).

Thailand: 1 UH-60M

April 10/13: FY 2014 Budget. The President releases a proposed budget at last, the latest in modern memory. The Senate and House were already working on budgets in his absence, but the Pentagon’s submission is actually important to proceedings going forward. See ongoing DID coverage.

The UH-60M/ HH-60M budget line is interesting, because it plans for 64 more buys than the base multi-year deal. Instead of 318 helicopters over FY 2012 – 2016, the total becomes 382. The framework is obviously able to handle those planned options, and MYP-8 overall has a top limit of 916 helicopters for the US Army, US Navy and foreign customers.

March 25/13: Saudi. Sikorsky in Stratford, CT receives a $49 million firm-fixed-price contract. This modification will provide engineering and configuration services to 4 utility helicopters for Saudi Arabia. The contract number indicates a MYP-8 purchase, and the amount indicates that there’s a base helicopter order still to come. There are ways that could be done outside the purview of standard contract announcements.

Work will be performed in Stratford, CT with an estimated completion date of Dec 31/16. One bid was solicited, with 1 bid received by US Army Contracting Command in Redstone Arsenal, AL (W58RGZ-12-C-0008).

Saudi Arabia: 4 UH-60Ms?

Dec 11/12: +37 Navy. Sikorsky Aircraft Corp. in Stratford, CT receives a $563.8 million firm-fixed-price contract modification, which funds the Navy’s 2nd Program Year of the MYP-8 multi-year program. Sikorsky tells us that Year 2 buys 18 MH-60S Production Lot 15 helicopters for delivery in 2013-2014, and 19 MH-60R Production Lot 11 Helicopters for delivery in 2014. The contract also covers sustaining engineering, and the usual set of advance materials for the next production lots.

Work will be performed in Stratford, CT, with an estimated completion date of Sept 30/16. One bid was solicited, with 1 bid received (W58RGZ-12-C-0008).

Nov 16/12: +71 Army. Sikorsky Aircraft Corp. in Stratford, CT received an $804.4 million firm-fixed-price contract modification. Sikorsky confirms that this fully funds Year 2 of MYP-8: 47 UH-60M and 24 HH-60M Black Hawk helicopters, plus associated engineering, program management, provisioning, technical publications, and support.

Work will be performed in Stratford, CT with an estimated completion date of June 30/14. One bid was solicited, with 1 bid received (W58RGZ-12-C-0008).

FY 2012 MH-60R
(click to view full)

Sept 25/12: +22 Army. A $242.2 million firm-fixed-price contract modification to buy UH-60M Plus-Up Helicopters, which are over and above the yearly baseline buys under MYP-8. Sikorsky confirms that the contract covers 22 helicopters, but doesn’t include support.

Work will be performed in Stratford, CT and will run until Sept 16/16. One bid was solicited, with 1 bid received (W58RGZ-12-C-0008).

Sept 25/12: +18 USAF. A $203.4 million firm-fixed-price contract modification, which Sikorsky confirms will buy 18 UH-60M helicopters for the USAF. This appears to be part of the USAF’s Operational Loss Replacement (OLR) program for their HH-60H Pave Hawk combat search and rescue fleet.

Work will be performed in Stratford, CT, with an estimated completion date of Sept 30/16. One bid was solicited, with 1 bid received (W58RGZ-12-C-0008).

Sept 18/12: UH-60 CPTD. Sikorsky announced the award of a Combat Tempered Platform Demonstration (CTPD) contract from the U.S. Army’s Aviation Applied Technology Directorate (AATD). This program will builds upon previous work by Sikorsky Innovations to develop key technologies including: a zero-vibration system, adaptive flight control laws, advanced fire management, a durable main rotor, a more damage tolerant airframe, and better “full-spectrum crashworthiness.” Asked about the program, Sikorsky said that:

“We currently have nothing slated for the next two block upgrades that come from the Combat Tempered Platform Demonstration program. We are testing how components play together.”

Sikorsky Innovations will have more than 15 partnering companies, including Lord Corporation, Phyre Technologies, and Firetrace Aerospace.

July 18/12: #500. Sikorsky delivers the 500th H-60M helicopter since production began in December 2007, which divides up as 400 UH-60Ms (incl. 73 exported) and 100 HH-60M MEDEVAC helicopters. Most of those deliveries which were made under the MYP-VII contract, which ended this month.

Sikorsky adds that the US Army plans to order 956 UH-60M and 419 HH-60M aircraft through 2026, a total of 1,375 H-60M models. By then, the Army’s total H-60 Black Hawk fleet, including upgraded UH-60As and UH-60Ls, is expected to reach more than 2,100 helicopters. Sikorsky.

UH-60M #500

July 11/12: MYP-8. Sikorsky Aircraft Corp. in Stratford, CT receives a firm-fixed-price umbrella contract to buy and provide initial support for up to 916 UH/HH/MH-60 Helicopters for the US Army and US Navy, with Foreign Military Sales options. The Pentagon announces the initial total as $2.828 billion, but Sikorsky puts the base contract’s total value at $8.5 billion. Sikorsky also breaks up the MYP-8 contract into an $8.5 billion base for 653 helicopters, plus options for up to 263 more that could push the contract as high as $11.7 billion. Interestingly, Sikorsky adds that:

“To reach the full baseline value of $8.5 billion, the services are ordering aircraft in the base agreement to be sold via the U.S. Government’s Foreign Military Sales program. These aircraft include Foreign Military Sale (FMS) UH-60M aircraft for several allied countries and MH-60R SEAHAWK anti-submarine and anti-surface warfare helicopters for the Royal Australian Navy… BLACK HAWK and SEAHAWK aircraft deliveries under the new contract will begin this month.”

Those totals compare to $7.4 billion for 537 helicopters in MYP-7, plus 263 additional options that Sikorsky said could push the contract to $11.6 billion for 800 helicopters. Orders ended up falling well short of that total, but the options were there.

Recent DSCA requests indicate that interest in Sikorsky’s helicopters is rising, so MYP-8 looks set to produce more machines. Work will be performed in Stratford, CT, but the helicopters themselves are made on 4 separate production lines located in West Palm Beach, FL, and in its Stratford, CT final assembly facility. The contract is announced by the Pentagon as running until Sept 30/16 (end of FY 2016). Sikorsky, on the other hand, cites December 2017 as the end date. Subsequent Pentagon documents continue to insist on FY 2012 – 2016, even though MYP-7 technically ended on Dec 31/12.

The bid was solicited through the Internet, with 1 bid received by US Army Contracting Command in Redstone Arsenal, AL (W58RGZ-12-C-0008). Since only Sikorsky can make those helicopters, it isn’t surprising that only 1 firm responded. See also Sikorsky.

MYP-VIII Framework

Feb 13/12: The USA’s FY 2013 budget documents include a proposal for the next multi-year deal. Helicopters bought will be in basically the same configuration as MYP-VII machines, and overall savings vs. single year buys add up to $850.3 million:

“This proposed Multiyear Procurement (MYP) covers the purchase of 318 UH-60M/HH-60M BLACK HAWK aircraft and 193 Navy MH-60 helicopter airframes in FY 2012 through FY 2016 under a single, five year fixed price type contract. The MYP strategy is structured to achieve $850.3 Million (TY$) in cost savings over the five year period with $502.9M realized in the Army Aircraft Procurement Appropriation and $347.4M in the Navy Aircraft Procurement Appropriation. This proposed Joint Service multiyear contract for the procurement of Army UH-60M/HH-60M aircraft and Navy MH-60R/S aircraft follows a currently executing (FY 2007 through FY 2011) Joint Service MYP between the Army, Navy, and Sikorsky Aircraft Corporation for H-60 helicopters. The UH-60M/HH-60M,MH-60S, and MH-60R aircraft .being procured on the proposed multiyear contract are essentially the same configuration as those being procured on the current FY07-11 multiyear contract. The MYP will include a Variation in Quantity Clause allowing for minor fluctuation of aircraft quantity and provide baseline pricing for potential Foreign Military Sales. The U.S. Army and Navy met SECDEF certification requirements on March 1, 2011.”

Additional Readings

Readers with corrections, comments, or information to contribute are encouraged to contact DID’s Founding Editor, Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so.

Tags: myp-viii, myp-8

Catégories: Defence`s Feeds

LM-KAI T-50 Collaboration Begins Flight Ops | Qinetiq Snares $1.26B Contract from UK MoD | HAL’s LCA Deemed Too Heavy; India to Import For Now

lun, 05/12/2016 - 00:58
Americas

  • Officials from Lockheed Martin have announced that the T-50A trainer has commenced flight operations in order to test the plane’s capabilities. A joint effort between LM and Korea Aerospace Industries (KAI), the T-50A is based off the legacy T-50 and is being offered to the USAF’s T-X program. For combat training, the aircraft incorporates air-to-air and air-to-ground weapons, an avionics suite with electronic warfare capabilities, and a multi-mode radar.

  • The US Navy plans to invest in more F/A-18E/F Super Hornets as a means of stopping a shortfall in capabilities. Delays in the fielding of the F-35C, longer-than-expected maintenance times for older model Hornets, and higher usage rates, have resulted in a predicted shortfall of 70 fighters over the next number of years. If implemented, the plan could receive funding in the fiscal 2018 budget and keep the Super Hornet production line in continuation for the next several years.

Middle East & North Africa

  • Egypt is to receive 65 LANTIRN targeting pods under the US Excess Defense Articles (EDA) program. Manufactured by Lockheed Martin, the navigation and targeting pod systems will come from existing USAF stocks and are most likely to be used on Cairo’s fleet of F-16 Fighting Falcons. Some of Egypt’s F-16s already operate LM’s AN/AAQ-33 Sniper targeting pod, LANTIRN’s successor.

Europe

  • Lockheed Martin has been contracted to supply two US government-configured C-130J-30 Super Hercules aircraft to France. Work on the $133.4 million deal is expected to be completed by August 2020. A stretched-out version of the C-130J, the Super Hercules acquisition comes as France tries to fill a cargo and refueling capability gap created by problems related to the development and delivery of the A400M by Airbus.

  • Qinetiq has been awarded a $1.26 billion contract by the UK MoD to modernise the test and evaluation services it provides at three sites across the UK. The company has provided test and evaluation services to the MoD since 2004, under a 25-year long-term partnering agreement (LTPA). The new deal will include the modernization and continued operation of air ranges at MoD Aberporth in Wales and MoD Hebrides in Scotland, plus test aircrew training at the Empire Test Pilots’ School at Boscombe Down in Wiltshire.

  • Armored personnel carriers from the German Armed Forces will be transferred to the Lithuanian Army in a deal worth $1.71 million. 168 M577 vehicles will be delivered in stages between 2017 and 2018. While not normally equipped with defensive weapons, the vehicles are primarily used as a tactical operations center by warfighters on the battlefield.

Asia Pacific

  • India’s navy has decided not to deploy the HAL Naval Light Combat Aircraft (LCA) onboard its aircraft carriers. In what will be seen as a blow to the country’s growing indigenous industry, the fighter was deemed too heavy and did not meet the service’s requirements. New Delhi will instead import a foreign-made carrier-borne fighter while still encouraging India’s Defence Research and Development Organisation (DRDO) to develop the Naval LCA.

  • Japan’s Air Self-Defense Force has received their first F-35A, joining Israel and South Korea as the first three export customers for the Joint Strike Fighter. The fighter will join an international training fleet at Luke Air Force, where pilots from partner countries will receive instruction. Six aircraft are currently under contract and Tokyo plans to purchase 28 over the next five years, eventually procuring 42.

Today’s Video

Maiden flight of the Certifiable Predator B:

Catégories: Defence`s Feeds

Building a Better LANTIRN

lun, 05/12/2016 - 00:57
F-16 with twin LANTIRNs
(click to view full)

Targeting pods are a very affordable way to upgrade existing aircraft with precision strike and surveillance capabilities. As such, their popularity in the modern age is likely to remain very strong for the foreseeable future. At present, the top offerings on the market include the Northrop-Grumman/ RAFAEL LITENING series (vid. the recent Dutch order), Lockheed’s Sniper XR/Pantera, and Raytheon’s ATFLIR. All are 3rd generation offerings, successors to the early 2nd generation LITENING all-in-one pods and the first-generation LANTIRN (Low Altitude Navigation and Targeting Infrared for Night) twin-pod set.

LANTIRN pods may be first-generation technology, but they still fly with a number of air forces and were included as the pods specified for Greece’s new F-16Ds. As such, Lockheed’s announcement that it is selling upgraded LANTIRNs to Denmark offers an interesting look at potential opportunities at the lower end of the global market.

(click to view larger)

As noted earlier, LANTIRN is a system of two pods. The AN/AAQ-13 navigation pod provides high-speed penetration and precision attack assistance in all flying conditions, using a terrain-following radar and a fixed infrared sensor to display an image of the terrain in front of the aircraft on a heads-up display of cockpit viewscreen. This helps the pilot maintain a pre-selected altitude above the terrain and avoid obstacles, while flying at high speed and using mountains, valleys and the cover of darkness to avoid radar detection.

The AN/AAQ-14 targeting pod is just what it says: a laser and infrared targeting pod to assist in the delivery of precision weapons like Paveway laser-guided bombs, AGM-65 Maverick missiles, et. al.

(click to view larger)

The Royal Danish Air Force will pay Lockheed Martin $20 million for the latest round of upgrades to their 13 LANTIRN targeting pods, and also requests another 3 LANTIRN ER (extended range) pods. The 26-month contract includes organizational-level spares, maintenance training and pilot familiarization training.

As part of Lockheed’s 8-year partnership with the RDAF, its LANTIRN targeting pods were upgraded in a previous contract to include a CCD TV, a 40,000-ft. laser and a laser spot tracker. LANTIRN ER adds a third-generation mid-wave forward-looking infrared (FLIR), an infrared pointer, an inertial measurement unit to assist with positioning fixes guided weapons, and extended range software. It also simplifies the original pod design and eliminates many parts in an effort to increase reliability and reduce operation and support costs. See Lockheed press release.

While the LANTIRN ER is significantly less capable than the LITENING AT pod recently ordered by the Dutch for their F-16s, the deal’s economics are worth noting: $20 million for 13 upgrades of existing systems plus 3 pods (16), vs. just over $40 million for 20 LITENING AT 3rd generation targeting pods and spares.

Update

December 5/16: Egypt is to receive 65 LANTIRN targeting pods under the US Excess Defense Articles (EDA) program. Manufactured by Lockheed Martin, the navigation and targeting pod systems will come from existing USAF stocks and are most likely to be used on Cairo’s fleet of F-16 Fighting Falcons. Some of Egypt’s F-16s already operate LM’s AN/AAQ-33 Sniper targeting pod, LANTIRN’s successor.

Catégories: Defence`s Feeds

Russia Protests Ukraine Plan to Test Fire Near Crimea | US State Dept Clears Sale of JASSM-ER to Poland | USAF Contracts Raytheon in $22M FMS to Taiwan

jeu, 01/12/2016 - 01:27
Americas

  • Defense officials from Bolivia are exploring the possibility of purchasing A-29 Super Tucanos from Brazil. The Embraer-made light attack aircraft will be used to clamp down on illegal activity, namely drug and mineral trafficking, along both nation’s 3,423 km shared border. According to Brazil’s defense ministry, Bolivian interest in the counter-insurgency plane was raised during a meeting to deepen bilateral relations.

  • Saab will provide further training and simulation systems under a contract awarded by the US Army. According to the company, the contract falls under the service’s Program Executive Office of Simulation, Training and Instrumentation (PEO STRI), and will provide OSAG 2.0 interoperability upgrades for the 7th Army Training Command’s Deployable Instrumentation System, Europe (DISE) and Combat Vehicle Tactical Engagement Simulation System (CVTESS). The new capability will allow the US, who use the MILES Communicaton Code (MCC), to train seamlessly with the European partners, who mostly utilize the OSAG 2.0 standard.

Middle East & North Africa

  • Tunisia’s government has admitted that US drones are patrolling its border with Libya, to help fend off attacks from the Islamic State. Speaking on television, President Beji Caid Essebsi maintained that the UAV’s were unarmed and denied that they took off from Tunisian air bases. Essebsi also stated that the surveillance drones would be given to Tunisia after training conducted by 70 US soldiers, although exact numbers remain unclear.

Africa

  • The Nigerian Air Force has announced that they have refurbished 13 aircraft, some of which have returned to active duty putting down an insurgency led by the jihadist group, Boko Haram. In addition, ten more aircraft will be added to their fleet, including four new Mi-35N attack helicopters, at least three ex-Brazilian Air Force Super Tucanos, and three JF-17 Thunders from Pakistan. This will add to a recent order of Super Mushshak trainers and a soon to be completed refurbishment program of older helicopters and light aircraft to carry out surveillance and counter-insurgency missions.

Europe

  • Plans by Ukraine to test fire missiles near Crimea have been met with protest from Russia. Having annexed the peninsula in 2014, Moscow is regarding the planned tests as violating “Russia’s sovereign air space,” summoning the Ukrainian defense attache to hand over a protest note ahead of the December 1 & 2 launches. Meanwhile, Russian military buildup in Crimea continues.

  • The US State Department has cleared the potential sale of Joint Air-to-Surface Standoff Missiles – Extended Range (JASSM-ER) to Poland. Estimated at $200 million, if passed Warsaw will receive 70 AGM-158B JASSM-ER missiles, 2 AGM-158B Flight Test Vehicles, 2 AGM-158 Mass Simulant vehicles, and 1 Captive Carry variant of the AGM-158B Flight Test Vehicle. F-16 C & D upgrades, along with training services, and additional supporting equipment are also included in the deal.

  • In the wake of Brexit and Trump, the European Union unveiled its biggest defense funding and research plan in more than a decade as part of a broader push to revitalize defense cooperation within the bloc. Also included is the European Commission’s proposed plan for a 5 billion-euro ($5.3 billion) fund to let governments club together to buy new helicopters and planes to lower costs. Another plan, according to EU officials, to let the EU’s common budget and its development bank invest in military research, would open the door to new drones, cyber warfare systems and other hi-tech gear.

Asia Pacific

  • Raytheon has been contracted by the USAF to provide upgraded missile warning radar centers to Taiwan in a $22 million foreign military sale. Under the deal, the company will upgrade Taiwan’s Early Warning Radar Surveillance Radar Program Missile Warning Center to address obsolescence concerns. The new system will warn operators of incoming ballistic missile attacks, as well as track threats, and provide accurate determination of threat versus non-threat objects.

Today’s Video

Aster 30 SAMP T:

Catégories: Defence`s Feeds

Support & Smokes for Brazil’s Super Tucanos

jeu, 01/12/2016 - 00:58

T-27: Smoke & Mirror
(click to view full)

Brazil has kicked off the LAAD 2013 expo with a pair of announcements related to their Super Tucano fleet. The first is a 5-year, BRL 252 million (about $127.4 million) contract for Embraer to support the FAB’s 92 remaining “A-29″/EMB-314 Super Tucanos, of the 99 originally purchased. Programa de Suporte Logístico Integrado (PSLI) is a fixed-price contract with performance requirements, mirroring Britain’s recent advances in reducing support costs using “contracting for availability.” PLSI covers materials and planning, supplies for scheduled and unscheduled maintenance, repairs, and overhauls of components, support for the landing gear and propeller groups, and specialized technical support. The basic service package is BRL 223 million, with BRL set aside for unexpected services. Embraer.

The number of combat-capable Super Tucanos is about to shrink, however, as Brazil’s national “Esquadrilha da Fumaca” (“Smoke Squadron”) aerobatic team will get 12 of the FAB’s A-29s. They’ll replace the current “T-27″/ EMB-312 Tucanos with a larger, higher performance aircraft. Embraer received BRL 26.1 million ($13.2 million) guaranteed: a BRL 16 million contract to convert the Super Tucanos for aerobatics by stripping off unneeded weight and adding provisions for smoke pods, etc., plus a BRL 10.1 million service package. Another BRL 5.9 million ($3 million) could be added if the FAB picks up the option for ground support equipment and additional services. Embraer.

Update

December 1/16: Defense officials from Bolivia are exploring the possibility of purchasing A-29 Super Tucanos from Brazil. The Embraer-made light attack aircraft will be used to clamp down on illegal activity, namely drug and mineral trafficking, along both nation’s 3,423 km shared border. According to Brazil’s defense ministry, Bolivian interest in the counter-insurgency plane was raised during a meeting to deepen bilateral relations.

Catégories: Defence`s Feeds

H&K to End Deals with Non-NATO Members | Norway to Spend $1.15B on P-8A’s | Italian Navy Launches First Aster Missiles

mer, 30/11/2016 - 00:58
Americas

  • An undisclosed member of the Patriot Integrated Air and Missile Defense System program has contracted Raytheon to provide additional Patriot missile capabilities. The $225 million deal comes just 45 days after Poland requested the same product from the US government, and when Raytheon received another contract from the Netherlands to upgrade their own systems. Answers on a postcard please.

  • US Senator Bernie Sanders has urged President-elect Donald Trump to leverage defense contracts in order to save jobs at an Indiana air conditioner manufacturer. The factory, owned by United Technologies, is slated to move operations to Mexico, at a loss of 1,400 jobs. As firebrand outsiders vying for the working vote, both men had used the announcement earlier this year to challenge Hillary Clinton as an example of how trade deals hurt US workers. With Trump now the insider, Sanders warned “it is not good enough to save some of these jobs” and said Trump should use as leverage United Technologies’ defense contracts, Export-Import Bank financing, and tax breaks. While Trump does not take office until January 20, he may already be feeling the Bern.

Middle East & North Africa

  • Just ten days after the US State Department cleared the sale of 40 warplanes to Kuwait, the Gulf monarchy wants more. Major General Lafi al-Azmi, chief of the military’s Armament and Procurement Authority, said that Kuwait plans to purchase 28 more F-18 Super Hornets as well as return a number of outdated F-18s in their inventory as part of the purchase deal. Details of the sale will only be revealed once it is officially signed.

Africa

  • The UN Security Council will vote this week on whether to ban arms sales to South Sudan. A US proposed resolution, the move comes after a summer of ethnic violence due to rivalries between President Salva Kiir, an ethnic Dinka, and his former deputy Riek Machar, a Nuer, which has led to claims of genocide. The rivalries had previously led to civil war in 2013 but a tentative peace agreement was signed in 2015.

Europe

  • From now on Heckler & Koch wares will be for NATO members and friends only, according to reports. Difficulty in obtaining government approval for exports is being cited as the main reason, and from now on the company will “only sell to countries that are democratic and free from corruption and that are members of NATO or NATO members’ partners.” The new strategy would rule out deals with Saudi Arabia, Russia, Mexico, and India. Not even NATO members are safe, with Turkey – in the middle of a military, political and civil purge since a failed coup during the summer – also in the firing line for being freezed out.

  • As part of governmental approval to increase defense spending, Norway plans to drop some $1.15 billion on five P-8A Poseidon maritime patrol aircraft. With Norway sharing a long maritime border with Russia, the acquisition comes as Nordic and Baltic states ramp up modernization and capability efforts in order to dissuade Moscow from trying to pull another “Crimea” in the Baltics. Delivery of the planes will take place between 2021 and 2022 and will replace the current fleet of six P-3 Orion and three DA-20 Jet Falcon aircraft.

  • Exercises by the Italian Navy have seen the successful first launch of the Aster 30 missile. A requirement for the missile’s qualification program, the test was part of the Italian Surface-To-Air Extended Self Defense system program. Capable of hitting targets over 62 miles away from their launch sites, the new system will greatly enhance defensive capabilities of naval vessels.

Asia Pacific

  • With the US looking to replace Russian-made Afghan helicopters and India offering to fix them, it’s quite natural to be confused about what is actually going on with Afghan military procurement. The issue is muddied further with US regime change just around the corner, and presidents who have rather different foreign policy objectives. At present the US DoD has requested additional funding to refurbish and update 53 older-model US military UH-60 Black Hawk helicopters for the Afghans, enough to replace the current fleet of Russian-designed Mi-17 helicopters. But with a Donald Trump presidency and potentially warmer relations with Russia, will the hundreds of millions of dollar price tag for refurb, transfer and retraining ever come about?

Today’s Video

Third flight of Japan’s X-2 stealth demonstrator:

Catégories: Defence`s Feeds

Pages